Presentation is loading. Please wait.

Presentation is loading. Please wait.

Pacific Aviation Directors Workshop March 13 – 15, 2012 Hosted by: A B Won Pat International Airport - Guam F ederal A viation A dministration DEPARTMENT.

Similar presentations


Presentation on theme: "Pacific Aviation Directors Workshop March 13 – 15, 2012 Hosted by: A B Won Pat International Airport - Guam F ederal A viation A dministration DEPARTMENT."— Presentation transcript:

1 Pacific Aviation Directors Workshop March 13 – 15, 2012 Hosted by: A B Won Pat International Airport - Guam F ederal A viation A dministration DEPARTMENT OF PUBLIC WORKS & TRANSPORTATION YAP INTERNATIONAL AIRPORT PRESENTATION

2 Introduction 1. Completed Projects within the Last five (5) years 2. UPCOMING PROJECT 4. PROPOSED PROJECT 3.ONGOING PROJECT

3 Runway Shoulders, Turnaround and Seal Coating (June 2009 – November 2011)

4 FRONT VIEW OF THE BLDG. FACING RUNWAY. Y.I.A. Aircraft Rescue and Firefighting Facility Project (April 2008 – February 2010 TURN-OVER CELEBRATION SOUTHWEST SIDE OF THE BLDG. SOUTHEAST SIDE OF THE BLDG.

5 APRON WEST SIDE Apron Reconstruction Project (February 2008 – December 2009 APRON EAST SIDE APRON WEST SIDE APRON EAST SIDE

6 Rehabilitation, Installation of Perimeter Fencing and Upgrading of lightings and signs (January 2006 – September 2007)

7 FRONT VIEW OF THE BUILDING FACING VEHICLE PARKING AREA (SOUTHSIDE). NEW DEPARTURE LOUNGE. Y.I.A Terminal Facility Rehabilitation (July 2006 – September 2007).

8 Departure Lounge Remodeling Departure Lounge Remodeling New Hanger New Hanger UPCOMING PROJECTS

9 Ongoing Projects AIRPORT MASTER PLAN

10 Yap Neighboring Island Airport Projects Proposed Projects a.Ulithi Airport b.Fais Airport c.Woleai Airport d.Parking Lot Solar Panel Installation e.ARFF Building Solar Panel Installation

11 1)PERIMETER FENCING AROUND THE RUNWAY. 2)2 (TWO) WIND CONES. 3)RUNWAY LIGHTINGS. 4)REHABILITATION OF DAMAGED ITEMS AT THE TERMINAL. 5)STRIPING ALONG THE RUNWAY. ULITHI AIRPORT

12 1)PERIMETER FENCING AROUND THE RUNWAY. 2)2 (TWO) WIND CONES. 3)PAVEMENT RESURFACING. 4)RUNWAY LIGHTINGS. 5)CONSTRUCT NEW AIRPORT TERMINAL. FAIS AIRPORT

13 1)PERIMETER FENCING AROUND THE RUNWAY. 2)2 (TWO) AIRFIELD WIND CONES. 3)PAVEMENT RESURFACING. 4)RUNWAY LIGHTINGS. 5)CONSTRUCT NEW AIRPORT TERMINAL. WOLEAI AIRPORT

14 END OF PRESENTATION “THANK YOU” “KAMMAGAR MAGAR”


Download ppt "Pacific Aviation Directors Workshop March 13 – 15, 2012 Hosted by: A B Won Pat International Airport - Guam F ederal A viation A dministration DEPARTMENT."

Similar presentations


Ads by Google