Download presentation
Presentation is loading. Please wait.
Published byClaire Ortega Modified over 10 years ago
1
Validation and Verification Report Templates 25 th March 2012 Susanne Häfeli-Hestvik Member of the PD-Forums Executive Committee VP, Director Technical Department, Tricorona
2
2 Consolidation Simplification Digitization The Project Participants fill in a digitized monitoring report template: A lot of the information can directly be retrieved from the digitized PDD
3
3 Some information is in plain text format
4
4 Some information is numerical
5
5 The DOE/secretariat then verifies that information directly: The DOEs web interface gives additional options e.g. so that the DOE can easily tick one box at the end confirming that the information from the PDD is complete and still accurate
6
6 The DOE can also add comments
7
7 The Secretariat will get yet another layer of options
8
8 OVERARCHING PRINCIPLES KISS: Keep it simple and smart Fast accessibility from everywhere and by everyone Traceability Security Project Developer Forum
9
9 FURTHER PRIORITIES Analytical tools will enable checks for typos, data entry errors Enable off-line versions and background synchronization Accessibility from developing countries (low bandwidth) User-friendliness so as to keep training to a minimum Start with verification and the most used templates Project Developer Forum
10
10 AND THEN... Direct data flow from DCS into monitoring report, Linking to other systems such as the EU ETS Project Developer Forum
11
11 The Project Developer Forum (PD-Forum) is a collective voice to represent the interests of companies developing greenhouse gas (GHG) emission reduction projects in international markets under the Clean Development Mechanism (CDM), Joint Implementation (JI) and other carbon emission reduction schemes and programs: www.pd-forum.net susanne@tricorona.se
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.