1 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 ENGINEERING ROLE IN NAVOCEANO SHIP’S ENVIRONMENT Procurement of New Systems. Configuration.

Similar presentations


Presentation on theme: "1 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 ENGINEERING ROLE IN NAVOCEANO SHIP’S ENVIRONMENT Procurement of New Systems. Configuration."— Presentation transcript:

1 1 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 ENGINEERING ROLE IN NAVOCEANO SHIP’S ENVIRONMENT Procurement of New Systems. Configuration Management. Installation Testing and Final Acceptance Ship Modifications (Re-designs) Training Maintenance New Technology

2 2 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 T-AGS-60

3 3 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612

4 4 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 MARY SEARS SONAR SYSTEMS EM121A – 12 KHZ DEEP WATER MULTIBEAM EM1002 – 95 KHZ SHALLOW WATER MULTIBEAM SUBBOTTOM PROFILER – 3.5 KHZ FM AND CW DUAL FREQUENCY SINGLE BEAM – 12 & 33 KHZ EM3000 (HSL) – 300 KHZ SINGLE ARRAY MULTIBEAM EA502 – DUAL FREQUENCY SINGLE BEAM BROAD BAND ADCP – 150 KHZ

5 5 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612

6 6 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612

7 7 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612

8 8 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612

9 9 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612

10 10 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612

11 11 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612

12 12 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612

13 13 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612

14 14 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612

15 15 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 RECEIVER RACK

16 16 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 TRANSMITTER RACK

17 17 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 OPERATOR CONSOLE

18 18 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 DPC MONITORS

19 19 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612

20 20 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612

21 21 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 EM121A Projector Installation

22 22 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 EM-121A PROJECTORS

23 23 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 INSTALLATION

24 24 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 TESTING CONDUCT PERIODIC ACOUSTIC TESTING TO MAINTAIN HIGH LEVELS OF PERFORMANCE FOR ACOUSTIC SYSTEMS - SEVERE BUBBLE SWEEP DOWN - FAILED INITIAL AT-SEA TEST VERY HIGH FLOW NOISE

25 25 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 FINAL ACCEPTANCE TEST ADDED BUBBLE FENCES MODIFIED APPENDAGE FAIRING FLOW NOISE REDUCED TO 49 Db PASSED SAT EXCEPT FOR SHALLOW WATER ACCURACY SIMRAD REDUCED OUTER BEAM ARTIFACTS

26 26 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 INSTALLATION OF BILGE KEELS

27 27 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 BUBBLE SWEEPDOWN FENCES

28 28 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 POST YARD SHAKEDOWN START A LOG OF EVENTS INCLUDING ENVIRONMENTAL CONDITIONS, ETC VERIFY THAT ALL INSTALLATION PARAMETERS AND OFFSETS ARE CORRECT VERIFY THAT HARDWARE IS OPERATING CORRECTLY (BITE TEST) COMPARE CTD PROFILE WITH SSSV SURF DATA/SV PROFILER PERFORM SYSTEM CALIBRATION CONDUCT SMALL AREA SURVEY WITH CROSSING LINES AND 50% OVERLAP EDIT AND PROCESS DATA FOR ACCURACY AND ARTIFACTS DOCUMENT SYSTEM CONFIGURATION MAKE SYSTEM BACKUPS WRITE REPORT ON RESULTS

29 29 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 AVERAGE TIME FRAME FOR A TYPICAL PROCUREMENT AND INSTALLATION OF A MULTIBEAM SYSTEM ON A TAGS-60 CLASS SHIP ( 3 YEARS ) PROCUREMENT ( 12- 24 MONTHS) INSTALLATION ( 4 MONTHS) CONDUCT A SHIPCHECK. DEVELOP AND SUBMIT SPECIFICATIONS TO MSC AND BIDDERS / CONTRACT AWARD. ACTUAL INSTALLATION (1 MONTH). TESTING AND TRAINING (2 MONTHS - OPTIMISTIC APPROACH) CONFIGURATION MANAGEMENT AND DOCUMENTATION.

30 30 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 MAINTENANCE AND HOUSEKEEPING ISSUES SIGNIFICANT TRANSDUCER FOULING HAS BEEN OBSERVED ON SHIPS. SIGNIFICANT ACOUSTIC WINDOW FOULING HAS BEEN OBSERVED ON SHIP.S SONAR FAIRING DAMAGE HAS BEEN NOTED ON T-AGS-CLASS SHIPS.

31 31 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 MAINTENANCE - ADCP TRANSDUCER

32 32 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 MAINTENANCE / DOMES

33 33 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 EM121 RECEIVE ARRAY MAINTENANCE

34 34 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 REFURBISHED SONAR DOMES

35 35 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 EM-1002/1000 TRANSDUCER

36 36 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 MAINTENANCE

37 37 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 MAINTENANCE CONCLUSIONS AND RECOMMENDATIONS SONAR PERFORMANCE IS CONSIDERABLY DEGRADED DUE TO UNDERHULL CONDITIONS. ANY INSTALLATION SHOULD CONSIDER AND INSTITUTE UNDERHULL MAINTENANCE PROGRAMS TO PERIODICALLY GROOM SHIPS TO OPTIMIZE SONAR PERFORMANCE

38 38 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 FUTURE PLANS “SONAR REPLACEMENTS” EM121A STARTING FY06 SUB-BOTTOM PROFILER FY06 EM1002 FY08

39 39 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 EM121A REPLACEMENT REQUIREMENTS 1 X 1 DEGREE FULL OCEAN DEPTH MINIMUM OF 190 BEAMS 150 DEGREE SWATH COVERAGE 0.1 % ACCURACY OUTPUT DEPTH, IMAGERY, RAW HYDROPONE ROLL, PITCH, HEAVE, YAW COMPENSATED INSTALLATION OPTIONS “V” RECESSED IN HULL FLAT ARRAY ON WING INTEGRATED SUBBOTTOM PROFILER

40 40 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 The following slides show a typical installation of a EM120 Deep Water Multibeam Includes a narrow beam subbottom profiler that uses the same receive array as the multibeam. Underhull appendage is slightly more than that on a T-AGS 60 ship. This gondola arrangement also includes all of the other transducers mounted on the existing T-AGS 60 This is one of several installation methods that N61 is considering for the EM121A replacement.

41 41 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612

42 42 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612

43 43 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612

44 44 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612


Download ppt "1 NAVAL OCEANOGRAPHIC OFFICE SYSTEMS ENGINEERING DIVISION N612 ENGINEERING ROLE IN NAVOCEANO SHIP’S ENVIRONMENT Procurement of New Systems. Configuration."