Presentation is loading. Please wait.

Presentation is loading. Please wait.

2014 Freeway Congestion Monitoring Program MOITS Technical Subcommittee December 9, 2014.

Similar presentations


Presentation on theme: "2014 Freeway Congestion Monitoring Program MOITS Technical Subcommittee December 9, 2014."— Presentation transcript:

1 2014 Freeway Congestion Monitoring Program MOITS Technical Subcommittee December 9, 2014

2 2014 Freeway System Performance Background – Congestion Management Process Congestion Monitoring Program 2014 Freeway Congestion Monitoring – 3 AM and 3 PM Hour Photographic Survey – Sample Size Reduced – One-Second Time Lapse Photography (TLAP) 2

3 2014 Freeway System Performance Status – Draft 2014 System Performance Report on MOITS Website – TLAP Compilation Underway Report – Individual Route LOS with narrative of performance – Top 10 Congested Locations – Highest Density – Top 5 Longest Delay Corridors in AM and PM 3

4 2014 Freeway System Performance Report (continued) – Facility Lane Miles of Congestion Comparison – Peak Period Summary Congested Map – Summary Congested Map for Each Survey Hour – Trends and Major Changes in Traffic Conditions Summary Map Individual Location Comparison – Minor Changes in Traffic Conditions 4

5 2014 Freeway System Performance Next Steps – Review and Comments due by 12/19/2014 – Finalize Draft Report Presentation to Technical Committee and TPB – Finalize TLAP Presentation to MOITS and Other Committees 5


Download ppt "2014 Freeway Congestion Monitoring Program MOITS Technical Subcommittee December 9, 2014."

Similar presentations


Ads by Google