Presentation is loading. Please wait.

Presentation is loading. Please wait.

27 - 28 February 2006M. Jacquemet SPIRAL II 27 – 28 February 2006 Marcel Jacquemet.

Similar presentations


Presentation on theme: "27 - 28 February 2006M. Jacquemet SPIRAL II 27 – 28 February 2006 Marcel Jacquemet."— Presentation transcript:

1 27 - 28 February 2006M. Jacquemet SPIRAL II 27 – 28 February 2006 Marcel Jacquemet

2 27 - 28 February 2006M. Jacquemet Spiral II View Spiral II Layout Status of the Project Project Management Main tasks of the Project Team during 2006 Summary  To build project management  To take technical decisions  To begin the Spiral 2 construction  To share the work packages

3 27 - 28 February 2006M. Jacquemet Spiral 2 Layout Super conducting LINAC 40MeV d - 5mA -14MeV/n HI Production building C converter+UCx target  10 14 fissions/s GANIL facility DESIR (LIRAT) Stable Heavy-Ion Exp. Hall CIME Cyclotron Acceleration of RI Beams E < 25 MeV/n, 6-8 MeV/n for FF CIME Cyclotron Acceleration of RI Beams E < 25 MeV/n, 6-8 MeV/n for FF RFQ Heavy-Ion ECR source (A/q=3) 1mA

4 27 - 28 February 2006M. Jacquemet Spiral 2 Layout

5 27 - 28 February 2006M. Jacquemet End of 2004 Technical report published Situation of the APD phase : * Accelerator : APD studies finished * Radioactive Isotope Beams : not completely finished * Infrastructure : not completely finished Status of the project

6 27 - 28 February 2006M. Jacquemet From January to September 2005 Project structure maintained during a “transition period” Objectives :  Contract for definition of the production building  Safety studies and authorisation procedures  R& D  End of APD studies Status of the project

7 27 - 28 February 2006M. Jacquemet May 2005 : Project approved July 2005 : Appointment of Project Leader and Scientific by DSM and IN2P3 Directors October – December 2005 : Organization of the Project Team Status of the project

8 27 - 28 February 2006M. Jacquemet For 2006 : To build project management  Project team  Work breakdown structure  Quality Assurance Plan  Planning and budget To take technical decisions  Separator  Nuclear studies To share the Work packages To begin the Spiral 2 construction Tasks of the Spiral 2 management

9 27 - 28 February 2006M. Jacquemet For 2006 : To build project management To take technical decision To share the work packages To begin the Spiral 2 construction Tasks of the Spiral 2 management

10 27 - 28 February 2006M. Jacquemet Project Management Décideurs Pilote stratégique Pilote opérationnel Sections Laboratoires CEA /DSMCNRS/IN2P3 Project Direction Accélérateur Infrastructure GANIL TAC – SAC Project management Other labs 19 STEERING COMMITTEE National & International Partners Scientific Commu RIB production

11 27 - 28 February 2006M. Jacquemet AcceleratorLeaderT. Junquera Radioactive Isotope Beams Leader M. H. Moscatello Infrastructure Leader Ch. Chéron Quality EngineerM. Perret Gatel System EngineerE. Petit Project Control EngineerPh. Laborie Manpower & budget AssistantX Direction Team Project LeaderM. Jacquemet Project scientist M. Lewitowicz Safety & radioprotection B. Rannou AssistantA. Latour

12 27 - 28 February 2006M. Jacquemet For 2006 : To build project management To take technical decisions To share the work packages To begin the Spiral 2 construction Tasks of the Spiral 2 management

13 27 - 28 February 2006M. Jacquemet Risks analysis and “reduction of the causes” Nov. 05 – May 2006 Nuclear engineering studies April 06 Technical Decisions

14 27 - 28 February 2006M. Jacquemet Nuclear engineering studies April 06 Technical Decisions Target area – RED ZONE Zone IIIA- Yellow zone Intensities limitations to few 10 10 pps (variable limitation according to masses) EXISTING EXPTs AREAS 1+ 1+ N+

15 27 - 28 February 2006M. Jacquemet Technical Decisions target in oven Assembly of 1st prototype of tantalum oven Tests and temperature measurements Converter and UCx target

16 27 - 28 February 2006M. Jacquemet For 2006 : To build project management To take technical decisions To share the work packages To begin the Spiral 2 construction Tasks of the Spiral 2 management

17 27 - 28 February 2006M. Jacquemet Work packages sharing CEA /DSMCNRS/IN2P3 Project Direction Accélérateur Infrastructure GANIL TAC – SAC Project management Other labs STEERING COMMITTEE National & International Partners Scientific Commu RIB production

18 27 - 28 February 2006M. Jacquemet Research Construction DSM DAPNIA/SPhNDAPNIA/SACM – SIS - SENAC DAMDASE et DP2I DENExpertise DPSNExpertise The French Laboratories involved in Spiral 2

19 27 - 28 February 2006M. Jacquemet Research and Construction CEN de Bordeaux-Gradignan Centre de Spectroscopie Nucléaire et Spectroscopie de Masse Orsay Institut de Physique Nucléaire Orsay Institut de Recherches Subatomiques Strasbourg Laboratoire de Physique Corpusculaire de Caen Laboratoire de Physique Subatomique et de Cosmologie Grenoble The French Laboratories involved in Spiral 2

20 27 - 28 February 2006M. Jacquemet Accelerator Work packages Injector Superconducting Linac High Energy Beam Transport Cryogenic system RF System Diagnostics

21 27 - 28 February 2006M. Jacquemet Accelerator Work packages

22 27 - 28 February 2006M. Jacquemet Accelerator Work packages PROJECT InjectorCoordinationC. Van Hille DAPNIA Deutons source DAPNIA H.I q/A=1/3 LPSC RFQ DAPNIA Beam test injector DAPNIA Linac SupraCoordinationR. Ferdinand GANIL Cryomodules A DAPNIA Cryomodules B IPNO RFLPSC Cryomodule tests (hors faisceau) DAPNIA /IPNO

23 27 - 28 February 2006M. Jacquemet RIB Work packages ECS Transport faisceaux radioactifs GANIL existant

24 27 - 28 February 2006M. Jacquemet InjectorCoordination Deuterons Source q/A=1/3 Source RFQ cavity Test of Injector Beam Superconducting Linac Coordination Cryomodules A Cryomodules B RF Power Coupler Cryomodules Tests (without Beam) Accelerator Work packages

25 27 - 28 February 2006M. Jacquemet HEBTCoordination Beam Dump Connexions to : * RIB Production station * Experimental Hall for stable ions Cryogenics Coordination Liquefier - refrigerator He lines Accelerator Work packages

26 27 - 28 February 2006M. Jacquemet RF SystemCoordination RFQ Amplifiers Superconducting cavity amplifiers Low-level RF control Buncher cavities DiagnosticsCoordination Intensity measurement Beam measurements Beam-Loss measurements Diagnostics « Plate forme » Accelerator Work packages

27 27 - 28 February 2006M. Jacquemet RIB Work packages ECS Transport faisceaux radioactifs GANIL existant

28 27 - 28 February 2006M. Jacquemet RIB Work packages Test station for ECS Surface Ion Source Laser Ion Source Febiad Source ECR Source Other targets U Cx Target Converter Coordination – tunning maintennace Converter Target & Sources Intégration ECS tests ECS & Converter environment

29 27 - 28 February 2006M. Jacquemet RIB Work packages Diagnostics Intégration Identification bench Tests Bench Multi- charged Beam Lines Charge Breeder Separator Coordination – Procédure exploitation Beam transport Beam lines for RIB

30 27 - 28 February 2006M. Jacquemet RIB Work packages Diagnostics Beam Lines Cime Cyclotron Coordination – Procédure exploitation Exist. GANIL experim. area

31 27 - 28 February 2006M. Jacquemet For 2006 : To build project management To take technical decision To share the work packages To begin the Spiral 2 construction  Preparation of safety documents  Realization of sub systems

32 27 - 28 February 2006M. Jacquemet Intense Ion sources p,d; HI (mA) RFQ tests in Grenoble (Sept. 2005) Techn. specs for call for tender In progress

33 27 - 28 February 2006M. Jacquemet Linac Accelerator : SC cavities High beta cavity  0.12 ZANON Tested in Orsay Feb 2005 « Pre serial » fabrication : Order in progress before end of 2006

34 27 - 28 February 2006M. Jacquemet Linac Accelerator: SC cavities Low beta cavity  0.07 -ACCEL Tested in Saclay Nov. 2004 « Pre serial » fabrication Order in on month before end of 2006


Download ppt "27 - 28 February 2006M. Jacquemet SPIRAL II 27 – 28 February 2006 Marcel Jacquemet."

Similar presentations


Ads by Google