Presentation on theme: "Lucent Technologies – Chris Miller"— Presentation transcript:

1

2 Lucent Technologies – Chris Miller
TDM – IP Migration to Remain Competitive Current Network Architecture Next Generation Network Five Migration Areas Step by Step Approach Sample Schedule Program Risks Summary

3 TDM – IP Network Migration Current Network Architecture
OSS PDH/SDH DWDM STP STP NCP Switch Apps Mobile Apps MSC Voice Switching Routers & Switches Data Private Line Voice Mobile Independent Services Overlays Service-Specific Access Coax, Radio, Optical Transport

4 TDM – IP Network Migration Next Generation Network Architecture
Application Layer Session Control Layer Media & Endpoint Layer Access Networks Consumer Enterprise Voice Data Video Content Services Call/Session Control PSTN INTERNET 3G Mobile CMTS OLT DSLAM Center Optical Transport DWDM SONET/SDH IP Multiservice Edge IP/MPLS Core ULH Applications Uniform Application Architecture Access-Independent Services All-Optical Transport Multi-Service Access Node Common Call/Session Control

5 2. Network Database Migration
TDM – IP Network Migration Five Migration Dimensions 1. Transport Migration PDH/SDH DWDM 4. OSS Migration STP STP 2. Network Database Migration NCP 3. Signaling / IN Migration Switch Apps 5. Traffic Migration Mobile Apps MSC Voice Switching Routers & Switches Data Private Line Voice Mobile

6 TDM – IP Network Migration Program Scope
Project Planning Network Planning and Design Deployment Engineering & Installation Integration & Optimization Program Mgt Quality Mgt Risk Mgt Network Migration Transport Network Database Signaling / IN OSS Synchronization Traffic Office Consolidation Equipment Removals

7 Voice Network Migration Step by Step Approach
Transport / Optical Migration The migration of the current transport network to the new optical network in preparation for vacating offices and migrating traffic to new service platforms Network Database Migration Traffic Migration Signaling Migration OS Migration / Synchronization

8 Voice Network Migration Step by Step Approach
Transport / Optical Migration Network Database Migration Enables the pre-provisioning of VoIP network elements by collecting data from the existing network and reformatting it through the use of a custom designed tool set to load into the VoIP elements. Traffic Migration Signaling Migration OS Migration / Synchronization

9 Voice Network Migration Step by Step Approach
Transport / Optical Migration Network Database Migration Traffic Migration Movement of traffic from the current switch to the Gateway Border Elements through the use of scripted DCS bridge and roll process or other migration techniques. Signaling Migration OS Migration / Synchronization

10 Voice Network Migration Step by Step Approach
Transport / Optical Migration Network Database Migration Traffic Migration Signaling Migration Enables migration of switched access trunks to the next generation VoIP Border Element, transparent to other interfacing Service Providers OS Migration / Synchronization

11 Voice Network Migration Step by Step Approach
Transport / Optical Migration Network Database Migration Traffic Migration Signaling Migration OS Migration / Synchronization Accelerates migration through automated updates of OSS Databases in synchronization with network element traffic migration OSS Data Cleansing OSS Migration Tool and Process

12 TDM – IP Network Migration Sample Schedule (Deployment & Migration)
Apr Jun Sep Dec Jan Jun Jul Dec Jan Mar Apr Jun Dec FP3 Arch. FP2 FP4 FP1 Appl. Migration Planning Solution Development Applications Development Net. Design Solution Execution Transport Migration Deployment; Engineering, Installation & Field Integration Current FA Complete: 7/7/2000 Current GA Complete: 8/7/2000 Based on only preliminary dates provided by Dev. Proj. Mgmt. Dev. Proj. Plan targeted for approval on 1/31/00 Planning and Tool Development Network Database Migration Planning & Interface Development Signaling / IN Migration Planning and Tool Development OS Synchronization and Migration Planning and Tool Development Traffic Migration Equip. Removals 1 9

13 TDM – IP Network Migration Program Risks
Target Architecture Issues Technical Operational Major Program Schedule Delays Primary Source of Cost Overruns Capital Operating Delays in New Service Introduction Delayed Revenue Customer Dissatisfaction Caused by Insufficient Attention to Transport, Network Database, Signaling/IN, OSS Migration Lack of Coordination among Multiple Vendors Inadequate Program Management Operational Issues during Transition Provisioning, Billing, Maintenance OS Migration Must Account for Transitional Network Dual Provisioning Database Synchronization Lost Revenue Increased Operational Costs

14 Summary TDM – IP Migration is a move forward in technology.
A complete methodology and approach is vital to the success of the project. Understanding the risks of the project will be important to the overall plans A complete beginning to end plan is necessary to cover all areas.