Presentation is loading. Please wait.

Presentation is loading. Please wait.

7 May 2015 Introduction to bus rapid transit. What is BRT? Enclosed and secure stations New, clean, high- capacity buses Pre-board payment with smart.

Similar presentations


Presentation on theme: "7 May 2015 Introduction to bus rapid transit. What is BRT? Enclosed and secure stations New, clean, high- capacity buses Pre-board payment with smart."— Presentation transcript:

1 7 May 2015 Introduction to bus rapid transit

2 What is BRT? Enclosed and secure stations New, clean, high- capacity buses Pre-board payment with smart cards Pedestrian and cycle access Dedicated bus lanes Rapid boarding

3 Dedicated right-of-way 1 BRT BASICS:

4 Dedicated BRT lanes are critical to system speed & capacity

5 There is no such thing as “partially segregated BRT.”

6 Metroplus, Medellin

7 Mexico City: Metrobus Line 4

8

9 No space for dedicated BRT lanes?

10 Busway alignment 2 BRT BASICS:

11 Median lanes >Reduce conflict with property entrances, parking, turning vehicles >Reduce conflict with pedestrians, cyclists >Increase driver stress and productivity

12 Why curb-side alignment doesn’t work >Parked vehicles block the bus lane

13 Why curb-side alignment doesn’t work (cont.) >Turning movements reuce bus speeds

14 Platform-level boarding 3 BRT BASICS:

15 Janmarg, Ahmedabad

16 Buses should not have inside steps.

17 Off-board fare collection 4 BRT BASICS:

18 Why off-board? Convenience for passengers Fewer delays Reduced revenue leakage Automated ridership data for service optimisation

19 Intersection treatments 5 BRT BASICS:

20 Avoiding turns across BRT lanes … three right turns … right turn + U-turn … right turn + two left turns Replace left turns with …

21 Dar photo

22 Two-phase squareabouts reduce intersection delay by combining straight and turning movements

23 Squareabout signal phasing Phase 1Phase 2

24 Two-phase signal cycle in Giza (at Cairo University bridge)

25 Summary: the BRT Basics Dedicated right-of-way Busway alignment Off-board fare collection Intersection treatments Platform-level boarding

26 The BRT Standard

27 BRT Standard 1BRT Basics38 2Service planning19 3Infrastructure14 4Stations10 5Communications5 6Access and Integration14 7Point deductions- 45

28 BRT Standard 1BRT Basics38 2Service planning19 3Infrastructure14 4Stations10 5Communications5 6Access and Integration14 7Point deductions- 45

29 Multiple routes One service per corridorMultiple services per corridor

30 BRT Standard 1BRT Basics38 2Service planning19 3Infrastructure14 4Stations10 5Communications5 6Access and Integration14 7Point deductions- 45

31 Centre stations Side platforms Central stations: >Reduced construction and operational costs >Better bus docking >Easier transfers

32 BRT Standard 1BRT Basics38 2Service planning19 3Infrastructure14 4Stations10 5Communications5 6Access and Integration14 7Point deductions- 45

33 Safe and comfortable stations

34 Transcarioca, Rio de Janeiro

35 BRT Standard 1BRT Basics38 2Service planning19 3Infrastructure14 4Stations10 5Communications5 6Access and Integration14 7Point deductions- 45

36 Branding

37 Strengthening the system identity Original name & logo Unique station design Coordinated signage & passenger information

38 BRT Standard 1BRT Basics38 2Service planning19 3Infrastructure14 4Stations10 5Communications5 6Access and Integration14 7Point deductions- 45

39 Universal access Access ramps (1:12 gradient) Accessible fare collection area

40

41 At-grade station access is preferred Foot overbridges: >Increased walking distance/time >Unsafe >Inaccessible

42 Ensure that station access points are accessible

43 Integration with metro

44 BRT Standard 1BRT Basics38 2Service planning19 3Infrastructure14 4Stations10 5Communications5 6Access and Integration14 7Point deductions- 45

45 Lack of enforcement

46 BRT Standard 1BRT Basics38 2Service planning19 3Infrastructure14 4Stations10 5Communications5 6Access and Integration14 7Point deductions- 45

47 www.itdp.org @ITDPAfrica More information: brtstandard.org


Download ppt "7 May 2015 Introduction to bus rapid transit. What is BRT? Enclosed and secure stations New, clean, high- capacity buses Pre-board payment with smart."

Similar presentations


Ads by Google