Presentation is loading. Please wait.

Presentation is loading. Please wait.

PROJECT MANAGEMENT ITERATION REPORT Iteration:2014.xx Date:mm/dd/yy.

Similar presentations


Presentation on theme: "PROJECT MANAGEMENT ITERATION REPORT Iteration:2014.xx Date:mm/dd/yy."— Presentation transcript:

1 PROJECT MANAGEMENT ITERATION REPORT Iteration:2014.xx Date:mm/dd/yy

2 COMPOSER ANGRY ARMADILLO RELEASE HEALTH AND METRICS Release Health: → (Testing) Schedule Health: → (Patch in progress) Scope Health: → (Development Complete) Points Estimated: 804 (no change) Points Accepted: 804 (no change) % Stories Accepted: 100% ( increased 5% since last report ) UPDATE -Patch to sandbox scheduled for 7/15 -UAT and production rollout in July -Key Features Include: -New HTML5 Engine -New PointRoll Branding -Refactored Timeline and Interactions to improve user experience and make the code extensible and maintainable. PROGRESS TO SCOPE (BURN UP) PROGRESS BY ITERATION

3 COMPOSER BIZARRE BADGER RELEASE (2014Q3) HEALTH AND METRICS Release Health: → Schedule Health: → Scope Health: → Points Estimated: 312 (123 added using JEJIT) Points Accepted: 151 (40 in last sprint) % Stories Accepted: 48% (down 7%) UPDATE -HTML5 parity stories are -Release Goals: -HTML5 parity with Flash allowing the build once deploy everywhere -Asset Manager redesign and API integration PROGRESS TO SCOPE (BURN UP) PROGRESS BY ITERATION

4 ASSET API SERVICE RELEASE 1 HEALTH AND METRICS Release Health: (Release is TBD) Schedule Health: → (Planning in progress) Scope Health: → (Backlog not in place) Points Estimated: 264 (decrease was book keeping in rally) Points Accepted: 157 (44 accepted in sprint 2014.13 ) % Stories Accepted: 59% (not all stories identified yet) Sandbox Release: TBD ITERATION UPDATE ­Team completed development on video conversion feature, testing was rescheduled to next iteration due to resource constraints. ­IT provide additional resource to remove bottleneck for development (thanks Mike B and Dave B) ­Permissions research completed, a prototype will be built next iteration for learning PROGRESS TO SCOPE (BURN UP) PROGRESS BY ITERATION Team involved in release support/defect resolution


Download ppt "PROJECT MANAGEMENT ITERATION REPORT Iteration:2014.xx Date:mm/dd/yy."

Similar presentations


Ads by Google