Presentation is loading. Please wait.

Presentation is loading. Please wait.

Development of Project on BOT (Annuity) Model

Similar presentations


Presentation on theme: "Development of Project on BOT (Annuity) Model"— Presentation transcript:

1 Development of Project on BOT (Annuity) Model
RAJASTHAN STATE ROAD DEVELOPMENT CONSTRUCTION & CORPORATION LTD. JAIPUR MANGALWAR – NIMBAHERA (MDR-11A) Development of Project on BOT (Annuity) Model

2 PROJECT LOCATION

3 PROJECT LOCATION

4 NECESSITY Better access to Stones mines of the area to rest of State.
Better roads for transportation of materials to & from Cement plants i.e. J.K.Cement-Nimbahera, Birla Cement, Vikram Cement, etc. established in the region providing better opportunity for their expansion. Comfortable present connectivity between Mangalwar and Nimbahera via Nikumbh which is the shortest route to connect Kandla Port to Central India (M.P.) like Indore and Ratlam, Bhopal etc. Road, if improved shall form life line of Badi Sadri & Nimbahera Assembly Constituency which is spread from Mangalwar to Nimbahera. Improved Business activities shall further the cause of economic and social advancement of the area. Shall provide a link from NH 79 to NH 76.

5 NECESSITY Mangalwar & Nimbahera are the Busy towns and they need faster & effective connectivity by Road. Commercial traffic is available due to Cement Production & other Industrial activities Number of Sharp Horizontal & Vertical Curves has be redesigned as per Guidelines of IRC. Widening & Strengthening of Carriageway from 1.5 Lane to 2 Lane with Hard Shoulder is required. This road is existing Toll Road and the concession period is ending by March The Concessionaire is RSRDCC.

6 Project Proposal 2 Lane Carriageway with Hard Shoulder is Proposed.
Chikdra & Minana Bye Pass is proposed of approx km. Widening of Culverts to 12.0m ROW. All Horizontal & Vertical Curves shall be designed as per designated speed with all the requirements of Highway Design and make them correct. Paved Shoulder after 14 years.

7 Bye Pass at chikadra required

8 Bye Pass at MInana required

9 MANGALWAR JUNCTION

10 Nimbahera Town

11 EXISTING SCENARIO (DETAILS OF CARRIAGEWAY)
Road Section Length (Km) Existing carriageway (m) Remarks MANGALWAR - NIMBAHERA (MDR-11A) (Km 0 - Km 40) 40.00 5.5 M Carriageway with Hard Shoulder (No renewal proposed in Existing BOT) TOTAL Km

12 EXISTING SCENARIO (DETAILS OF HABITATIONS)
ROAD SECTION VILLAGES / TOWNS Mangalwar – Nimbahera (MDR-11A) (Km 0 - Km 40) Mangalwar (Km 1/000) Chikarda (Km 12/000) Napawali (Km 17/000) Nikumbh (Km 20/000) Minana (Km 22/000) Dooriya (Km 29/000) Dinwa (Km 34/000) Nimbahera (Km 40/000) No Level Crossing is on the route.

13 PROPOSAL FOR ROAD IMPROVEMENT
ROAD SECTION TRAFFIC PROPOSAL Mangalwar – Nimbahera (MDR – 11A) (Km 0/000 - Km 40/000) 4064 PCU 766 CVD Trengthening & Widening of C/W with Hard Shoulder. Bye Pass of Chikadra & Minana Proposed.

14 PROPOSED ROAD CROSS SECTIONS

15 PROPOSED ROAD CROSS SECTIONS

16 STRIP PLAN

17 estimates

18 ABSTRACT OF COST OF DEVELOPMENT
(WITHOUT PAVED SHOULDER) S. No. Particulars Estimated Cost (Rs. In Crores) 1. Improvement of Existing Road 21.49 2. CD Works (including new Culverts ) 1.54 3. ROB 0.00 4. CC Road 0.68 5. Bye Passes 6.97 6. Road Furniture 1.19 7. Road Work for Toll Plaza 4.36 8. Toll Plaza 0.57 9. Lay bye’s 10. Public Utility Services 0.46 11. Landscaping & Tree Plantation 0.50 Total Cost 33.68

19 ABSTRACT OF COST OF DEVELOPMENT Estimated Cost (Rs. In Crores)
S. No. Particulars Estimated Cost (Rs. In Crores) Base Cost 122.89 13. Add: 10% Escalation for 2 year 0.00 14. Tender 10% 3.36 15. Cost of contingencies 5% 1.68 16. Quality Control (1%) 0.34 17. Guarantee Commission to State Govt. (1%) 18. Cost of Land Acquisition 0.94 Sub Total 40.34 19. A & F Charges (10%) 4.03 20. Application Fee and Front end fee (0.5%) 0.20 44.57 21. Interest during construction 1.78 Grand Total 46.35

20 ABSTRACT OF COST OF MAJOR MAINTENANCE
S. No. Particulars Treatment Estimated Cost (Rs. In Crores) in respective year Major Maintenance without Paved Shoulders 1. Renewal Cost 7h Year 40mm BC 10.48 2. Strengthening Cost 14th Year 50 DBM + 40mm BC (Paved Shoulder at 14th Year)

21 FINANCIAL ANALYSIS

22 Traffic Scenario (7 Days CVC 21/05/10 to 28/05/10)
Census Point PCU Tractor Trolly Car /Jeep Cat. 1(b) Buses Cat. 2 Trucks <5 T Cat. 3(a) Trucks >5 T Cat. 3(b) Multi Axle Cat. 4 Mangalwar – Nimbahera 4649 98 884 95 336 103 232

23 %age of Tollable Traffic
Tractor Trolley (Commercial Use) Cat. 1(a) Car /Jeep Cat. 1(b) Buses Cat. 2 Trucks <5 T Cat. 3(a) Trucks >5 T Cat. 3(b) Multi Axle Cat. 4 0% 50% 70% Assumed traffic growth per year 5%

24 Tollable Routes Road Section Length (Km) Mangalwar - Nimbahera 38.50

25 Tractor Trolly (Commercial Use) Cat. 1(a)
Tollable Traffic Road Section Tractor Trolly (Commercial Use) Cat. 1(a) Car /Jeep Cat. 1(b) Buses Cat. 2 Trucks <5 T Cat. 3(a) Trucks >5 T Cat. 3(b) Multi Axle Cat. 4 Mangalwar - Nimbahera (73.90 km) 467 59 208 64 143

26 TOLL PLAZA LOCATIONS LOCATION TOLLABLE LENGTH (KM) RAOD SECTION
38.50 Nimbahera At Km 29/400 Dooria

27 Summary of proposal Construction Period – 1 Years 0 Months
Repayment Period – 19 Years 0 Months Concession Period – 20 Year 0 Months Annuity Model with Toll Annuity – 4.50 Crores

28 SUMMARY OF PROJECT S. No. Particulars Detail 1 Length of road 40.0 Km
2 Design Life 20 Years 3 Project Cost Rs Crores 4 Construction Period 1 Years 0 months 5 Tollable Period 19 Years 0 months 6 Concession Period 20 Years 0 months 7 Rate of Interest 11.75% 8 Toll Plaza 2 Nos.

29 Without Paved Shoulder initial and Paved Shoulder at 14th Year
Models of PPP Annuity with toll S. No. Description Initial Cost (Cr.) Annuity (Cr) Viability 1. Without Paved Shoulder initial and Paved Shoulder at 14th Year 46.35 Viable

30 RECOMMENDATION Annuity Model with Toll Collection shall be adopted.
Toll Shall not be charged by Car & Public Transport. Only Commercial Vehicles like LCV’s , Trucks shall be charged. Initially 2 Lane road without paved shoulder. 2 Lane with Paved Shoulder shall be after 14 Years. Construction Period – 1 Years 0 Months Repayment Period – 19 Years 0 Months Concession Period – 20 Year 0 Months

31 THANKS 43

32

33

34 Models of PPP BOT 30% VGF (20% Central + 10% - O&M - State Govt.)
S. No. Description Initial Cost (Cr.) Major Maintenance Viability 1. Without Paved Shoulder initial and Paved Shoulder at 12th Year 46.35 32.07 – 7th – 14th Non Viable 2. With Paved Shoulder initially 211.87 45.31 – 7th – 14th 30% VGF (20% Central + 10% - O&M - State Govt.) S. N. Description Initial Cost (Cr.) IRR in Years DSCR Viability 1. Without Paved Shoulder initial and Paved Shoulder at 14th Year 174.80 < 2.0 0.21 Non Viable 2. With Paved Shoulder initially 211.87 < 1.0 0.09

35 Tollable Traffic - Comparison
Road Section Tractor Trolly (Commercial Use) Cat. 1(a) Car /Jeep Cat. 1(b) Buses Cat. 2 Trucks <5 T Cat. 3(a) Trucks >5 T Cat. 3(b) Multi Axle Cat. 4 Phalodi – Osian (73.90 km) 348 48 139 96 21 Osian - Jodhpur (46.0 Km) 585 116 238 87 25

36 DETAILS OF PROPOSED WORK & DEFECT LIABILITY PERIOD
S. No. Stretch Year & Description 1 Km 57/0 to Km 91/0 2014 (Widening) 2 Km 69/0 to Km 70/0 3 Km 81/0 to Km 89/0 CRF Tender Due 4 Km 63/0 to Km 74/0 5 Km 118/0 to Km 122/0 Proposal for Jodhpur Bye – Pass


Download ppt "Development of Project on BOT (Annuity) Model"

Similar presentations


Ads by Google