1 Status of SPIRAL 2 NuPECC meeting Bordeaux October 28th 2006 Marek Lewitowicz GANIL
Introduction to SPIRAL 2 Design goals of the baseline project Status of the construction Letters of Intent for SPIRAL 2

2 The scientific case of SPIRAL 2
ISOSPIN DEGREES OF FREEDOM IN NUCLEAR FORCES Heavy and Super Heavy Elements Position of drip-lines Equation of State Role of Isospin N=Z rp-process r-process path r-process path r-process path Shell structure far from stability Spins&Shapes Spins & Shapes Spins & Shapes Neutrons for science Atomic & solid state physics Radiobiology & Isotope production Haloes & Structures in the Continuum SPIRAL 2 White Book: 4/25/2017 M. Lewitowicz

3 CIME Cyclotron Production Caves:: RNB Heavy-Ion ECR
Existing GANIL Accelerators CIME Cyclotron Acceleration of RI Beams E < 25 AMeV, 1 - 8 AMeV for FF Direct beam line CIME-G1/G2 caves Existing GANIL Exp. Area Production Caves:: RNB C converter+UCx target 1014 fissions/s p- & n-rich RNB (transfer, fusion-evaporation, DIC) Low energy RNB DESIR RFQ p,d source LINAG Exp. Hall Superconducting LINAC: Stable-Ion beams E ≤ 14.5 AMeV HI A/q=3, 1mA E ≤ 20 A MeV p,d, 4He (A/q=2 ions), 5mA Possible extension to A/q=6 ions Heavy-Ion ECR 4/25/2017 M. Lewitowicz

4 High Intensity stable beams
SPIRAL 2 Layout LINAG Exp. Area High Intensity stable beams DESIR facility Low energy RIB GANIL LINAG Building RIB Production Building 4/25/2017 M. Lewitowicz

5 Regions of the Chart of Nuclei Accessible with SPIRAL 2 Beams
light beams heavy ions RIB induced reactions Production of radioactive beams/targets: (n,), (p,n) etc. SHE N=Z Isol+In-flight Transfermiums In-flight Fusion reaction with n-rich beams Fission products (with converter) Fission products (without converter) Deep Inelastic Reactions with RIB High Intensity Light RIB 4/25/2017 M. Lewitowicz

6 SPIRAL 2 yields of fission fragment after acceleration
compared to other RNB facilities (best numbers for all) Today Today 4/25/2017 M. Lewitowicz

7 SPIRAL 2 Budget in M€ as stated in the financial agreement signed on Sept. 4th 2006
(additional cost) (manpower) (Total cost) Detectors are not included in the investment budget of SPIRAL 2 but France (CEA,CNRS, Region BN) contributes to all equipments constructed at GANIL typically at the level of 30 to 50%. 4/25/2017 M. Lewitowicz

8 Stable ion beams from LINAG
SPIRAL 2 Schedule Reference Project Def. Safety authorizations Building construction Under discussion Construction of LINAG Stable ion beams from LINAG Reference Planning RIB 4/25/2017 M. Lewitowicz

9 Project Organisation Int. Labs & Partners Sections: Labs:
CEA /DSM CNRS/IN2P3 Project direction Scientific Community Accelerator RIB production Infrastructure GANIL Scientific Advisory Committee Project management STEERING COMMITTEE Int. Labs & Partners National & international Partners Technical Advisory Committee Sections: Labs: 4/25/2017 M. Lewitowicz

10 International Agreements Physics & technique
ISOLDE - Letter of agreement signed in 2005 Romania - MoU signed on 28/02/06 Dubna - MoU signed 14/03/06 SARAF (Israël) MoU signed in May 2006 Grant request from the UK community Direct beam line CIME-G1/G2 BARC – TIFR (Bombay) MoU in preparation (draft) RF system, software LEA* with LNL Legnaro (Italy) in preparation (second draft) MoU (mainly on d->n converter) to be signed in the coming months LIA* with RIKEN in preparation (draft) Poland - LEA in preparation Triumf - MoU in preparation (first draft) Argonne MoU in preparation (first draft) Oak Ridge MoU under discussion Technical meetings SPIRAL 2 - FAIR *LEA = Lab. Europ. Associé SPIRAL 2 on the ESFRI list *LIA = Lab. Int. Associé

11 Status of SPIRAL 2 NuPECC meeting Bordeaux October 28th 2006 Marek Lewitowicz GANIL
Introduction to SPIRAL 2 Design goals of the baseline project Status of the construction Letters of Intent for SPIRAL 2

12 Choice of the baseline project
LINAG Exp. Area DESIR Choice of the HI source and injector GANIL Road Number of fissions/s Number and type of production caves 1+ Ion Sources Parallel-beams operation CIME-G1/G2 direct beam line 4/25/2017 M. Lewitowicz

13 LINAG Accelerator & Exp. Area
Priorities Construction of the injector A/q=3 Second injector A/q=6 (extension) should be designed as soon as possible 4/25/2017 M. Lewitowicz

14 LINAG Experimental Area
n-tof Priority Construction of 3 halls and at least S3 hall fully equipped S3 Interdisciplinary Research LINAG beam 4/25/2017 M. Lewitowicz

15 RIB production Building
Two RIB production caves 1 “red zone” + 1 “yellow zone” Preserve the possibility to deliver in the future two simultaneous RIB for (DESIR & CIME) Reserve space for an RFQ cooler and HRS (High Resolution Mass Separator) 1+ Ion Sources Priorities: Selective ion sources Surface ionisation Laser (collaborations!) ECR 4/25/2017 M. Lewitowicz

16 Base-line project Summary of priorities
Choice of the HI source and injector for LINAG Phoenix V2 source - for the beginning of operation + development of metallic beams Second injector q/A=1/6 should be designed as soon as possible LINAG Experimental Area Construction of 3 experimental halls. S3 hall fully equipped Design goal for number of fiss./second As close as possible to 1014 fiss./s (safety and building cost limitations) RIB Production Building Priority for Selective 1+ Ion Sources (IS, laser, ECR) RIB production caves: 1 “red zone” & 1 “yellow zone” Preserve a possibility to deliver in the future two simultaneous RIB for (DESIR & CIME) Reserve space for the RFQ cooler and HRS (High Resolution Mass Separator) DESIR DESIR building included in the SPIRAL 2 buildings construction phase CIME-GI/G2 Direct beam line To be constructed before the SPIRAL 2 buildings Discussed by SC, SAC & TAC 4/25/2017 M. Lewitowicz

17 Status of SPIRAL 2 NuPECC meeting Bordeaux October 28th 2006 Marek Lewitowicz GANIL
Introduction to SPIRAL 2 Design goals of the baseline project Status of the construction Letters of Intent for SPIRAL 2

18 Vane tip displacements at 20 and 38 kW
CEA / DAPNIA Saclay RFQ prototype Vane tip displacements at 20 and 38 kW displacements are < 60µm, (max. allowed ± 100µm) 20 kW 38 kW

19 SC Cavities CEA/DSM/DAPNIA: Prototype cavity (beta 0.07)
CNRS - IPN Orsay: Prototype cavity (beta 0.12)

20 The Driver Accelerator construction has started …
Injector (LEBT lines) Review 06/09/06 Preparation of Contracts Dipoles & Q-poles 2006 / 2007 (RFQ) 17/10/06 Announcement Sept 2006 Call for tenders Oct/Nov 2006 Contract Dec/Jan. 2007 SC Linac (Niobium) July 2006 Sept/Oct 2006 Nov. 2006 (QWR A+B) 25-26/09/06 QWR A : 1st Qr 2007 2007 QWR B : Sept. 2006 Sept/Oct 2006 (RF Amplifiers) (Two qualifying Amplifiers KW) May 2006 Call for Tenders July/Sept 2006 Oct. 2006

21 Production Modules (d->n converter + UCx target + ion source systems)
Recent solution proposed by Thales Target & ion source Ganil design Recent design (under study) Ganil design

22 Status of SPIRAL 2 NuPECC meeting Bordeaux October 28th 2006 Marek Lewitowicz GANIL
Introduction to SPIRAL 2 Design goals of the baseline project Status of the construction Letters of Intent for SPIRAL 2

23 SPIRAL 2 - Letters of intent (LoI) Towards new detectors for SPIRAL 2
Procedure and schedule: Call for LoI - May 26th 2006 (just after the SP2 SAC meeting on May 17, 2006) Dead-line for LoI: October 2nd, 2006 Evaluation of LoI by SAC - October 19&20th 2006 Results of the evaluation will be communicated to the proponents by the beginning of November 2006. Call for proposals launched in 2007 Signature of MoU by collaborations proposing the construction of new equipment in 4/25/2017 M. Lewitowicz

24 SPIRAL 2 - Letters of intent (LoI) Resume
SPIRAL 2 Letters of Intent in numbers: 19 LoIs submitted 25 oral presentations of the LoIs at the Open session of SAC on October 19th 2006 LoIs signed by 595 physicists (without double counting) (190 from France, 492 from NuPECC member countries) from 34 countries Spokespersons: 50% France, 50% foreigners Written documents of in total 341 pages 4/25/2017 M. Lewitowicz

25 List of LoI for SPIRAL 2 Main Collaborations: DESIR S3
1. The DESIR facility (Decay, Excitation and Storage of Radioactive Ions) (B. Blank) 2. Decay properties of neutron-rich nuclei (Yu. Penionzhkevich, F. Ibrahim) 3. S3: The Super Separator Spectrometer for LINAG Beams (A. Villari, A. Drouart, J. Nolen) 4. From actinides to super-heavy elements with SPIRAL 2: reaction dynamics and structure (Paul Greenlees) 5. Fusion reactions: A probe of multidimensional tunnelling (A. Navin, R. Raabe, A. Shrivastava) 6. Nucleon correlations probed via multiple particle transfer and their influence on sub-barrier fusion (L. Corradi) 7. High-resolution Gamma-ray Spectroscopy at SPIRAL2 (AGATA-EXOGAM II) (W.Korten, B. Wadsworth) ・ Proton drip-line studies and N=Z nuclei (D. Rudolph) ・ Neutron-rich nuclei (A. Gadea) ・ Nuclear shapes and high-spin spectroscopy (A. Görgen) ・ Collective modes in the continuum (S. Leoni) ・ Nuclear electromagnetic moments (G. Georgiev) ・ Spectroscopy of the heaviest elements (P. Greenlees) 8. High-energy -rays as a probe of hot nuclei and reaction mechanisms (J.A. Scarpaci, A. Maj, D. Jenkins) 9. Studying the r process nucleosynthesis with direct reactions (O. Sorlin, K. L. Kratz) 10. α-capture reactions in inverse kinematics relevant to stellar nucleosynthesis (S. Harissopulos F. De Oliveira) 11. Production of radioactive samples for astrophysical interest by (n,p), (n,3He), (n, a) reactions (F. Hammache, M. Heil) 12. Production targets of light radioisotopes for nuclear astrophysics and basic nuclear science studies (M. Hass, D. Berkovits, T.Y. Hirsh) 13. Improving effective forces, mean field based methods, and predictions: dedicated measurements (M. Bender, K. Bennaceur, S. Péru) 14. Direct Reaction Studies of Exotic Nuclear Structure (GASPARD) (D. Beaumel, R. Lemmon, I. Martel ) 15. Direct and Resonant Reactions with an Active Target (M. Chartier, D. Cortina, P. Roussel-Chomaz ) 16. Unbound states of neutron-rich isotopes via direct reactions (V. Lapoux) 17. Neutrons For Science (X. Ledoux) 18. Dynamics & Thermodynamics of exotic nuclear systems (F. Gulminelli, G. Poggi, G. Verde) 19. Isospin non-conservation in nuclear states and its implication for the physics beyond the Standard Model (N. Smirnova) Main Collaborations: DESIR S3 AGATA & EXOGAM 2 -ray Calorimeter GASPARD n-tof FAZIA 4/25/2017 M. Lewitowicz

26 SPIRAL 2 Scientific Community Organisation
Scientific Advisory Committee Steering Committee Project management - Project Leader - Scientific Coordinator .. Int. Collaborations SP2 DESIR S3 -GASPARD -… Coordination Committee SPIRAL 2 France Phys. SPIRAL 2 Scientific Coordinators in the IN2P3 & CEA Labs Existing International Collaborations NUSTAR AGATA - EXOGAM - EURONS - EURISOL FAZIA SP2-NUSTAR WG Electr. & DAQ Calorimeter Tracking detectors Neutron detectors ? 4/25/2017 M. Lewitowicz

27 SPIRAL 2 on the ESFRI list
Brussels, 19 October 2006 European Research Infrastructures – 35 projects identified The ESFRI roadmap (see IP/06/1431) identifies 35 large-scale infrastructure projects at various stages of development. This Memo gives brief details of the projects concerned. The full text of the roadmap, which contains longer descriptions of the projects can be found at: …Isotope beams with SPIRAL 2 The project aims at delivering rare (radioactive) isotope beams with intensities not yet available with present machines. SPIRAL 2 will reinforce European leadership in the field of nuclear physics based on exotic nuclei. 4/25/2017 M. Lewitowicz

28 Status of SPIRAL 2 NuPECC meeting Bordeaux October 28th 2006 Marek Lewitowicz GANIL
Introduction to SPIRAL 2 Design goals of the baseline project Status of the construction Letters of Intent for SPIRAL 2

29 LoI SPIRAL 2 - Participants
4/25/2017 M. Lewitowicz

30 Choice of the HI source and injector
Priorities Phoenix V2 source - for the beginning of operation + development of metallic beams In 2-3 years a choice of the best next-generation HI source (extension) 4/25/2017 M. Lewitowicz

31 DESIR Facility for experiments with low energy RIBs
DESIR, RFQ Cooler & HRS DESIR Facility for experiments with low energy RIBs Cooling/Bunching Spectroscopy of trapped beams Laser Spectroscopy Decay studies Other purposes Fundamental Interactions 1500 m2 Priorities: DESIR building included in the SPIRAL 2 building design phase DESIR building and equipment as well as RFQ et HRS to be financed by international collaborations (not included in the current construction budget) 4/25/2017 M. Lewitowicz

32 Production Modules d->n Converter -> vertical wheel
Bearings under study, to reduce friction Several solutions to be tested Oven -> measurements with a Tantalum oven and a Carbon target at 1500°C Next measurements at 2000°C before the end of this year UCx target: calculation to reduce the size and weight of UCx Solutions for the waste management under study IPNOrsay-Ganil