Download presentation
Presentation is loading. Please wait.
Published byBriana Wilkerson Modified over 8 years ago
2
Cbt / Communication Engineering Closing / Cierre / Amaiera OCTOBER 18-19-20, 2006 Bilbao / Spain SEE YOU NEXT YEAR OCTOBER x-x, 2007 Bilbao / Spain
3
Cbt / Communication Engineering Venue
4
Cbt / Communication Engineering It received the Apex Award for Best Convention Centre of the World 2003 The Conference Centre and Concert Hall. Euskalduna Jauregia. Bilbao / Spain
5
Cbt / Communication Engineering One of the most outstanding contemporary works carried out by Spanish architects Euskalduna Jauregia Bilbao
6
Cbt / Communication Engineering Opening
7
Cbt / Communication Engineering “xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx” Opening 18th – Jesús M. de la Maza– Innovalia (ES)
8
Cbt / Communication Engineering Tutorials
9
Cbt / Communication Engineering To improve things, modify the process Tutorial 1 18th – Agile Software Inspections Lawrence E. Day – Boeing Company (USA)
10
Cbt / Communication Engineering Modelling and simulation techniques offer a more secure and reliable testing Tutorial 2 18th – On the Application of a Model-Driven Technique for Development and Testing of Embedded Systems Gabriel A. Wainer – CARLETON UNIVERSITY (CA)
11
Cbt / Communication Engineering Keynotes
12
Cbt / Communication Engineering ITIL describes the process to manage IT services efficently and effectively Keynote 18th – ITIL Valentín Galán – (ES)
13
Cbt / Communication Engineering Defects decrease your company’s motivation. Tests also have to be tested. Keynote 19th – How to expand and improve your Test Capabilities Ray Arell – INTEL (USA)
14
Cbt / Communication Engineering Best wishes. We’ll see you next year in Bilbao Keynote 20th – Virtually Defect-Free Software in Less Time Michael Fagan – MICHAEL FAGAN ASSOCIATES (USA)
15
Cbt / Communication Engineering Tracks
16
Cbt / Communication Engineering Don’t start improving requirements management Without also improving requirements engineering. Track A Requirements Management 18th – (1) Managing Requirements in Real Life Willem van den Biggelaar – PROCESS VISION (NE)
17
Cbt / Communication Engineering Extreme programming practices can easily be combined with use-cases outlines to provide a lightweight, agile process Track A Requirements Management 18th – (2) Agile Requirements Management with Use Cases Ian Spence – IVAR JACOBSON CONSULTING LTD. (UK)
18
Cbt / Communication Engineering Examination of test coverage made “Excellence Testing” the most effective. Track B Testing Techniques and Processes 18th – (1) Comparing all Pairs Testing Techniques Paul Jorgensen – GRAND VALLEY STATE UNIVERSITY (USA)
19
Cbt / Communication Engineering Evolutionary testing supports fully automatic testing for various testing objectives. Track B Testing Techniques and Processes 18th – (2) Evolutionary Testing od Embedded Systems Joachim Wegener – DAIMLERCHRYSLER AG (GE)
20
Cbt / Communication Engineering The cost of the QA activities is about a 60% of the total cost of the development Track C QA Management for Embedded Systems 19th – (1) Measuring and Optimizing Systems Quality Costs and Project Duration Dr. Avner Engel – ISRAEL AIRCRAFT INDUSTRIES (IL)
21
Cbt / Communication Engineering SEE improve software reliability without formal methods or full testing Track C QA Management for Embedded Systems 19th – (2) SEE: a Methodology of Software Development for Testing Electronic Systems Santiago Tapia – UPM (ES)
22
Cbt / Communication Engineering If the information is correctly registered, you can predict the behaviour of components in the future. Track C QA Management for Embedded Systems 19th – (3) Measuring and Analyzing the Performance of Reusable Software Components for Embedded Systems Ronny Kolb – FRAUNHOFER-IESE (GE)
23
Cbt / Communication Engineering Meassuring the process is very important to have a starting point and to improve it. Track C QA Management for Embedded Systems 19th – (4) Continuous Quality Improvement Javier Fernández-Pello – NTE (ES)
24
Cbt / Communication Engineering ”xXXXXXXXXXXXXXXXX” Track C QA Management for Embedded Systems 19th – (5) Quantitatively Driving Process Improvement to Develop Embedded Systems using Bayesian Networks Elena Pérez-Miñana – MOTOROLA (UK)
25
Cbt / Communication Engineering ”XXXXXXXXXXXXXXXXxxxxxxxxxxx” Track D Test Automation 19th – (1) Using Automation to Test Internet-Based Applications on Embedded Devices Scott Barber – PERFTESTPLUS (USA)
26
Cbt / Communication Engineering ”xXXXXXXXXXXXXX” Track D Test Automation 19th – (2) Test Automation in Space Projects Stefan Mohacsi – SIEMENS (AU)
27
Cbt / Communication Engineering ”XXXXXXXXXXXXXXXxxxxxxxxxxxxxxx” Track D Test Automation 19th – (3) Test Case Design for automation: are your Test Cases Ready? Shrinivas Kulkarni – IGATE GLOBAL SOLUTIONS (IN)
28
Cbt / Communication Engineering ”XXXXXXXXXXXXXXXxxxxxxxxxxxxxxx” Track D Test Automation 19th – (4) Adventures with Test Monkeyss John A. Fodeh – DEN (IN)
29
Cbt / Communication Engineering ”XXXXXXXXXXXXXXXxxxxxxxxxxxxxxx” Track D Test Automation 19th – (5) Framwork for Centralized Automation, Management and Execution of Tests Sivakumar R. Mallya – HP (IN)
30
Cbt / Communication Engineering ”XXXXXXXXXXXXXXXxxxxxxxxxxxxxxx” Track E Testing Real Time Embedded Systems 20th – (1) Importance of Performing Stress Testing on Embedded Software Applications Adrian Hill – JOHNS HOPKINS UNIVERSITY (USA)
31
Cbt / Communication Engineering ”XXXXXXXXXXXXXXXxxxxxxxxxxxxxxx” Track E Testing Real Time Embedded Systems 20th – (2) Fault Detection Procedures for Embedded SW Systems Lorenzo Lupini – ERICSSON (IT)
32
Cbt / Communication Engineering ”XXXXXXXXXXXXXXXxxxxxxxxxxxxxxx” Track E Testing Real Time Embedded Systems 20th – (3) Optimizing the Embedded Development Cycle Jeff Womble – MENTOR GRAPHICS (USA)
33
Cbt / Communication Engineering ”XXXXXXXXXXXXXXXxxxxxxxxxxxxxxx” Track F Certification Strategies 20th – (1) Groupware & CSCW Requirements Specification for Acceptance Testing Hans-Ludwig Hausen – FRAUNHOFER (GE)
34
Cbt / Communication Engineering ”XXXXXXXXXXXXXXXxxxxxxxxxxxxxxx” Track F Certification Strategies 20th – (2) How Useful are Safety Standards? Odd Norland – SINTEF ICT (NO)
35
Cbt / Communication Engineering ”XXXXXXXXXXXXXXXxxxxxxxxxxxxxxx” Track F Certification Strategies 20th – (3) Quality Measures for Embedded Systems for Control and Certification Kurt Rohloff – BBN TECHNOLOGIES (USA)
36
Cbt / Communication Engineering Round table
37
Cbt / Communication Engineering Current situation and future challenges in the Software Testing Industry Round Table – Moderator: xxxx (xx)
38
Cbt / Communication Engineering Best Paper
39
Cbt / Communication Engineering Best Paper QA&TEST 06 – XXXXXXXXXXXX (XX)
40
Cbt / Communication Engineering Events
41
Cbt / Communication Engineering Barceló Avenida – Testing cooks! Speakers Warming UP – 17th October 2006
42
Cbt / Communication Engineering The Previous Cocktail – People Chating Conference Dinner at NH Villa de Bilbao – 19th October 2006
43
Cbt / Communication Engineering The Dinner Conference Dinner at NH Villa de Bilbao – 19th October 2006
44
Cbt / Communication Engineering Chairmen
45
Cbt / Communication Engineering Thanks! QA&TEST 06 Chairmen
46
Cbt / Communication Engineering Exhibition
47
Cbt / Communication Engineering SOGETI, SQS, ASOCIACIÓN INNOVALIA QA&TEST 06 Exhibitors
48
Cbt / Communication Engineering Thank you for coming / Gracias por venir / Eskerrik asko etortzeagatik SEE YOU NEXT YEAR OCTOBER x-x, 2007 Bilbao / Spain
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.