TRANSITION READINESS REVIEW GOTRLA TEAM 15 Aayush Jain, Ankith Nagarle, Anushila Dey, Deepak Earayil, Elaine Lo, Nidhi Baheti, Presha Thakkar, Suhani Vyas.

Similar presentations


Presentation on theme: "TRANSITION READINESS REVIEW GOTRLA TEAM 15 Aayush Jain, Ankith Nagarle, Anushila Dey, Deepak Earayil, Elaine Lo, Nidhi Baheti, Presha Thakkar, Suhani Vyas."— Presentation transcript:

1 TRANSITION READINESS REVIEW GOTRLA TEAM 15 Aayush Jain, Ankith Nagarle, Anushila Dey, Deepak Earayil, Elaine Lo, Nidhi Baheti, Presha Thakkar, Suhani Vyas

2 Operational Concept Review

3 System Purpose Establish a better Attendance Tracking system. Enables better monitoring of the program leading to improved program quality.

4

5 System Boundary Diagram

6 Expected Business Workflow

7 Desired Capability Goals Capability GoalsPriority Goals OC-1 Student management: The system is capable of adding/editing and deleting girl’s data. Must have OC-2 Volunteer management: The system is capable of adding/editing and deleting data of volunteer coaches. Must have OC-3 Class Management: The system is capable of Adding/Editing and Delete classes. Must have OC-4 Attendance Tracking: The system shall provide the methods to check-in the girls and store the attendance data. Must have

8 Organizational Goals OG-1: Improved Attendance Monitoring OG-2: Reduced Paperwork for attendance OG-3: Better tracking of program quality OG-4: Increased support to teams having issues.

9 TRR SPECIFIC OUTLINE Current Project Status – Web application (90% complete) – 1 win condition pending (WC_3425) – Mobile application (90% complete) – 1 win condition pending (WC_3262)

10 Transition Objectives Two Phased transition plan - Beta testing phase and training phase. Post transition support - Will provide support till 12/31/14. Nature of product transition - New System

11 Transition Strategy Beta Testing Phase - 12/01/14 - 12/05/14 – Beta Testing by the client and program staff – The application has been hosted on the live server. – 12/01/14 - 12/05/14 is the beta testing phase.. Training Phase - 12/07/14 - 12/12/14 – Training Program Staff – Refine User Manual

12 PRODUCT DEMO

13 WIN CONDITIONS WC_3425: As a user (Admin, Program staff, volunteer) I can reset/update my account password so that I can login to the system WC_3281: The system shall be easy and intuitive to use WC_3279: The system shall be accessible via a desktop and mobile device WC_3280: The system shall be down for no more then 3 to 5 hours a month and preferably not after school hours. WC_3278: As a staff member I can export (first name, last name, team name (classes), attendance, date (week number)) the data (excel, csv) for each roster from the system so that we can analyze the attendance data

14 WIN CONDITIONS WC_3478: The system shall be easily monitored and maintained WC_3277: As an Admin I can add/Remove/Edit Program staff & should have all the privileges of the program staff so that Security of the system is maintained. WC_3276:As a volunteer I can Login to the mobile application so that I can access the system WC_3275: As a GOTRLA staff member I can Login to the system so that I can access the system WC_3274: As a volunteer I can access the schedule of the program weeks so that I know when to conduct the classes.

15 WIN CONDITIONS WC_3273:As a GOTRLA staff member I can schedule the program weeks so that coaches know when to conduct the classes. WC_3271: As a GOTRLA staff member I can Add/Update and Delete volunteer coaches for each class so that We can monitor attendance of the volunteers and support the team roster when required. WC_3270: As a GOTRLA staff member I can Add/Edit and Delete girls data so that the coaches can take attendance WC_3269: As a GOTRLA staff member I can Add/Edit and Delete classes so that we can Volunteers have up-to-date information WC_3266: Maximum Budget : $750

16 WIN CONDITIONS WC_3265: As a Staff member I can monitor which girls have turned in paper work/payment so that we have their copy liability waiver forms. WC_3264: As a admin, I can identify the which girl's paper work/payment is done so that we have their copy liability waiver forms WC_3263: A s a GOTRLA program staff member, I can regularly and immediately check each site's attendance sheet, so that I can offer support to any teams having issues immediately. WC_3262: As a volunteer coach, I can check in the girls and other coaches on my roster remotely and in real time, so that GOTRLA staff can monitor program quality immediately and efficiently

17 ADDITIONAL FUNCTIONALITIES Search - As a staff member or admin, I can search through the data to see if it contains any of the search value - TC-02- 03, TC-03-03 Sort - As a staff member or admin, I can sort that data alphanumerically - TC-02-03, TC-03-03 Pagination - As a staff member or admin, I can choose how many records to be displayed on each page Import TC- As a staff member or admin, I can import teams or girls data from CSV files to populate the database TC-02- 05, TC-03-05

18 SUPPORT PLAN

19 SUPPORT OBJECTIVE The objective of this support plan is to guide the support of GOTRLA application. To provide good customer satisfaction. The volunteer coaches are able to use the application to check in girls attendance. The admin and program staff is able to manage/monitor the data using the web application. Trouble shoot bugs in the system as quickly as possible.

20 ASSUMPTIONS FOR SUPPORT PLAN The team might provide new releases after TRR – Regarding the client concerns and bug fixes (mostly related to user interface). – Missing points of the system(remaining issues) will be discussed with client and added into Support Plan document. The support will be intermediate. If client/maintainer has any questions about the system we will try our best to answer them via – Telephone – Email The Support plan will be referred by the staff only after undergoing basic training to use the system.

21 SUPPORT PLAN (cont’d) The documents required are given with final deliverables to the client. – Database Schema, GitHub repository, Source code with comments and other resources (system database including sample data)

22 SUPPORT ENVIRONMENT Server Side Requirements: Server : Yahoo Web Hosting Memory: 500 GB Diskspace Data transfer: 5000 GB per month I/O Devices for Maintenance Issues User Side Requirements Internet Connection Web Browser(chrome/safari/firefox) I/O Devices to operate Web Browsers properly.

23 TEST CASES, PROCEDURES AND RESULTS

24 TEST CASES IDTest Case TC-01Website access ― TC-01-01 Check access to web interface TC-02Admin role ― TC-02-01 Check admin login to web interface ― TC-02-02 Check admin accessibility to site and data ― TC-02-03 Admin is able to view/search/sort data ― TC-02-04 Admin is able to add/edit/delete data ― TC-02-05 Admin is able to import data from CSV TC-03Program staff role ― TC-03-01 Check program staff login to web interface ― TC-03-02 Check program staff accessibility to site and data ― TC-03-03 Program staff is able to view/search/sort data ― TC-03-04 Program staff is able to add/edit/delete data ― TC-03-05 Program staff is able to import data from CSV

25 TEST CASES IDTest Case TC-04Volunteer coach role ― TC-04-01 Check access to mobile application ― TC-04-02 Check volunteer coach login to mobile application ― TC-04-03 Check volunteer coach accessibility to application and data ― TC-04-04 Volunteer coach is able to edit attendance TC-05Generate report summary ― TC-05-01 Check report completeness/correctness ― TC-05-02 Check report export TC-06Resetting/Updating password ― TC-06-01 Reset password from web application ― TC-06-02 Reset password from mobile application TC-07Rainy day cases ― TC-07-01 Multiple coaches record attendance ― TC-07-02 Attendance is recorded but then a girl shows up late ― TC-07-03 Error handling

26 TEST PROCEDURE Unit testing Integration testing System testing

27 TEST RESULTS 22 test cases – 3 bugs Bugs found – #591 - Sorting on names is dependent on case – #592 - When sorting on numbers, double digit values get sorted by their first value and then second value – #593 – missing reset password functionality

28 QUALITY FOCAL POINT

29 TECHNICAL DEBT Addition of Import Feature Change in the required format of the input file

30 TRACEABILITY MATRIX Priority Win Condition RequirementsUse CaseTest Case Verification Type 1WC_3269OC-3, CR-2UC-3 TC-03-03, TC-03-04 Testing 2WC_3270OC-1, CR-2UC-3 TC-03-03, TC-03-04 Testing 3WC_3277CR-1UC-2 TC-02-02, TC-02-03, TC-02-04, TC-03-02 Testing 4WC_3271OC-2, CR-2UC-3 TC-03-03, TC-03-04 Testing 5WC_3265OC-1UC-5TC-03-03Testing 6WC_3279PR-1UC-1 TC-01-01, TC-04-01 Testing 7WC_3268CR-3UC-8TC-04-03Testing 8WC_3276PR-1UC-1TC-04-02Testing 9WC_3278OC-4UC-4TC-05-02Testing

31 TRACEABILITY MATRIX Priority Win Condition Requirements Use Case Test Case Verification Type 10WC_3263OC-4UC-6TC-05-01Testing 11WC_3425CR-4UC-7 TC-06-01, TC-06-02 Testing 12WC_3275PR-1UC-1 TC-02- 01, TC-03- 01 Testing 13WC_3281 Demonstration 14WC_3274CR-3UC-8TC-04-03Testing 15WC_3273OC-3, CR-2UC-3TC-03-04Testing 16WC_3266 Analysis 17WC_3280 Analysis 18WC_3262OC-4, CR-3UC-8TC-04-04, TC-07-01, TC-07-02 Testing

32 SUMMARY OF TRANSITION PLAN

33 HARDWARE PREPARATION We are using the Yahoo server to host the web application Hence no hardware preparation is needed at client's site. The mobile application would be hosted on the Apple store and Google play store respectively. The volunteers who are the users of the mobile application need to download the application on their smart phones Thus, there is no need to purchase any additional hardware and no staff time is required for hardware preparation.

34 SOFTWARE PREPARATION The web application can be accessed via a browser. The administrator needs to add other program staff members once the system is completely delivered. The client does not have any legacy software and hence there would be no compatibility issues with the new system.

35 SITE PREPARATION As the staff would be using the system through their current computers. We do not need any special setup to run the system. As long as there is a working internet connection the system is ready to be used. However, it is necessary for the volunteers to download and install the mobile application to record the attendance.

36 STAFF PREPARATION Our client might require to hire a maintainer(developer) in the future. We will create a new developer guide which would help any new developer understand how the system works and how to make changes to it if necessary.

37 Operational Testing Testing Cycle – User Acceptance Testing – Client Feedback - Issues Reported – Fix issues – Deploy Alpha Testing - Ongoing Beta Testing - Pending

38 Operational Training 11/20/14 - The client was familiarized with the basic functions of the web application. 12/01/14 - The client and program staff will be given a review of the application. 12/01/14 - The client will be provided with credentials to use the application. 12/01/14 - The client will be provided with User Manual and Training Plan 12/08/14 - 12/12/14 - Training provided to the staff using the user manual.

39 Operational Evaluation Client Feedback on product satisfaction Win conditions satisfied - WC_3281, WC_3478, WC_3280, WC_3278, WC_3277, WC_3276, WC_3275, WC_3274, WC_3273, Pending Win conditions - WC_3425, WC_3262

40 STAKEHOLDER ROLES AND RESPONSIBILITIES DateRoleResponsibilityLocation 11/26/14ClientPurchase a domain to host web applicationClient's site 11/30/14Team-15Host the application on the serverTeam Location 12/01/14Team-15TRR PresentationUSC 12/05/14Team-15To perform testing before final delivery/transition Team Location 12/09/14GOTRLA staff and Team-15 Provide training to all the staff members of the client and to the volunteers Client's site 12/09/14Team-15Collect User feedback and measure of success Client's site 12/09/14VolunteersDownload the GOTRLA mobile application Client's site 12/15/14Team-15Hand-over the complete system to the client Client's site 12/31/14Team-15Provide Technical support to the clientClient's site

41 MILESTONE PLAN Transition Period : 11/26/14 – 12/31/14 Necessary Tasks – Finish documents – Finish testing the system – Finish up final feature additions – Train client – Hand over system/ deploy system to client

42 SOFTWARE PRODUCT ELEMENTS – User Manual – Training Plan – Transition Plan – Test Plan and Cases – Prototype Presentation – System and Software Architecture Description – Feasibility Evidence Description – Operational Concept Description – Life Cycle Plan

43 REQUIRED RESOURCES Hardware Software Initial data to provide product demo Training Material Stakeholders

44 FEEDBACK

45 THANK YOU