CS-EE 480 Fall 2006 1September, 2006 University of Portland School of Engineering Project Pilot Rock Stanford’s Restaurant and Bar lighting design Team.

Similar presentations


Presentation on theme: "CS-EE 480 Fall 2006 1September, 2006 University of Portland School of Engineering Project Pilot Rock Stanford’s Restaurant and Bar lighting design Team."— Presentation transcript:

1 CS-EE 480 Fall 2006 1September, 2006 University of Portland School of Engineering Project Pilot Rock Stanford’s Restaurant and Bar lighting design Team Ethan Prevost Kristin Glanville Advisor Dr. VanDeGrift Industry Representative Mr. Jonathan Fant

2 CS-EE 480 Fall 2006 2September, 2006 University of Portland School of Engineering Overview Introduction Scorecard Additional Accomplishments Plans Issues/Concerns Conclusions

3 CS-EE 480 Fall 2006 3September, 2006 University of Portland School of Engineering Introduction The project is a lighting design schematic for a Stanford’s Restaurant and Bar being built at the Northgate Mall in Seattle, Washington. A 3-dimensional fully enclosed model will be used to demonstrate the lighting. The intensity of the lighting will be presented using the simulator program AGI.

4 CS-EE 480 Fall 2006 4September, 2006 University of Portland School of Engineering Layout of the Restaurant

5 CS-EE 480 Fall 2006 5September, 2006 University of Portland School of Engineering Scorecard – Previous Plans Visit a Stanford’s Restaurant and take measurements using a light meter. Layout the placement of the light fixtures. Simulate the lights in AGI making sure that we have the proper light levels. Start calculating and setting up the circuits.

6 CS-EE 480 Fall 2006 6September, 2006 University of Portland School of Engineering Additional Accomplishments Determined preliminary light fixtures. Calculated the area of each room. Received our Product Approval and Plan Approval.

7 CS-EE 480 Fall 2006 7September, 2006 University of Portland School of Engineering Plans Begin calculations of wattage per square foot. Layout the initial placement of the luminaires. Simulate the lights in AGI making sure that we have the proper light levels.

8 CS-EE 480 Fall 2006 8September, 2006 University of Portland School of Engineering Milestones NumberDescriptionOriginal 9/26/06 Previous 9/26/06 Present 11/03/06 1Product Approval10/07/06 11/22/06 2Plan Approval11/10/06 11/22/06 3Visit Stanford’s Restaurant11/5/0611/05/06 4First Placement of Light Fixtures 12/01/06 4Design Release12/08/06 5Architectural Model Built02/16/07 9TOP’s Approval02/23/07 7Light Circuitry added to Model 03/16/07 8Prototype Release04/13/07 10Founder’s Day04/17/07 11Final Report04/23/07

9 CS-EE 480 Fall 2006 9September, 2006 University of Portland School of Engineering Concerns/Issues Delay in the delivery of reference books. Preliminary design exceeding the allowed energy usage. Availability of product information for custom fixtures.

10 CS-EE 480 Fall 2006 10September, 2006 University of Portland School of Engineering Conclusions Schedule changed, but on track with new one. Hope to have the preliminary lighting layout done by the end of the semester.


Download ppt "CS-EE 480 Fall 2006 1September, 2006 University of Portland School of Engineering Project Pilot Rock Stanford’s Restaurant and Bar lighting design Team."