Doug Thiessen, P.E. Managing Director of Engineering Update on the Port of Long Beach ACEC LA January 15, 2014.

Similar presentations


Presentation on theme: "Doug Thiessen, P.E. Managing Director of Engineering Update on the Port of Long Beach ACEC LA January 15, 2014."— Presentation transcript:

1 Doug Thiessen, P.E. Managing Director of Engineering Update on the Port of Long Beach ACEC LA January 15, 2014

2 Port of Long Beach Premier gateway for U.S-Asia trade, major Southern California economic engine

3 Who We Are 3,500 acres of land 4,600 acres of water 6 container terminals 66 Ship-to-Shore cranes 76-foot-deep main channel 2nd busiest U.S. container cargo seaport Part of the worlds 9th busiest port complex

4 Diverse Cargo 3,500-acre Port moves cars, crude oil, petroleum coke, lumber and container cargoes.

5 Big Ship Ready 7,100 TEU ,100 TEU 15,500 TEU ,000 TEU 2013

6 Largest to Call North America 14,000-TEU MSC Corte Real came in October 2013 – too wide to pass through the expanded Panama Canal.

7 Investing in the Future Port has begun a $4 billion upgrade of facilities to stay competitive

8 Current Major Programs Pier G Redevelopment Pier G Redevelopment Middle Harbor Redevelopment Middle Harbor Redevelopment Gerald Desmond Bridge Replacement Gerald Desmond Bridge Replacement On-and Near-Dock Rail On-and Near-Dock Rail Shore-to-Ship Power Shore-to-Ship Power Fire Protection Program Fire Protection Program

9 Middle Harbor $1.2 billion facility will be one of the most technologically advanced terminals in the world.

10 Middle Harbor Phase 1 Currently Underway

11 Phase 2 Phase 1 Middle Harbor Redevelopment 305-acre facility under construction in two phases.

12 Middle Harbor Redevelopment Phase 1- $779.3 Million 10 construction projects 10 construction projects Third-party utility improvements/relocations Third-party utility improvements/relocations Phase 2- $449.7 Million 9 construction projects 9 construction projects Third-party utility improvements/relocations Third-party utility improvements/relocations

13 Gerald Desmond Bridge Replacement $1.3 billion cable-stay bridge; $650 million design-build contract awarded to Shimmick, FCC & Impregilo on July 2012.

14 Pre-Construction Preliminary engineering complete, two-thirds through Right-of-Way work.

15

16 On & Near Dock Rail Improvements Ocean Blvd. Track Realignment Middle Harbor On-Dock Rail *Future project Pier G South Rail Yard* Pier G South Rail Yard* Pier B On-Dock Rail Support Facility* Pier B On-Dock Rail Support Facility*

17 Shore Power Projects Port is reducing air quality impacts through the Clean Air Action Plan. The state has enacted a regulation requiring shore power in 2014.

18 Major Effort Simultaneous construction at all container terminals and 12 berths

19 Project Budget Actual Cost to Date Estimated Final Cost Pier A $19.4 million$16.3 million $18.3 million Pier G $17.9 million$13.9 million $16.5 million Pier J $56.1 million$43.2 million $49.9 million Pier T $33.6 million$24.1 million $31.1 million Total $127 million$97.5 million $115.8 million Project Budgets

20 Fire-Protection Program New Fireboats for Station 15 & 20 New Fireboats for Station 15 & 20 Fireboat Station 15 Replacement Project Fireboat Station 15 Replacement Project Fireboat Station 20 Replacement Project Fireboat Station 20 Replacement Project (Site Selection Underway) (Site Selection Underway)

21

22 Upcoming Consultant Opportunities Construction Management Division: CM Services – Pier G Redevelopment (under evaluation) CM Services – Pier G Redevelopment (under evaluation) On-Call, Inspection & Material Testing (under evaluation) On-Call, Inspection & Material Testing (under evaluation) As-Needed Hydrographic Services As-Needed Hydrographic Services (under evaluation) (under evaluation) CM Services – New Fire Stations, 2014 CM Services – New Fire Stations, 2014 On-Call Construction Mgmt. Services, 2014 On-Call Construction Mgmt. Services, 2014 Other Engineering Divisions: On-Call Cost Estimating Services, 2014 On-Call Cost Estimating Services, 2014

23 Upcoming Contractor Opportunities (Next 12 months) Pier C, Upgrade of Water Facilities, 2013 Pier C, Upgrade of Water Facilities, 2013 Berths F209 Chemoil Facility Improvements, 2013 Berths F209 Chemoil Facility Improvements, 2013 NRG Facilities Relocation/Demolition, 2013 NRG Facilities Relocation/Demolition, 2013 Harbor Scenic Water Valve Replacement, 2013 Harbor Scenic Water Valve Replacement, 2013 Pier F, Cut-off Wall & Pavement Rehab., 2013 Pier F, Cut-off Wall & Pavement Rehab., 2013 Edison Avenue Street Improvement, 2014 Edison Avenue Street Improvement, 2014 Pier J, Bike & Pedestrian Path, 2014 Pier J, Bike & Pedestrian Path, 2014

24 The Future is Big We face big challenges, but we see big opportunities that will bring a promising future to the Port of Long Beach

25 Staying connected


Download ppt "Doug Thiessen, P.E. Managing Director of Engineering Update on the Port of Long Beach ACEC LA January 15, 2014."