1 Cleaner Environment CHALLENGES IN DEVELOPMENT OF ERDMP MAHARASHTRA NATURAL GAS LTD, PUNE 28.09.2012 Sagar Varma Senior Manager( Fire & safety)

Similar presentations


Presentation on theme: "1 Cleaner Environment CHALLENGES IN DEVELOPMENT OF ERDMP MAHARASHTRA NATURAL GAS LTD, PUNE 28.09.2012 Sagar Varma Senior Manager( Fire & safety)"— Presentation transcript:

1 1 Cleaner Environment CHALLENGES IN DEVELOPMENT OF ERDMP MAHARASHTRA NATURAL GAS LTD, PUNE 28.09.2012 Sagar Varma Senior Manager( Fire & safety)

2 2 Cleaner Environment  MAHARASHTRA NATURAL GAS LIMITED (MNGL)  A Joint Venture promoted by GAIL (India) Limited; and Bharat Petroleum Corporation Limited MAHARASHTRA NATURAL GAS LTD. To implement City Gas Distribution Project in Pune, Pimpri-Chinchwad (including Hinjewadi, Talegaon & Chakan)

3 3 Cleaner Environment DAHEJ BARUCH HAZIRA NAVSARI VALSAD SILVASA APTI BUDRUK HAJIMALANGWADI DAHANU VASAI BORIVALI TROMBAY GHOTAW`ADE CHINCHWADETHAL DABHOL PUNE VAPI SURAT PANVEL URAN IIL USAR AMBEWADI NASIK SAFALE GAIL ’ S TRANSMISSION PIPELINES 1.DAHEJ – URAN PIPELINE 2.DABHOL – PANVEL PIPELINE 3.GHOTAWADE – CHINCHWAD PIPELINE

4 4 Cleaner Environment DFR prepared by MECON in 2002 MoP&NG allocated 0.4 MMSCMD APM Gas to Pune City in April’2004 Date of Incorporation - 13.01.2006 Date of Commencement of Business - 24.03.2006 Authorised by PNGRB on 15.04.2009

5 5 Cleaner Environment City Gate Station 19 Bar Steel Network 4 Bar PE Network Mother Station Chinchwad DRS GI Installation Service Regulator Domestic Kitchen 100 mbar PE Network 21 mbar CU Network

6 6 Cleaner Environment Customer Base Domestic 4000 customers Vehicles 24000 auto 10000 cars 530 buses Industrial 37 nos. Hotels/Small Commercial 13 commercial

7 7 Cleaner Environment Major Challenge n CGD companies operate as utilities and operate in city conditions. n Our typical response to emergency is based on customer complaints.

8 8 Cleaner Environment Major Challenge n Common regulation for midstream as well as downstream.

9 9 Cleaner Environment Documentation challenge n Old ERDMP reformatted to include all the 30 points of regulation, 9 schedules and 7 checklists. n Supports in the form of annexure included to give sense to the content

10 10 Cleaner Environment Documentation challenge To include n Risk analysis and consequence mapping. n Collection of data from various departments

11 11 Cleaner Environment challenges n Site visit and mockdrills n Three mockdrills conducted in span to 2 hours. n resource constraints. n Offsite department involvement

12 12 Cleaner Environment Other challenges n Perception of TPI delegates n Repeated Micro level changes

13 13 Cleaner Environment contents Other Challenges n Flow of document n Longtime taken for each stage of accreditation  Foreword  Definitions  Executive Summary  11 chapters ( covering each and every schedule)  20 Annexures  7 Checklists

14 14 Cleaner Environment Benefits of the exercise n Involvement lead to knowledge up gradation n Various areas of safety management system come to surface n Comprehensive documentation n Knowledge sharing with other CGD n Tying of loose ends

15 15 Cleaner Environment


Download ppt "1 Cleaner Environment CHALLENGES IN DEVELOPMENT OF ERDMP MAHARASHTRA NATURAL GAS LTD, PUNE 28.09.2012 Sagar Varma Senior Manager( Fire & safety)"