Presentation is loading. Please wait.

Presentation is loading. Please wait.

National PPP Summit INFRASTRUCTURE FORUM April 2008.

Similar presentations


Presentation on theme: "National PPP Summit INFRASTRUCTURE FORUM April 2008."— Presentation transcript:

1 National PPP Summit INFRASTRUCTURE FORUM April 2008

2 1.Sustaining meaningful relationships between stakeholders 2.Overcoming the partnering challenges with PPP delivery 3.Working with government to ensure efficient delivery of projects 4.Resolving disputes

3 1.1 Sustaining meaningful relationships between stakeholders Partnership Charter Relationship management

4 1.2 Sustaining meaningful relationships between stakeholders Use of common internet information exchange platform – InCITE User Group input User Group empowerment

5 1.3 Sustaining meaningful relationships between stakeholders Bedding in of Partnership

6 2.1 Overcoming the partnering challenges with PPP delivery Construction Face to Face daily/weekly communications Brown field site – constant change to the environment and systems to manage Conflicting priorities - time and cost vs. business continuity - applying the fairness test Negotiation parameters and scope – managing scope creep Getting the right people at the table – commitment to solutions Keeping up with technology Value adding the solution – e.g. ESD, Security Retail and student accommodation– the commercial transition Third Party

7 2.2 Overcoming the partnering challenges with PPP delivery Operations Contract Management Managing changeover from public to private delivery structures and service arrangements KPI monitoring Service standards Increased demand for facilities – Celcat programming Encouraging staff to use alternative teaching methods/technologies Institute liaison with Operator Operations Committee

8 3. Working with government to ensure efficient delivery of projects Partners should understand of the client’s business Flexible Design Development process is required Be committed to delivering outcomes with optimal solutions

9 Understanding the Business In 2004 Buildings not fit for purpose Poor utilization of space IT incompatible Poorly maintained facilities Need for compliance upgrades Inflexible spaces for changing education needs Poor use of energy Inefficient use of ‘footprint’ Inefficient energy and utilities

10 Buildings not Fit for Purpose

11 Not IT Compatible

12 Poorly Maintained Facilities Need for Compliance Upgrades

13 Inflexible Spaces for Changing Education Needs

14 Inefficient use of ‘Footprint’

15 Inefficient Energy and Utilities

16 Southbank Institute of Technology Queensland’s largest Technical and Further Education (TAFE) institute More than 24,000 students including 2,500 international 400 staff Annual budget of $100 million Located close to Brisbane’s CBD

17 Business Solutions Adaptable Flexible Buildings Buildings for the future in keeping with modern precinct Greater public use of facilities Flexible learning spaces Responsive Teaching and Learning Spaces Opportunity to reconstruct core delivery systems and services Opportunity to introduce a alternative teaching modes e.g. Mode 2 Opportunity to introduce a greater range of learning technologies Cost Effective Operations Efficiencies through one-campus operations Greater efficiency of non-core services in the delivery of core services Affordability Limited to Agency Business Case

18 Flexible Design Development Process Ongoing design solutions – throughout the Construction phase Consultation with end users – full access as required Flexible decanting and transition plan – adapting to available space Better management of delays – high level of trust/commitment Variations management process – implement and comply with strict rules from the outset Ability to respond to policy change – Skills Plan

19 Master Plan 11 new buildings 4 refurbished buildings Onsite student accommodation

20 Construction Phase $234 million construction Business-as-usual during construction Two construction stages Design Development in conjunction with client Decanting and use of alternative facilities Project team based at Southbank Institute with significant support from other government agencies including: Department of Education, Training and the Arts Department of Infrastructure and Planning Queensland Treasury Department of Works

21 Construction Timeline To be completed four months ahead of schedule 2005 29 August – Construction begins 2007 22 January Building D annex (new) 29 June - Building H (new) July – winner international Public Private Finance Awards 2007 31 July – Building C (new) 31 October – Building B (refurbished) 2008 20 March - Stage 1 buildings opened by Premier Anna Bligh 14 April – Building E (new) - original schedule 30 June 2008 24 April – Building A (refurbished) 19 May Building F (new) – original schedule October 2008 10 June Building D (refurbished) – original schedule 30 June 2008 7 July – Building G (new & refurbished) original schedule 11 October 2008

22

23 Beauty Therapy ‘Live’ environment

24 Contemporary Music High level of User participation delivered exceptional outcome

25 COTAH Restaurant Increased business

26 Dental Technology World-best technology

27 Gym & Fitness Encouraging corporate and community health

28 Health and Applied Sciences Industry standard teaching and learning environment

29 Creative Industries Purpose-built facility inspiring creativity across disciplines

30 Gallery Spaces for Student Work On-campus exhibitions advance career opportunities and enhance community

31 Indigenous Australian Peoples Unit Community and cultural space

32 Knowledge Transfer Zones Encouraging ‘connections’

33 Lecture & Performance Spaces Flexible spaces across the campus seating up to 650

34 Library & e-Learning Substantial increase in student participation and collaboration

35 Multi-purpose teaching & learning spaces Integrated wireless infrastructure

36 Art Built-In $ 2.5m

37 Campus Heart Services Institute and Third Party

38 Vibrant Outdoor Spaces Award winning designs for Queensland climate

39

40 Resolving Disputes Governance structure for escalation Dispute mechanism

41 Collaborative Results No disputes to date Over 100 variations completed $15m value - 6.4% capital cost On budget Nil delays Ahead of schedule by 4 months No days lost to Institute business No courses cancelled or deferred International business increased

42 Optimal Outcome Energy efficient ‘green’ facilities Flexible learning spaces ‘Live’ teaching and learning environments Accredited standards for fitouts to operate commercially Reconstruction of delivery systems and services * Mode ll learning areas * Use of latest technologies Fully IT networked campus Modern Precinct catering to diverse needs Areas for public use * Ground floor studios * Auditoria * Meeting spaces * Retail Single campus operations Managed risk Value for Money

43 Lessons Early face-to-face engagement with consortia is highly desirable Greater involvement of the service provider in bid development and contract execution Higher level of prescription required prior to financial close – Management Plans * Transition * Change * Service Standards Be clear about expectations regarding levels of innovation Appoint the end-user as State Representative Greater incentives for innovation and productivity

44

45

46

47

48

49

50 63 Bent St Toowong 4066 m: 0409 473 524 e-mail: norm@normjagger.com.au www.normjagger.com NORM JAGGER ETHICAL LEADERSHIP AND GOOD GOVERNANCE BY EXAMPLE. DRIVING BEST PRACTICE THROUGH EDUCATION, COLLABORATION AND CONSENSUS. MAKING A SUSTAINABLE DIFFERENCE IN THE WORLD.


Download ppt "National PPP Summit INFRASTRUCTURE FORUM April 2008."

Similar presentations


Ads by Google