1 Six Sigma at Academic Medical Hospital
The following presentation was developed by Jane McCrea, Black Belt of the ED Wait Time Project at Academic Medical Hospital. The presentation follows the DMAIC methodology.

2 Six Sigma--DMAIC Define: Define and scope problem. Identify potential benefits and critical to quality (“CTQ”) factors. Measure: Identify the key internal process that influences CTQ characteristics and measure the defects generated relative to the identified CTQs. Confirm measurement system reliability. Know voice of customer. End result: team can successfully measure the defects generated for a key process affecting the CTQ. Analyze: Identify root causes of defects. Use statistical data tools to identify key process inputs that affect process outputs. End result: explain variables that are likely to drive process variation the most. Improve: Determine and confirm optimal solution (statistically re-analysis). Identify the maximum acceptable ranges of key variables. End result: modify the process to stay within the acceptable ranges. Control: Ensure that modified process now enables the key variables to stay within the maximum acceptable ranges using tools such as metric dashboards and accountability reporting.

3 ED Wait Time Define Project Description
six sigma The Way We Work Champion Dr. Gerry Elbridge Sponsor Dr. Terry Hamilton Black Belt Jane McCrea Green Belt Dr. James Wilson Foundations Team Nancy Jenkins, Bill Barber, Georgia Williams, Steve Small Project Description Reduce and consistently maintain patient wait times from triage start to first physician interaction at established thresholds. EXPECTED BENEFITS Customer: Critical to Quality (CTQ) Reduce Wait Time Internal: Critical to Quality (CTQ) Improve Patient/Staff Satisfaction Enhance Patient Outcomes Increase ED capacity and operational efficiency Arrival Triage Register Lobby Tx Room Nurse MD

4 What was the Voice of the Customer?
Measure What was the Voice of the Customer? Patient Survey N = 30; Priority II Patients Random: all days, all shifts Patient Survey Results Wait Time Expectations: 10-20 minutes: 43% 20-30 minutes: 23% Patient Survey Results Wait Time Satisfaction Very Satisfied: 37% Very Dissatisfied: 37%

5 Baseline Measurements
An observational prospective manual time study yielded baseline measurements for the total wait time Triage Start to MD Start Mean: 62.5 min. Std. Dev: 39.66 Z-Score: 1.79 Defect Rate: 38.6% USL: 37.1 min. The Upper Specification of 37.1 is shown as a yellow vertical line.The z Score is the number of Sigma above mean.The rectangle at the bottom of the graph is the 95% Confidence Level for mean

6 Key Takeaway: 40% Wait Reduction & Operating Margin Gains
Measure What did we measure? Y: # of Minutes, from Triage Start to First Physician Interaction Specification Limit: 37 minutes Specification Validation: Internal experts & data, External benchmarks Defect: Wait time > 37 minutes Unit: One priority II patient visit with one defect opportunity each Measurement System: Patient Survey, Manual Data Collection, Chart Review, Quality Reports, Registration & Staffing Reports Impact on Business: 25 min. Line of Sight Reduction Per Patient Resulting = Capacity Opportunity Improved Patient Satisfaction, Reduced Complaints, Enhanced Outcomes Improved Staff Satisfaction & Reduced Turnover Improved Daily ED Operational Efficiency Key Takeaway: 40% Wait Reduction & Operating Margin Gains

7 What critical X’s were tested as being root causes of the problem?
Environment People Materials Analyze ED patient volume ED patient acuity Influx of squad patients Referral volume Clinics schedules OR volume Hospital patient volume ED tx room limits/facility constraints Staffing levels Experience & skill level Resident specialty Volunteer/greeter utilization Family needs Role clarification Match of skill sets and assignments Variation of practice Availability of supplies Triage process Registration/Chart prep process Charting procedures  Communication Availability of diagnostic equipment Availability of trams, pumps, etc. Non-optimization of Tracking system Inadequate IS system for tracking/trending No Physician Prescription Writing system No integrated, on-line charting system Quality of measurement Are we measuring the right things? What do we do with what we measure? Need to do more than “track” Feedback systems to quality auditing Need for Improved flow sheet format Lack of on-line charting system for automated monitoring Utilization of minor emergency unit Ancillary services levels Specialty testing delays  ED used as admission unit ED discharge practice Hospital discharge process/timing Consult responsiveness/practices Use of ED for boarding Measure Machines 23 variables & 18 time stamps Analyzed via 2nd. wave of data collection Patient Volume-Related: 10 Staffing Volume-Related: 5 Staffing Mix-Related: 5 Misc: 3 Segmentation/delineation Sequential care vs. parallel processes Methods Improvement implementation/maintenance ownership

8 Improve What critical X’s were tested as being root causes of the problem? 23 variables selected & analyzed through second wave of data collection Census-Related: 10 Staffing Related: 5 Coded: 5 Miscellaneous: 3 What root causes were confirmed and tested in the pilot? Patient Flow Direct-to-bed flow & bedside registration Patient relocation to semi-private space when appropriate Flow Facilitator Care Team Communication Modified Zoning Communication Board Clinical Protocols Streamlined Order Entry & Results Retrieval Process

9 Pilot Design Fishbone diagramming, data collection and statistical analysis determined the Critical X’s (contributing factors) as key components for the randomized pilot. Patient Flow Direct-to-bed flow; Relocation to semi-private space Care Team Communication Zoning; Communication board; Clinical protocols Streamlined Order Entry & Results Retrieval Uses central clerk Important link here: Larry Bossidy, former GE exec and CEO at Allied and Jack Welch

10 What were the pilot factors and results?
Improve What were the pilot factors and results? Patient Flow Direct-to-bed flow & bedside registration Patient relocation to semi-private space when appropriate Flow Facilitator Care Team Communication Modified Zoning Communication Board Clinical Protocols Streamlined Order Entry & Results Retrieval Process Lobby Target 15 min. Study 2 N = 129 Pilot N = 172 Wait Time 34.5 min. 12.6 min. % Defect 51.2% 22.8% MD Target 8 min. Study 2 N = 129 Pilot N = 172 Wait Time 11.2 min. 8.9 min. % Defect 42% 34.9%

11 PILOT RESULTS Lobby WT Study 1 N =30 Study 2 N = 129 Pilot N = 158 MD WT N = 30 N = 127 N = 172 Mean WT (minutes) 31.2 34.5 12.6 16.1 11.2 8.9 Standard Deviation 26.65 16.02 11.69 18.70 46.76 16.68 % Defect 56.7% 51.2% 22.8% 55% 42% 34.9% Z-Score (Attribute) 1.33 1.47 2.25 1.37 1.71 1.89 Important link here: Larry Bossidy, former GE exec and CEO at Allied and Jack Welch

12 PILOT CONCLUSIONS 0.001 2.7 to 31.8 0.000 4.8 to 13.2 0.016
Mood’s Median Test Pilot lobby wait times were better than the established 15 min. target, the defect rate tumbled, and the C.I. validated statistical significance. Results for MD wait times were statistically significant in one of two Mood’s median tests. Positive trending was demonstrated in the comparison of Study 2 to the Pilot. Stakeholders supported department-wide, multi-patient population implementation. P-value 95% C.I. Lobby WT Study 1 to Pilot 0.001 2.7 to 31.8 Study 2 to Pilot 0.000 4.8 to 13.2 MD WT 0.016 1.0 to 16.0 0.772 -2.00 to 3.00 Important link here: Larry Bossidy, former GE exec and CEO at Allied and Jack Welch Lobby WT N MD WT N Study 1 30 Study 2 129 127 Pilot 158 172

13 Improve

14 What are the building blocks of Control?
Guidelines & Assigned Responsibility New Standard Operating Procedure Detailed Who, What and When plan Data Review, Reporting & Accountability Quarterly manual/automated data analysis Monthly reports and control charts Use of Corrective Action Log per guidelines Monthly reports Scheduled reporting to executive leadership Quarterly review to owner peers & executives Communication & Recognition Monthly updates to dept. communication center & newsletter Monthly updates at staff, faculty & resident meetings Incorporation of staff recognition for ongoing positive results