International Council on Large Electric Systems Brasilia Workshop 22 September 2003 TRANSMISSION ACCESS AND CONGESTION MANAGEMENT O. Lavoine-RTE-France.

Similar presentations


Presentation on theme: "International Council on Large Electric Systems Brasilia Workshop 22 September 2003 TRANSMISSION ACCESS AND CONGESTION MANAGEMENT O. Lavoine-RTE-France."— Presentation transcript:

1 International Council on Large Electric Systems Brasilia Workshop 22 September 2003 TRANSMISSION ACCESS AND CONGESTION MANAGEMENT O. Lavoine-RTE-France

2 International Council on Large Electric Systems Brasilia Workshop 22 September 2003 What is congestion ? First of all, congestion is an operational technical problem : the network can not accommodate all the requested withdrawals and injections, due to the fact that security criteria must be respected : N-1 or more, Voltage.

3 International Council on Large Electric Systems Brasilia Workshop 22 September 2003 Technical means to solve a congestion In the daily operation : Topological modifications, Modification of the requested withdrawals and injections (by re-dispatching). In a longer term : Modifications of the maintenance plans (for generation plants and for network elements), Development of new lines (when possible !).

4 International Council on Large Electric Systems Brasilia Workshop 22 September 2003 Main economical consequences of a congestion Low electricity price zone High electricity price zone Congestio n : lack of capacity In a competitive markets on both sides of the congestion If in the south, the market is not competitive Decoupling of markets, Congestion rent = Difference of price * Transmission Capacity Low electricity price zone Market power of some power plants Need of a strong regulation to reduce market power !

5 International Council on Large Electric Systems Brasilia Workshop 22 September 2003 Two majors different situations An easy situation : The congestion is inside a control area, All technical means can be controlled by one centralized control centre. A much more difficult situation : The congestion is at the limit of two (or more) countries, There is a strong need to co-ordinate control centres and market mechanisms.

6 International Council on Large Electric Systems Brasilia Workshop 22 September 2003 Economic principles The treatment of congestion should respect the following theoretical economic principles: Efficiency (application of nodal pricing approaches ?), Limit power markets, No discrimination. Practically, any system must be easily understandable by concerned users.

7 International Council on Large Electric Systems Brasilia Workshop 22 September 2003 Example of an internal congestion : South-East of France Congestion N-1 line 400 kV line Marseilles Nice Toulon 225 kV line Rhône Valley Boutre

8 International Council on Large Electric Systems Brasilia Workshop 22 September 2003 Example of an international congestion : The Alps to Italy Limited Capacity (The Alps ) Italy : high price France, Germany, Switzerland : low price

9 International Council on Large Electric Systems Brasilia Workshop 22 September 2003 CIGRE C5 objectives CIGRE SC 5 has formed a dedicated WG to congestion questions with experts coming from many different countries. A first objective is to have a worldwide state of art of experiences. A second objective is to classify these experiences according to different situations. Each time, national and international situations have to be considered.