Presentation is loading. Please wait.

Presentation is loading. Please wait.

EUROCONTROL Centralised Services – CS 1 – FAS – CONOPS Workshop Bo Redeborn Principal Director ATM 11October 2013.

Similar presentations


Presentation on theme: "EUROCONTROL Centralised Services – CS 1 – FAS – CONOPS Workshop Bo Redeborn Principal Director ATM 11October 2013."— Presentation transcript:

1 EUROCONTROL Centralised Services – CS 1 – FAS – CONOPS Workshop Bo Redeborn Principal Director ATM 11October 2013

2 Bo Redeborn - EUROCONTROL Centralised Services 2 Centralised Service 1 Flight Plan and Airport Slot Consistency Service (FAS)

3 Flight Plan and Airport Slot Consistency Service (FAS) NOT TO PREVENT FLIGHTS TO OPERATE IMPROVE PERFORMANCE & INCREASE THROUGHPUT Bo Redeborn - EUROCONTROL Centralised Services

4 Overview of all CS CONOPS Workshops 3 September 2013 – ConOps Workshop CS#2 5 September 2013 – ConOps Workshop CS#4 11 September 2013 – ConOps Workshop CS#5 12 September 2013 – ConOps Workshop CS#3 11 October 2013 – ConOps Workshop CS#1 14 October 2013 – ConOps Workshop CS#6 21 October 2013 – ConOps Workshop CS#7 25 October 2013 – ConOps Workshop CS#9 31 October 2013 – ConOps Workshop CS#8 Bo Redeborn - EUROCONTROL Centralised Services 4

5 Proposal Vision 2-0 of the Centralised Services to the European Commission Bo Redeborn - EUROCONTROL Centralised Services 5

6 EUROCONTROL assessment estimated that the CS could realize a total annual cost savings for the entire European network of EUR 150 to EUR 200 Million per year for 10 years a 1,5 Billion to 2,0 Billion cost reduction. Roland Berger conducted a study and confirmed our findings Results are clearly positive and within the range of EUR 126 to 266 Million/per year Benefits and synergies between the different CS are not yet taking into consideration Bo Redeborn - EUROCONTROL Centralised Services 6

7 Overall, the approach used by EUROCONTROL to develop the CBA was adequate, assessing the CS in comparison with the most likely evolution of business as usual. EUROCONTROL has been conservative. EUROCONTROL anticipates that the very positive numbers, being calculated in a conservative manner will actually improve over the next months showing even higher cost reductions, once the synergies between the different services have been calculated, which currently is not yet the case. The report has now been assessed by the Standing Committee of Finance (SCF) The SCF concluded end of September that the 9 CS show potential financial benefits for each of them and advises the PC for its December 2013 session accordingly Bo Redeborn - EUROCONTROL Centralised Services 7

8

9 EXECUTIVE SUMMARY INTRODUCTION CONTEXT Geographical applicability Aim Intended Audience Operational Concept Scope Components Roles & Responsibilities Bo Redeborn - EUROCONTROL Centralised Services 9 CONOPS STRUCTURE

10 REGULATORY REQUIREMENTS Existing applicable regulations Requirements for new/updated regulations to implement/operate LINKS OF THE CS1 to ICAO Global Air Navigation Plan (GANP) SESAR Deployment Interim Deployment Programme (IDP) Pilot Common Projects (PCP) and Common Projects (CP) European Single Sky ImPlementation (ESSIP) ESSIP ANNEX 1 – Information flows ANNEX 2 – Data set Bo Redeborn - EUROCONTROL Centralised Services 10 CONOPS STRUCTURE

11 EUROCONTROL Centralised Services – CS 1 – FAS – CONOPS Workshop Bo Redeborn Principal Director ATM 11October 2013


Download ppt "EUROCONTROL Centralised Services – CS 1 – FAS – CONOPS Workshop Bo Redeborn Principal Director ATM 11October 2013."

Similar presentations


Ads by Google