Final Meeting Meeting Ravenna 27.03.08 Lessons learned from the PALOMBINA PILOT PROJECT.

Similar presentations


Presentation on theme: "Final Meeting Meeting Ravenna 27.03.08 Lessons learned from the PALOMBINA PILOT PROJECT."— Presentation transcript:

1 Final Meeting Meeting Ravenna 27.03.08 Lessons learned from the PALOMBINA PILOT PROJECT

2 Final Meeting Meeting Ravenna 27.03.08 Basic Facts about the pilot project Palombina Pilot Project Palombina beach, Ancona Municipality of Ancona and Adriatic ICZM Expert Group Realization planned for 2009

3 Final Meeting Meeting Ravenna 27.03.08 Today ANCONA RAILWAY

4 Final Meeting Meeting Ravenna 27.03.08 Today

5 Final Meeting Meeting Ravenna 27.03.08 Today

6 Final Meeting Meeting Ravenna 27.03.08 Image of Palombina beach RAILWAYCYCLISTIC PATHSHORE LINE

7 Final Meeting Meeting Ravenna 27.03.08 Results attended

8 Final Meeting Meeting Ravenna 27.03.08 Results attended

9 Final Meeting Meeting Ravenna 27.03.08 How WORK HARBOUR SITE around 500.000 m3 of sand To dredge Distance from dredged site to the nourishment, 6 miles to go NOURISHMENT SITE (6 miles to come back)

10 Final Meeting Meeting Ravenna 27.03.08 Technical information The sand dredged in Ancona harbor is an option for the beach nourishment of Palombina The quantity of sand for linear meter of coast: 200 m3 for a meter of beach The working technique is a refluent dredge off the breakwater defense The additional cost for harbor work consisting in pushing longshore the sand stocked on the seaside is equal to 100.000,00.

11 Final Meeting Meeting Ravenna 27.03.08 Cyclistic path from tourist port of Ancona

12 Final Meeting Meeting Ravenna 27.03.08 Activities completed Meetings with experts Spatial data collection Feasibility study Partnership between public and private organizations Working maps produced

13 Final Meeting Meeting Ravenna 27.03.08 Follow up activities planned 1.Planning barriers and/or relocation for the railway 2.Planning a possible tourist revaluation of Palombina beach, redevelopment of existing structures and construction of new ones 3.Creating of green areas

14 Final Meeting Meeting Ravenna 27.03.08 Implementation Palombina is a complex sandy landscape divided between two municipalities, with a strong private activity. At the higher level we needed to achieve a public & private network for the whole area. Is it realistic? Yes, absolutely. Why? All the actions are planned considering the environmental, social and economic impact. The keywords are simplicity and rationality.

15 Final Meeting Meeting Ravenna 27.03.08 Lessons learned 1.It was successful because the proposed plan satisfies actual needs of the beach 2.The hardest part of the work was a creating working network 3.That surprised us the most was the interest and commitment for the realization of the plan 4.We are particularly proud of the real feasibility of all the project