2 Topics Status -Overall -Build 3a Deployment Search Service Status Report Service Status Build 3b and Beyond Next Steps November 28-29, 2012System Design and Deployment Update2

3 Overall Status Validate software in place supporting validation of PDS4 labels using XML Schema and Schematron files. Initial data access and transform software in place for working with PDS4 data. Harvest and Registry software in place to support EN and Node registration of PDS3 and PDS4 data. Search software in place supporting catalog- level search. Report software in place waiting to be populated with web logs. November 28-29, 2012System Design and Deployment Update3

4 Build 3a Status Upgraded the Data Search interface to remove the dependence on the PDS3 catalog database. Refactored the Search Service to better support PDS4. Kept up with Information Model changes. Added support for PDAP search protocol. Initial support for PDS4 data transformation. Correct issues discovered during Build 2c testing. November 28-29, 2012System Design and Deployment Update4

5 Build 3a Status Deployment Engineering Node -Deployment of the core components replacing the central catalog. Running side-by-side with PDS3 system for six months. -Existing search interfaces reworked to utilize the PDS4 infrastructure. Discipline Nodes -Phased deployment of the core components at the Nodes is in process. -Once deployment is complete, Nodes may begin local registration of their PDS4 test bundles. -PDS3 data sets/products may be registered as well. November 28-29, 2012System Design and Deployment Update5

6 Build 3a Deployment Engineering Node November 28-29, 2012System Design and Deployment Update6

7 Build 3a Deployment Discipline Node November 28-29, 2012System Design and Deployment Update7

8 Node Deployment Status A couple of early adopters have tackled the installation. -Have received procedure/documentation suggestions and some RFAs. Actively working with Atmospheres to install the software at their Node. The other Nodes have been contacted to arrange installation. -Most were waiting for an updated RDD. The RDD now includes the Node installation procedure. -http://pds- engineering.jpl.nasa.gov/pds2010/development/3.0.0/r elease/index-3.0.0.htmlhttp://pds- engineering.jpl.nasa.gov/pds2010/development/3.0.0/r elease/index-3.0.0.html November 28-29, 2012System Design and Deployment Update8

9 Build 3a Deployment PDS3/PDS4 Product Registration November 28-29, 2012System Design and Deployment Update9

10 Search Service Status PDS4 core infrastructure running at the PDS Engineering Node. Working with the IPDA to register ESA data sets in search via PDAP protocol. -Working on some metadata quality issues before integration with operational search. Worked with Atmospheres to register archive information web sites for Cassini and Phoenix data access. Use demonstration process to affirm the architecture and then expand. November 28-29, 2012System Design and Deployment Update10

11 Search Deployment November 28-29, 2012System Design and Deployment Update11 Archive Pages Facet-Based Search Linkable Results Page

12 Report Service Status Sawmill software installed at the EN. -Upgraded to the latest version from the vendor. Ready to pull log files from the Nodes and setting up a mechanism for push capability. Planned operational phases: -Initiate population of the service and initial report configuration (December 2012). -Generate PDS-wide web log reports. (March 2013) -Generate registry-based reports. (October 2013) November 28-29, 2012System Design and Deployment Update12

13 Build 3b and Beyond Continue to support Information Model changes. Add support for content validation. Tune the Search Service index. Add support for product-level search. Develop initial Transport Service. Add support for additional transformations. Add support for package generation. Integrate distribution and transformation capabilities. Upgrade PDS web presence. November 28-29, 2012System Design and Deployment Update13

14 Next Steps Work with the Nodes on Report Service population. Continue working with the Nodes to deploy Build 3a software locally. Continue Build 3b development. -Align tool development with the tool plan November 28-29, 2012System Design and Deployment Update14