ATLAS & D0 D0: Status, software & analysisFrank Filthaut & Silke Duensing ATLAS: Software & analysisStan Bentvelsen Silicon trackerSimon Peeters -spectrometer End-cap toroids MDT chambers Electronics Alignment Detector control Data-acquisition F. Linde, 14-December-2001, Amsterdam
2
End-cap Toroids: Coils HMA power systems Job: wind & impregnate 2 8 coils Status: prototype coil exists Outlook: end-cap # 1: 2004? end-cap # 2: 2005? cost overrun claims }
3
End-cap Toroids: Vessels Schelde Exotech Job: 2 vacuum vessels Status: end-cap # 1 delivered to CERN Outlook: end-cap # 2: summer 2002
4
Drift Tubes
5
MDT Chambers BOL-0BOL-2BOL-3 r.m.s. Z 15 m12 m13 m r.m.s. Y 13 m17 m14 m X-ray tomography r.m.s. wire sag contribution
6
Electronics: Alignment MasterMuxMasterMux USA15MuxUSA15Mux on-chamber off-chamber mask CCD multiplexer Job: 5,000 RASNIK alignment systems + DAQ + software Status: masks, lenses and CCDs distributed DAQ & software prototyped and in use “everywhere” Outlook: complete in 2004 (not critical) lens
7
Electronics: Detector Control T-sensors 30/chamber T 0.2 o C B-sensors B/B 10 -4 CAN NetworkCAN Network digital busses to MDT front-end extra bus (insurance) on-chamber Job: 1,200 CAN based detector control systems + DAQ + software Status: T-sensors delivered; 3D B-sensors prototyped CAN nodes pre-series to be distributed DAQ & software prototyped Outlook: complete in 2003 (not critical)
8
Electronics: Data-Acquisition 1.28 Gbit/s S-Link to ROB 6 x CSM-Link TDC 1 TDC 18 CSM 18 x on MDT chambers MROD (NIKHEF) (256 ) USA15 ROB (256 ) Surface ROD or ROB “IN” ROD or ROB “OUT” CSMCSM TDC 1 TDC 18 CSM 18 x off MDT chambers
9
Cosmic-Ray Test Objectives: system test! Develop: DCS, DAQ C++ software
10
Merry Christmas