Download presentation
Presentation is loading. Please wait.
Published byAugust Webster Modified over 8 years ago
2
This morning’s agenda Introduction The design concept and the 10 year vision – Dave Stott, Building/design committee chair & Chairman of the elder board The Feasibility Study – Jeff Knauer of Kirby Smith Associates Q&A (in sanctuary, if time permits; in Community Center afterwards) Final instructions and closing prayer
4
Estimated costs New construction = $3,000,000 - $3,250,000 Renovations = $150,000 - $200,000 Sitework = $500,000 - $600,000 Equipment/Furnishings = $200,000 - $250,000 Design/Engineering/Fees = $150,000 - $200,000 Total $4,000,000 - $4,500,000
8
What do we need from you? Prayer Participation from as many of you as possible – Pick up your questionnaire packet today – Sign up today for an interview with Jeff – Due date for all questionnaires is October 20 Prayer
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.