Presentation is loading. Please wait.

Presentation is loading. Please wait.

LOGO “ Add your company slogan ” Software Measurement & Analysis Team Assignment 2.

Similar presentations


Presentation on theme: "LOGO “ Add your company slogan ” Software Measurement & Analysis Team Assignment 2."— Presentation transcript:

1 LOGO “ Add your company slogan ” Software Measurement & Analysis Team Assignment 2

2 Software Measurement & Analysis Contents Team goals 1 Team Rules 2 Team roles and responsibility 3 Team Schedule 4

3 www.themegallery.com Team Goals IDType of goalGoal 1Learning Get real knowledge after finishing this course, apply knowledge from lectures in team assignments 2Learning From shared knowledge and experience of teammates 3Learning Having soft-skills that are required: Presentation skills, teamwork skills, conflict resolution skills, negotiation skills 4QualityBe a cooperative and effective team 5Quality Plan and track all personal work of each team member 6QualityComplete all team assignments 7TransparencyTransparency in decision making, estimation, and status update

4 Team Rules Rules for working 1.Participate in all team meetings follow plan. 2.Do not come in lately in the team meeting (threshold: 30 minutes) 3.Each team member follows assigned roles, complete teamwork on time. 4.Complete all assigned tasks to SVN in time. 5.Do not passive in team meetings 6.Do not take individual work during discussing. 7.Received feedbacks for artifacts (from QA- if they have any mistakes), fix them until all mistakes are removed. 8.Submit Effort Log every Thursday before 11h00 PM. 9.Do not share any artifacts with other teams 10.Check file name when submitting to SVN

5 Team Rules Operation Methods 1.All materials of team must manage on SVN 2.Check mail and update SVN daily 3.Each team assignment should have a change log on Google docs 4.Record meeting minutes for each meeting. 5.Each team member has a task list weekly on Google docs 6.All team assignments must be completed in English 7.Viewing plan each the earliest week to track meeting schedule and task list in week.

6 Team Roles and Responsibility NameRoleRotation An HaLeader15 weeks Tho NguyenDesigner15 weeks Hoang TranResearch and Development15 weeks Duc NguyenQuality Manager15 weeks Quyen ThoiReporter15 weeks Tuan LaiSupport Manager15 weeks

7 Team Roles and Responsibility 1.Update effort log daily 2.Produce quality work 3.Communicate effectively and respect other team members 4.Contributes to the quality of each team assignment with ideas and effort.

8 Team Roles and Responsibility Team Leader 1.Motivate team members 2.Run weekly team meeting 3.Help team to allocate tasks 4.Produce a complete, precise, and accurate plan for the team and every team member 5.Moderator and control the meeting in order to make sure the high performance meeting. 6.Examine the assignment requirements, and make the high-level plan for preparation step 7.Collect all baseline artifacts submit on Moodle and contact with Director

9 Team Roles and Responsibility 1.Lead team in determining its support needs and obtaining tool/facilities 2.Manage all changes during implementing team assignments. If change occurs, notice to other team members Support manager

10 Team Roles and Responsibility 8.Help the team run a plan well and tracked deliverable 9.Keep the instructor fully informed about the team’s progress (status report) 10.Accurately report team status every week to team 11.Resolve all issues that reported by team members Team Leader

11 Team Roles and Responsibility 1.Make Agenda logically 2.Create template, design, format, edit, and add effect in presentation slides. 3.All the team’s action items, risks and issues are recorded in the issue-tracking system and reported each week Designer

12 Team Roles and Responsibility 1.Lead the team in producing and tracking the quality plan. 2.Check out and examine task’s members (refactoring, fix mistakes…) and commit them back to SVN and baseline. 3.Check the Agenda to make sure it covered all contents and the PowerPoint Template is good. 4.Alert the team, the team leader, and the instructor to quality problems 5.Summarize effort log weekly Quality Manager

13 Team Roles and Responsibility 6.Review and approve all products before submission Manage and examine document’s members. 7.Lead the team in defining and documenting its processes and in maintaining the process improvement process 8.Summarize effort log weekly Quality Manager

14 Team Roles and Responsibility 1.Analyzing every aspects of the problem 2.Find and suggest ideas to help team solve problems 3.Researching information and answer the difficult questions that discuss in the meeting. Lead the team in defining and documenting its processes and in maintaining the process improvement process Research and Development

15 Team Roles and Responsibility 1.Record meeting minutes for all team meeting 2.Tracking progress that complete task of each team member 3.Summarize artifacts that need to submit for each team assignment 4.Search and find information to solve problems Reporter

16 Team Roles and Responsibility NameResponsibility An Ha Specializes in measuring Quality in Viking Project Tho Nguyen Hoang Tran Specializes in measuring Cost in Viking Project Duc Nguyen Quyen Thoi Specializes in measuring Schedule in Viking Project Tuan Lai

17 Team Schedule

18 LOGO “ Add your company slogan ”


Download ppt "LOGO “ Add your company slogan ” Software Measurement & Analysis Team Assignment 2."

Similar presentations


Ads by Google