Download presentation
Presentation is loading. Please wait.
Published byAbner Glenn Modified over 9 years ago
1
Many thanks to Henry and Kristen. We are glad to have you as friends and happy to be your contractors.
2
Excavation
3
The hole is getting bigger!
4
Installing Insulated Concrete Form panels or ICF panels
5
Preparing for geothermal loops
6
Geothermal Lines
7
Getting ready for more concrete
8
Final layer of concrete over geothermal lines
9
Geothermal Loops: 10 feet underground
10
Styrofoam Insulated Panel System installation or SIPS for short
11
First layer of SIPS going in
12
Interior framing
13
More SIPS and garage framing
14
Winter on the house project
15
Roofing
16
Adding master bedroom balcony
17
Southeast side of house
18
Northwest side of house
19
Family Room
20
Sun Room
21
Master Suite
22
Dining room floor installation
23
Entrance from garage
24
Family Room
25
Kitchen
26
Dining Area
27
Sun Room
28
Front Entry
29
West bedroom
30
Bathroom
31
East bedroom
32
Master bedroom
33
Master bathroom
34
Basement
35
Our many thanks, again, to our wonderful clients for giving us the opportunity to build their dream home. Thanks to our subcontractors and helpers for all the hard work. And to our families who didn’t see us for some time, but still love us anyway!
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.