Presentation is loading. Please wait.

Presentation is loading. Please wait.

Conformity Determination Graciela Lubertino, PhD November 7, 2012.

Similar presentations


Presentation on theme: "Conformity Determination Graciela Lubertino, PhD November 7, 2012."— Presentation transcript:

1 Conformity Determination Graciela Lubertino, PhD November 7, 2012

2  Conforming the amendments of transportation plans  2035 RTP Update  2013 – 2016 TIP To the last revision of the State Implementation Pan for the 1997 8-hr Ozone Standard – classification: “severe”

3  Last conformity (Phase I) was approved by FHWA 9/20/2012  New conformity (Phase II):  Interim managed lanes US 290 and SH 288  Improvements FM 521 in Harris & Brazoria Co  Improvements FM 2234 in Brazoria Co  Connections from SH 288 and IH 610 to Texas Medical Center  The full list of projects is on Appendix 12

4 How we select the conformity years?  Need to conform to all years that we have budgets from the SIP  RFP SIP: 2011, 2014, 2017, 2018  AD SIP: 2018  The last year of the transportation plan: 2035  The years cannot be more than 10 years apart: 2025

5 Draft Air Quality Results YearNOx Emissions (tons/day) NOx Budget (tons/day) VOC Emissions (tons/day) VOC Budgets (tons/day) 2011128.18135.7469.7575.17 201491.1195.2659.9061.84 201760.8667.9548.5053.23 201848.7249.2245.8445.97 202532.9649.2238.4245.97 203535.1749.2245.7145.97 http://www.h- gac.com/taq/airquality_model/conformity/2012_phase2/default.aspx or http://tiny.cc/3f2cnw

6 DRAFT-Timeline  Beginning September 2012 - Start updating the networks  Mid September - Mid October 2012  Complete travel demand model runs  Start conference calls with conformity consultation partners  Start conformity air quality calculations and documentation  October 26, 2012 – TPC information item of Conformity finding  End October 2012 – Submit air quality results to conformity consultation partners  October 31, 2012 – Start public comment period  November 7, 2012 – TAC information item of Conformity finding  November 13, 2012 – Public meeting  November 29, 2012 – Close of public comment period.  November 30, 2012 - TPC final approval of Conformity finding.  Beginning December 2012 –Conference call with conformity consultation partners to finalize the Conformity Finding.


Download ppt "Conformity Determination Graciela Lubertino, PhD November 7, 2012."

Similar presentations


Ads by Google