1 Fall Technology Report - 2008 New Installations for 2008-2009 Update on Technology Priorities Report to the Board October 2, 2008

2 SMART Board Installations 90 new boards District Total: 436

3 Projector Installations 81 new projectors District Total: 497

4 Sound Field Installations 65 new sound fields District Total: 471

5 Senteo Student Responders Senteo Deployments 47 new classroom sets District Total: 66 sets

6 Equipment Request Process Building Level Site Planning Technology Committee Prioritize needs Submit a formal request District approval Align with technology …goals and priorities

7 Update on Priorities Identified in 2007-2008 Current Identified Priorities 1.Disaster recovery planning 2.Web-based curriculum mapping 3.Single sign-on 4.Increase student access to technology devices 5.Replace current data reporting system (Turnleaf) 6.Increase instructional technology support for staff

8 Priority 1: Disaster Recovery Planning Completed Work Failover systems in place for critical applications hosted by Minnetonka Redundant backup storage in place at high school Next Steps Redundant fiber link scheduled in partnership with the City of Minnetonka Offsite storage backup for mission critical data (out of county) Fire suppressant system scheduled for installation Fall/Winter 2008

9 Priority 2: Web-based Curriculum Mapping Completed Work Selected Global Scholar’s Curriculum mapping software during review process Pilot Implemented in grade 5 Language Arts and 6-12 Math Demonstration at Board Study Session on August 26

10 Priority 3: Single Sign-On Completed Work Selected Version3 as product for Single Sign-On Works with SharePoint as central Web portal Single sign-on has been established for staff, integrating more that a dozen web based applications Next Steps Student single sign-on in development for second semester Parent single sign-on in development for 2009-2010

11 Priority 4: Increase Access to Student Devices Thin Client pilot at CSE Long term cost savings Low maintenance 10 year Life span MWA and EXC next HP 2133 Mini-Note pilot at GRV Upfront cost savings Elementary friendly

12 Priority 5: Replace Current Data Reporting System Completed Work Retired current system in July Selected Pinnacle’s Data Analytics software during review process Connected to Global Scholar’s curriculum mapping Staff training in August/ September Demonstration at Board Study Session on August 26

13 Priority 6: Increase Instructional Technology Support Completed Work Hired 2 additional Teachers on Special Assignment (TOSAs) joining Dave Eisenmann and Lisa Carlson as instructional technology support Technology professional development classes had the highest attendance in history with over 40 classes this summer with more than 560 attendants Board Presentation on September 4