ROTARY/KIWANIS/LIONS CLUBS CAMDEN, AR AUGUST 13, 2013 Mike Dumas President Ouachita River Valley Association
2
ORVA HISTORY 1893 – “Ouachita River Improvement Association” 1950 – “Ouachita River Valley Association”
3
AREA OF OPERATION
4
ORVA MISSION Non-profit organization that promotes development of water and land resources Major focus is on operation, maintenance and completion of Ouachita-Black Rivers AR and LA, Navigation Project Represent the private sector of the economy
5
ORVA ORGANIZATIONAL STRUCTURE OFFICERSBOARD OF DIRECTORS COMMITTEES - President - Louisiana – 7 - Navigation - Vice President - Arkansas – 7 - Finance - Sec./Treasurer - Membership - Nominating GENERAL MEMBERSHIPSTAFF ~100 - Executive Director
6
PROJECT/STUDY 1. Ouachita-Black Navigation Project, Red River to Camden, AR 2. Ouachita-Black Navigation Project, Red River to Camden, AR – Bank Stabilization 3. Ouachita-Black Navigation Project, Red River to Camden, AR – Little River Addition 4. Ouachita River Levees, LA 5. Arkansas Lakes - Ouachita, DeGray, and Greeson 6. Ouachita River Watershed Study, AR and LA ORVA SUPPORTED STUDIES/PROJECTS OUACHITA RIVER BASIN, AR AND LA
7
Ouachita-Black Navigation Project 4 Locks and Dams and Channel Dredging to Provide 9-foot Depth 337 Miles of Channel from Confluence of Red River to Camden, AR
8
OUACHITA-BLACK WATERWAY SYSTEM “MUCH MORE THAN NAVIGATION”
9
OUACHITA-BLACK RIVERS NAVIGATION PROJECT FUNDING Fiscal Year 2006-2010 Fiscal Year Fiscal Year Fiscal Year Avg. 2011 2012 2013 $10.9 mil $7.5 mil $7.4 mil $7.5 mil $3.2 mil supplemental $10.6 mil
10
Dredge Butcher Conducting Dredging Operations on the Ouachita River $3.1 Million Needed Annually for Dredging Operations
11
INLAND MARINE TRANSPORTATION SYSTEM STUDY GUIDELINES TABLE
12
REDUCTION IN OPERATIONAL SERVICES OUACHITA-BLACK RIVERS NAVIGATION PROJECT -Effective July 29, 2012 - 3 shifts to 2 shifts - Jonesville and Columbia Locks & Dams – 18 hrs. daily -Felsenthal & Thatcher Locks & Dams – 16 hrs. daily -FY 13 (October 1, 2012) - Jonesville and Columbia Locks & Dams – No Change - Felsenthal & Thatcher Locks & Dams – No Change - FUTURE – Jonesville and Columbia – No change -Felsenthal and Thatcher Lock and Dams – Remote Control of Water Levels -No change to pool levels
13
COMMERCIAL RECREATION Jonesville 500 211 Columbia 269 44 Felsenthal 22 179 Thatcher 0 173 COMMERCIAL AND RECREATIONAL LOCKAGES OUACHITA-BLACK RIVERS NAVIGATION PROJECT JULY 29, 2012 – JULY 2, 2013
15
MISSISSIPPI RIVER COMMISSION BRIEF PUBLIC MEETING AUGUST 21, 2013 VICKSBURG, MS William B. Hobgood Executive Director Ouachita River Valley Association
17
ORVA ANNUAL CONVENTION AUGUST 27-28, 2013 CHARLES O. ROSS CENTER CAMDEN, AR
18
ORVA 2013 ANNUAL CONVENTION AUGUST 27-28, 2013 CAMDEN, AR PRINCIPAL FEDERAL SPEAKERS - Senator Mark Pryor - COL John Cross, District Engr - Congressman Tom Cotton - Mr. David Frewald, USGS - MG John W. Peabody, MVD STATE SPEAKERS -Mike Armstrong, Assistant Director, AR Game and Fish Commission PRIVATE SPEAKERS -Ed Grimm – Senior vice President, Martin Marine -- Keith Ouchley – LA Nature Conservancy
20
ORVA MEMBERSHIP DRIVE - Help “Tell the Story” - Strength in Numbers -ORVA Brochure
23
CONCLUSIONS: - NAVIGATION PROJECT FACES DIFFICULTY - NEED LOCAL CITIZENS SUPPORT - ORVA WILL “STAY THE FIGHT”