1 Proposed Retail Rate Change Effective January 1, 2008

2 Process 2006 Retail Financial Plan & Water Rate Study 2006 Retail Financial Plan & Water Rate Study Capital Improvement Program Changes – schedule and costs Capital Improvement Program Changes – schedule and costs Operating Costs Update Operating Costs Update Capital Funding Update Capital Funding Update Retail Financial Plan Update Retail Financial Plan Update

3 Retail Financial Plan & Water Rate Study Recommended Five-Year Rate Structure: Recommended Five-Year Rate Structure: 200713% 200713% 200813% 200813% 200911% 200911% 20108% 20108% 20113% 20113%

4 Capital Improvement Program Update Deferred Joint Water Storage Tank Project at least 5- years $4M Deferred Joint Water Storage Tank Project at least 5- years $4M Deferred Sierra Pump Station improvements required by Joint Water Storage Tank Project $500K Deferred Sierra Pump Station improvements required by Joint Water Storage Tank Project $500K Reduced Auburn-Folsom Road 24” Pipeline Project cost by $1.5M - cost savings of partnering with Placer County Reduced Auburn-Folsom Road 24” Pipeline Project cost by $1.5M - cost savings of partnering with Placer County Eliminated Kokila Reservoir Pressure Reducing Station (due to optimizing pressures within Bacon Zone) $200K Eliminated Kokila Reservoir Pressure Reducing Station (due to optimizing pressures within Bacon Zone) $200K Eliminated Bacon Pump Station stand-by generator (due to optimizing pressures to reduce pumping requirements within the Bacon Zone) $600K Eliminated Bacon Pump Station stand-by generator (due to optimizing pressures to reduce pumping requirements within the Bacon Zone) $600K Re-scheduled several steel water line replacements based on current condition assessments to defer costs Re-scheduled several steel water line replacements based on current condition assessments to defer costs Added $300k for retail area groundwater study Added $300k for retail area groundwater study

5 Impact of CIP Update Eliminated First Recommended Debt Financing Eliminated First Recommended Debt Financing Reduces operating cost by $500,000 Reduces operating cost by $500,000 Altered Timing and Size of Succeeding Debt Financings Altered Timing and Size of Succeeding Debt Financings

6 Operating Costs Update Decreased: Conservation programs Decreased: Conservation programs Increased: Engineering professional services, Transmission & Distribution maintenance Increased: Engineering professional services, Transmission & Distribution maintenance Pressure Zone Testing Pressure Zone Testing

7 Capital Funding Update Increased connection fees received Increased connection fees received Increased property taxes received Increased property taxes received

8 Retail Financial Plan Update Recommended Five-Year Rate Structure: Recommended Five-Year Rate Structure: 200713% 200713% 20087% 20087% 20097% 20097% 20107% 20107% 20114% 20114%

9 Additional Consideration Dry year planning and funding Dry year planning and funding