1 Shepherd University WV Route 480 Pedestrian Underpass August 3, 2011

2  Plan  Rendering of Underpass  Profile  Plan of Detour  Schedule  Sample Pictures of Other Underpasses  Sample Pictures of Possible Facades  Lighting Topics to Be Covered

3 Pedestrian Underpass Plan

4 View from West Campus

5 View from Stadium

6 View from Popodicon

7 WV Route 480 Profile

8 Shepherd Grade Road Profile

9  February 2012  Begin Utility Relocation: Water, Sewer, Storm Sewer, & Overhead Utilities  March 2012  Begin Detour Construction  April 2012  Complete Utility Relocation  Complete Detour Construction  May 2012  Close Road & Open Detour Schedule

10  Mid-July 2012  Complete Retaining Wall, Underpass Structure & Roadway  Open Rt. 480 to Traffic  August 2012  Remove Detour at Campus Drive  Connect Campus Drive and Shepherd Grade to Rt.480  Complete Excavation & Sidewalks on Both Sides of Underpass  Open Underpass for Student Use  September 2012  Remove Detour & Restore Bavarian Inn Property  October 2012  Complete Wall Restoration, Cleanup, Seeding & Closeout Schedule

11 Detour Plan

12

13 Underpass with Stone Formliner

14 Golf Course Pedestrian Underpass

15

16 Antietam Drystack Facade

17

18 Missouri Old Cut Ashlar Facade

19 Colonial Stone Facade

20 Proposed Lighting

21 Q&A