Power Failure XYZ Port Facility Maritime Security Drill Briefing for Controllers date.

Similar presentations


Presentation on theme: "Power Failure XYZ Port Facility Maritime Security Drill Briefing for Controllers date."— Presentation transcript:

1 Power Failure XYZ Port Facility Maritime Security Drill Briefing for Controllers date

2 Power Failure Emergency Response – Contingencies Power Failure Drill D421

3 Power Failure Scope Date, time, location Aim Objectives Desired outcomes Controllers Players Materials Scenario Master Events List Controller Tasks Communications Safety Debrief

4 Power Failure Drill number: X/XX Date: Start Time: Location: Estimated End Time:

5 Power Failure Aim To enhance the proficiency of port facility staff in responding to a power failure

6 Power Failure Objectives Operations staff to switch on backup power within the time limit as specified in the PFSP Security staff to respond to power failure according to procedure in the PFSP.

7 Power Failure Desired outcomes Staff will be able to: Switch on backup power quickly in the event of a main power failure. Respond appropriately to a power failure.

8 Power Failure Control Team Chief Controller: PFSO, Mr. AAA Controllers  Chief Electrical Engineer – Mr. XXX  Electrical Engineer – Mr. YYY Safety officer

9 Power Failure Players Security staff on duty Operations staff on duty

10 Power Failure Materials Selected lighting zone in the Port Facility.

11 Power Failure Scenario There has been several blackouts in recent times. Staff have to be prepared to get the electrical supply available again quickly and to additional measures to ensure the security of the port facility is not compromised while electrical supply is not available.

12 Power Failure Master Events List S/NTimeEventFromToMeans of Delivery Expected Response Remarks 0011930All participants in position 0021935Drill commence Chief Controller AllWalkie Talkie None“Drill Start” 0031955Security lighting failed ControllerSecurity staff Physically cut off power Inform ops department, take actions to maintain security 0042100Drill completed Chief Controller AllWalkie Talkie Dispersal of personnel/ equipment “Drill End” 0052101Restore main and emergency power supply Chief Controller AllRestore all services Tested to be fully functional 0062130Hot WashChief Controller AllN/A

13 Power Failure Controller Tasks Select an area where both main and backup power can be isolated. Shut down the power at the appropriate time. Main and backup power to be restored at the end of the drill

14 Power Failure Communications Mobile phone Walkie-Talkie  Player – Ch YY  Controllers – Ch ZZ

15 Power Failure Drill StartThe drill is to commence Drill SuspendThe drill is temporarily suspended Drill GoThe drill is to resume from where it was suspended Drill StopThe drill is to be terminated (prematurely) Drill EndThe drill is completed Drill, Drill, DrillThe message or statement that follows this preamble relates to the drill only, and is not to be confused with real activity Code words

16 Power Failure Safety Physical safety of personnel is paramount There is to be no physical contact between player and controllers acting as intruders, etc. Security staff are not to use abusive language when talking to controllers acting as “intruders” Do not neglect the safety of equipment

17 Power Failure Debrief Location: Secretary: Attendance 

18 Power Failure Any questions ?