Presentation is loading. Please wait.

Presentation is loading. Please wait.

2014 SOUTHEAST REGION FAB MAP FRESH AIR BASE BC x 20 POST.

Similar presentations


Presentation on theme: "2014 SOUTHEAST REGION FAB MAP FRESH AIR BASE BC x 20 POST."— Presentation transcript:

1 2014 SOUTHEAST REGION FAB MAP FRESH AIR BASE BC x 20 POST

2 2014 SOUTHEAST REGION TEAM MAP FRESH AIR BASE BC x 20 POST

3 2014 SOUTHEAST REGION FRESH AIR BASE BC x 20 POST

4 2014 SOUTHEAST REGION FIELD MAP FRESH AIR BASE BC x 20 POST x MINE PHONE D DOOR OPEN DOOR CLOSED D X 36 INCH VENT SHAFT TO SURFACE SHOP EXHAUST FAN OFF 36 INCH VENT TUBING X X B O 2 = 16.5% CO = 1300 ppm POWDER TRUCK LOADED FACE FACE LHD OBSTICLE FIRE O 2 = 16.5% CO = 2000 ppm BC O 2 = 17.1% CO = 250 ppm X GAS TEST STATION O 2 = 17.1% CO = 500 ppm x MINE PHONE BC 10 POST X BC X LUNCH BOX X MUCK PILE IMPASSABLE VINCE DOOLEY ID# 1350 JEREMY PRUITT ID# 1260 MIKE BOBO ID# 1200 “HELP” “HELP” I AM BEHIND BARRICADE IN THE #3 FACE The main fan is down, the motor bearing is hot, estimated repair time 2 hours

5 2014 SOUTHEAST REGION EXPLORATION MAP FRESH AIR BASE BC x 20 POST x MINE PHONE UNSAFE ROOF D DOOR OPEN DOOR CLOSED D X 36 INCH VENT SHAFT TO SURFACE 36 INCH VENT TUBING X X X B O 2 = 16.5% CO = 1300 ppm POWDER TRUCK LOADED FACE FACE LHD OBSTICLE FIRE O 2 = 16.5% CO = 2000 ppm BC O 2 = 17.1% CO = 250 ppm X GAS TEST STATION O 2 = 17.1% CO = 500 ppm x MINE PHONE BC 10 POST X BC X LUNCH BOX X MUCK PILE IMPASSABLE GT DI GT DI GT DI RR BEFORE BUILD AIR LOCK BUILD 2 GT 50’ AP CHECK STOP 1 OR 2 RR DI 1 2 RR DI AIR LOCK BUILD 1 GT RR BEFORE BUILD GT RR DI 3 4 5 7 6 GT DI GT DI GT 8 DI CLOSE DOOR/AIR LOCK 9 GT DI GT DI 10 11A 12 13 GT DI 14 15 GT DI 16 GT 19 18 17 1 2 3 DCBA GT DI GT DI GT&RR AFTER FIRE IS EXTINGUISHED GT DI GT DI GT 2X3 RULKE 11 SHOP EXHAUST FAN OFF RT “HELP” “HELP” I AM BEHIND BARRICADE IN THE #3 FACE The main fan is down, the motor bearing is hot, estimated repair time 2 hours

6 2014 SOUTHEAST REGION VENTILATION MAP A FRESH AIR BASE BC x 20 POST x MINE PHONE UNSAFE ROOF D DOOR OPEN D X 36 INCH VENT SHAFT TO SURFACE 36 INCH VENTTUBING X X X B CLEAR AIR POWDER TRUCK LOADED FACE FACE LHD OBSTICLE FIRE O 2 = 16.5% CO = 2000 ppm BC CLEAR AIR X GAS TEST STATION CLEAR x MINE PHONE BC 10 POST X BC X LUNCH BOX REMOVE BUILD R X MUCK PILE IMPASSABLE R SHOP EXHAUST FAN OFF

7 2014 SOUTHEAST REGION VENTILATION MAP B FRESH AIR BASE BC x 20 POST x MINE PHONE UNSAFE ROOF D DOOR OPEN D X 36 INCH VENT SHAFT TO SURFACE 36 INCH VENTTUBING X X X B CLEAR AIR POWDER TRUCK LOADED FACE FACE LHD OBSTICLE FIRE O 2 = 16.5% CO = 2000 ppm BC CLEAR AIR X GAS TEST STATION CLEAR x MINE PHONE BC 10 POST X BC X LUNCH BOX R X MUCK PILE IMPASSABLE R REMOVE BUILD SHOP EXHAUST FAN OFF

8 2014 SOUTHEAST REGION #1 JUDGE EXPLORATION MAP FRESH AIR BASE BC x 20 POST x MINE PHONE UNSAFE ROOF D DOOR OPEN DOOR CLOSED D X 36 INCH VENT SHAFT TO SURFACE 36 INCH VENT TUBING X X X B O 2 = 16.5% CO = 1300 ppm POWDER TRUCK LOADED FACE FACE LHD OBSTICLE FIRE O 2 = 16.5% CO = 2000 ppm BC O 2 = 17.1% CO = 250 ppm X GAS TEST STATION O 2 = 17.1% CO = 500 ppm x MINE PHONE BC 10 POST X BC X LUNCH BOX X MUCK PILE IMPASSABLE GT DI GT DI GT DI RR BEFORE BUILD AIR LOCK BUILD 2 GT 50’ AP CHECK STOP 1 OR 2 RR DI RR DI AIR LOCK BUILD 1 GT RR BEFORE BUILD GT RR DI GT DI GT DI GT DI CLOSE DOOR/AIR LOCK GT DI GT DI GT DI GT DI GT 1 2 3 DCBA DI GT DI GT&RR AFTER FIRE IS EXTINGUISHED GT DI GT DI GT 2X3 RULKE TEAM # _______ #1 JUDGE NAME _______________ SHOP EXHAUST FAN OFF The main fan is down, the motor bearing is hot, estimated repair time 2 hours “HELP” “HELP” I AM BEHIND BARRICADE IN THE #3 FACE

9 2014 SOUTHEAST REGION #2 JUDGE EXPLORATION MAP FRESH AIR BASE BC x 20 POST x MINE PHONE UNSAFE ROOF D DOOR OPEN DOOR CLOSED D X 36 INCH VENT SHAFT TO SURFACE 36 INCH VENT TUBING X X X B O 2 = 16.5% CO = 1300 ppm POWDER TRUCK LOADED FACE FACE LHD OBSTICLE FIRE O 2 = 16.5% CO = 2000 ppm BC O 2 = 17.1% CO = 250 ppm X GAS TEST STATION O 2 = 17.1% CO = 500 ppm x MINE PHONE BC 10 POST X BC X LUNCH BOX X MUCK PILE IMPASSABLE GT DI GT DI GT DI RR BEFORE BUILD AIR LOCK BUILD 2 GT 50’ AP CHECK STOP 1 OR 2 RR DI RR DI AIR LOCK BUILD 1 GT RR BEFORE BUILD GT RR DI GT DI GT DI GT DI CLOSE DOOR/AIR LOCK GT DI GT DI GT DI GT DI GT 1 2 3 DCBA DI GT DI GT&RR AFTER FIRE IS EXTINGUISHED GT DI GT DI GT 2X3 RULKE TEAM # _______ #2 JUDGE NAME _______________ SHOP EXHAUST FAN OFF The main fan is down, the motor bearing is hot, estimated repair time 2 hours “HELP” “HELP” I AM BEHIND BARRICADE IN THE #3 FACE

10 2014 SOUTHEAST REGION #1 JUDGE VENTILATION MAP FRESH AIR BASE BC x 20 POST x MINE PHONE UNSAFE ROOF D DOOR OPEN DOOR CLOSED D X 36 INCH VENT SHAFT TO SURFACE 36 INCH VENT TUBING X X X B O 2 = 16.5% CO = 1300 ppm POWDER TRUCK LOADED FACE FACE LHD OBSTICLE FIRE O 2 = 16.5% CO = 2000 ppm BC O 2 = 17.1% CO = 250 ppm X GAS TEST STATION O 2 = 17.1% CO = 500 ppm x MINE PHONE BC 10 POST X BC X LUNCH BOX X MUCK PILE IMPASSABLE TEAM # _______ #1 JUDGE NAME _______________ SHOP EXHAUST FAN OFF

11 2014 SOUTHEAST REGION #2 JUDGE VENTILATION MAP FRESH AIR BASE BC x 20 POST x MINE PHONE UNSAFE ROOF D DOOR OPEN DOOR CLOSED D X 36 INCH VENT SHAFT TO SURFACE 36 INCH VENT TUBING X X X B O 2 = 16.5% CO = 1300 ppm POWDER TRUCK LOADED FACE FACE LHD OBSTICLE FIRE O 2 = 16.5% CO = 2000 ppm BC O 2 = 17.1% CO = 250 ppm X GAS TEST STATION O 2 = 17.1% CO = 500 ppm x MINE PHONE BC 10 POST X BC X LUNCH BOX X MUCK PILE IMPASSABLE TEAM # _______ #2 JUDGE NAME _______________ SHOP EXHAUST FAN OFF

12 2014 SOUTHEAST REGION PLACARD MAP FRESH AIR BASE BC x 20 POST x MINE PHONE D DOOR OPEN DOOR CLOSED D X 36 INCH VENT SHAFT TO SURFACE SHOP EXHAUST FAN OFF 36 INCH VENTTUBING X X X B O 2 = 16.5% CO = 1300 ppm POWDER TRUCK LOADED FACE FACE LHD OBSTICLE FIRE O 2 = 16.5% CO = 2000 ppm BC O 2 = 17.1% CO = 250 ppm X GAS TEST STATION O 2 = 17.1% CO = 500 ppm x MINE PHONE BC 10 POST X BC X LUNCH BOX X MUCK PILE IMPASSABLE 1 6/25 4 3 5 26 27 28 29 2 30 32 31 33 34 35 36 37 38 39 40 4241 43 44 46 45 48 47 49 50 51 52 53 54 59/68 58 72 56 70 71 69 73 75 74 77 76 78 81 79 80 82 84 83 87 85 86 88 94 93 55 95 97 96 98 57 90 89 92 91


Download ppt "2014 SOUTHEAST REGION FAB MAP FRESH AIR BASE BC x 20 POST."

Similar presentations


Ads by Google