1 Recent Activities in Pixel Upgrade G. Darbo- INFN / Genova Pixel Plenary, 13 Dec 2006 o Upgrade Activities in ATLAS G. Darbo - INFN / Genova So we have now 3 layers, or 112 stave, or 1456 modules, or 23296 FE chips.... fully working!!!!!!! Ref.: Claudia 15/12/2006

2 Recent Activities in Pixel Upgrade C. Darbo INFN / Genova Pixel Plenary, 13 Dec 2006 2 What Next Complete the Installation & Commissioning of the Detector Operate the Detector Have great Discovery Physics But also, … Think how to and start R&D for the Upgrade When?  2012 B-layer replacement  2016 ATLAS (Tracker) Upgrade for SLHC What is going on…  See next slides What to do…  Start to discuss today.

3 Recent Activities in Pixel Upgrade C. Darbo INFN / Genova Pixel Plenary, 13 Dec 2006 3 Outline Liverpool Workshop  Organization  Layout & Simulation  Module Integration  Engineering  Sensor & Electronics  Services, Irradiation & Wrap Up ATLAS Upgrade Organization R&D  3D Sensors Since many news comes from, or have been reported at, the Liverpool Meeting I will show some highlights from there.

4 Recent Activities in Pixel Upgrade C. Darbo INFN / Genova Pixel Plenary, 13 Dec 2006 4 Latest SLHC Machine Scenarios Bunch spacing: 25.0 ns50.0 ns Rms bunch length:7.55 cm14.4 cm Long. Profile: GaussFlat Luminous region: 2.5 cm3.5 cm Peak lumi: 15.5 10 34 8.9 10 34 Events crossing: 296340 Lumi. Life time: 2.1 h5.3 h Effective lumi : 2.4 10 34 2.3 10 34 (10 h turn around) Effective lumi: 3.6 10 34 3.1 10 34 (5 h turn around) Note: shorter bunches seems to be an option not achievable because of beam pipe heating 25 ns small ß 50 ns long bunch

5 Recent Activities in Pixel Upgrade C. Darbo INFN / Genova Pixel Plenary, 13 Dec 2006 5 TechnologyRadius(mm) Pitch(  m) Eff. Z pitch(mm)Thickness bPixel50 0.23.5% 1Pixel120500.23.5% 2Pixel180500.43.5% 3Pixel270500.42.6% 4SS2d (uv)380802.2.6% 5SS2d (uv)490802.2.6% 6SS2d (uv)600802.2.6% 7SS1d75080902.6% 8SS1d95080902.6% TechnologyRadius(mm) Pitch(  m) Eff. Z pitch(mm)Thickness b1Pixel40500.22.6% b2Pixel60500.22.6% 1Pixel120500.43.5% 2Pixel200500.43.5% 3Pixel280500.43.5% 4SS2d (uv)380802.2.6% 5SS2d (uv)490802.2.6% 6SS2d (uv)600802.2.6% 7SS1d70080902.6% 8SS1d95080902.6% Layout Strawman layout v.1 now has 4 Pixel Layers with a double B-layer option.  Pixel Members in the Layout Advisory have been active in the last 2 months. Two talks from Pixel at Liverpoo:  Sasha - Lessons from b-tagging Performance of ATLAS Pixel Layout  Vadim - Vertexing with Inner Detector Message from Vadim’s talk:  Vertexing is important for b-tagging and b-physics  “Pixel” layout provides a ~30  40% improvements in Z resolution, ~10-20% improvements in R  respect to strawman original layout (ver.0)  Thinning of Pixel part of ID allows to increase significantly ID resolutions. Strawman layouyt ver.1 Proposed Pixel Layout

6 Recent Activities in Pixel Upgrade C. Darbo INFN / Genova Pixel Plenary, 13 Dec 2006 6 4+3+2 (Pixel, SS, LS) - Strawman Ref.: Abe Seiden / Layout Options

7 Recent Activities in Pixel Upgrade C. Darbo INFN / Genova Pixel Plenary, 13 Dec 2006 7 Module Concepts Maurice showed some concepts for future modules: Expect larger chips; Active edges seem like a key development; No MCC cables & cooling robotically placed, fully tested 1-chip modules. Wire bond to stave after placement. Pre-tested stave structure with integrated bus and integrated, burned-in power adapters present module Active edge sensors to abut 1-chip modules w/o acceptance holes + Module control chip = 1 single module Electrically 3 modules. No module control chip. Ref.: Maurice Garcia-Sciveres / Pixel Module Concepts

8 Recent Activities in Pixel Upgrade C. Darbo INFN / Genova Pixel Plenary, 13 Dec 2006 8 HMCFRP = High Module Carbon Reinforced Plastic (0,2÷0,3 mm) Tubes made of a braided carbon (i.e. ‚stress free) hose (5÷10 W/mK) (0,1÷0,2) mm Graphite Foam isotropic (180 W/mK) Stave Concepts Two Pixel Stave concepts (first time) presented:  IVW, Milano, Wuppertal (see bottom left), LBNL (see bottom right) We should sit around a table to discuss and make an (unique) R&D proposal ~120-250 W/mK ~40-80 W/mK Involute Lay-up (Ply Directions) Fibers travel predominantly thru thickness rather than along laminate trajectory Ref.: Peter Maeting / New Carbon Fiber…Ref.: Neal Hartman / Involute Laminates…

9 Recent Activities in Pixel Upgrade C. Darbo INFN / Genova Pixel Plenary, 13 Dec 2006 9 Cooling Thermal Management Meeting on Wed 6 Dec reported at the Workshop Evaporative is the only explored. Possible gas candidates:  C 3 F 8 :  Used in existing system → experience,  Low pressure.  C 2 F 6 :  Similar, but allows to cover low temperatures.  CO 2 :  Low temperatures.  High pressure.  Low mass flows.  Experience in LHCb, AMS, industry. For environmental reasons we may be obliged to go to CO 2 (C 3 F 8 is 10000 times more effective than CO 2 on Greenhouse effect) Ref.: Georg Viehhauser & Greg Halwell / Summary of Thermal Management ….

10 Recent Activities in Pixel Upgrade C. Darbo INFN / Genova Pixel Plenary, 13 Dec 2006 10 Electronics Issues Kevin reported on the activities at LBL (Abder Mekkaoui) on the design of the input amplifier. 3 designs: “new fixed shaping”, “new ToT” and “optimised old ToT” designs. Submission foreseen Feb ‘07. He also reported some thinking on Control Circuitry, FE and Global (MCC) R/O architectures Philippe Farthouat reported on 130 nm electronics plans, on the proposal of a Common R/O Architecture (MCC) for Pixel and Strips, GB opto links. There will be a common workshop ATLAS-CMS devoted to electronics  19-21 March 2007 at CERN  Announcement and program before Xmas  Introduction - Machine, ATLAS plans, CMS plans  Power systems, opto-links, services  Tracker read-out architectures On-going R&D Triggering with trackers  Calorimeters, muons, trigger/DAQ  Identify/plan potential common building blocks

11 Recent Activities in Pixel Upgrade C. Darbo INFN / Genova Pixel Plenary, 13 Dec 2006 11 3D Sensors For latest 3D Sensor results see Cinzia talk at the last ID week (25/9/2006):  http://indico.cern.ch/conferenceDisplay.py?confId=a0626#1 http://indico.cern.ch/conferenceDisplay.py?confId=a0626#1 Many new Labs & Production Facility joined the 3D ATLAS R&D Collaboration STANFORDSINTEFIRST CNM/ GLASGOW HAWAII BONN BRUNEL/MANCHESTER LBNL NEW MEXICO OSLO PRAHA GENOVA FREIBURG Common organisation For bump-bonding Assembly Irradiation CERN TEST BEAM Bump-Bonding: IZM, AMS, Stanford Testing facilities Processing Ref.: Cinzia Da Vià / 3D Status & Summary

12 Recent Activities in Pixel Upgrade C. Darbo INFN / Genova Pixel Plenary, 13 Dec 2006 12 3D Sensors - Schedule 3D Sensor Meeting in Liverpool - 6 Dec. ‘06  Very successful, large attendance. Aggressive R&D Workplan (to target also b-layer replacement)  Phase 1: Jan ‘07 - Dec ‘07 ATLAS Pixel compatible 3D sensors from vendors, test beam, irradiation, data analysis, status report and risl evaluation  Phase 2: Jan ‘08 - Oct ‘08 Implementation of R&D studies, test structures compatible wit new FE design  Pre-production phase: Dec ‘08 - Set ‘09 Design of new masks for pre-production tests, evaluation of modules with new FE chips Management:  Update R&D proposal with new workplan and interest from laboratories/vendors.  Bi-weekly phoneconference meetings + few per year general meetings.  Milestones Other issues:  Funding seems critical specially next year Meeting Agenda & Talks:  http://indico.cern.ch/conferenceDisplay.py?confId=9185 http://indico.cern.ch/conferenceDisplay.py?confId=9185

13 Recent Activities in Pixel Upgrade C. Darbo INFN / Genova Pixel Plenary, 13 Dec 2006 13 CMS Perspective for Tracker Upgrade Pixel everywhere Module R/O. Make a MCC like controller Use in the Trigger TRIGGER LAYER Today TBM R/O SchemeFuture MCC like scheme Ref.: Tilman Rohe / CMS Tracker Upgrade

14 Recent Activities in Pixel Upgrade C. Darbo INFN / Genova Pixel Plenary, 13 Dec 2006 14 R&D Activities

15 Recent Activities in Pixel Upgrade C. Darbo INFN / Genova Pixel Plenary, 13 Dec 2006 15 ATLAS Upgrade Organization Executive Bodies Advisory Role Reports to Major Discussions Discussions EB USG N. Hessey TC UPO D. Lissauer Review Body M. Tyndel Layout Advisory Committee Layout Group R&D Working Groups Ref.: Nigel Hessey / Steering Group Report

16 Recent Activities in Pixel Upgrade C. Darbo INFN / Genova Pixel Plenary, 13 Dec 2006 16 Membership Nigel Hessey (Coordinator) Giovanni Darbo (Inner Detector) Ian Dawson (radiation and shielding) Philippe Farthouat (electronics) Fabiola Gianotti (ex-officio) Per Grafstrom (machine interface) Vincent Hedberg (radiation and shielding) Peter Jenni (ex-officio) Tatsuo Kawamoto (muons) Francesco Lanni (LAr calorimeter) David Lissauer (technical coordination) Marzio Nessi (ex-officio) Sandro Palestini (muons) Ilya Korolkov (TileCal) Giacomo Polesello (physics) Steinar Stapnes (ex-officio) Abe Seiden (Inner Detector) Stefan Tapprogge (TDAQ) Jeff Tseng (software coordinator) Christian Zeitnitz (LAr calorimeter) Upgrade Steering Group (USG) Tasks... Executive/Policy body:  Sets policy  Follows cost overview  Monitors resources and task sharing  Takes major decisions (or forwards to EB)  Acts as interface to ATLAS Systems and Machine  Sets the overall schedule (in consultation with CMS, machine, ATLAS management)  Requests PO  Make detailed schedule  Follow progress (Review Office)  Estimate resources needed  Make recommendations on choices Membership:  To represent the ATLAS Systems and management + Machine Interface, Electronics, Software, Physics, TC Ref.: Nigel Hessey / Steering Group Report

17 Recent Activities in Pixel Upgrade C. Darbo INFN / Genova Pixel Plenary, 13 Dec 2006 17 Project Office (PO) Composition ATLAS Management (Ex-officio) S. Stapnes, F. Gianotti, P Jenni ATLAS Management and TC: M. Nessi Steering Group Chair: N. Hessey POL: : D. Lissauer PO Deputy/Reviews : M. Tyndel Electronics Coordinator: P. Farthouat ( 2-3 Electronics and DAQ) Radiation and Shielding: V. Hedberg (Acting) Machine Interface : P. Grafstrom Cooling : G. Viehhauser Sensors : N. Unno Integration/Installation : H. Pernegger (Starting early next year) Module Integration : P. Allport Mechanical Structures : (Under discussions, see next slide) LAr : F. Lanni (Acting) Trigger: S. Tapprogge B-Layer Upgrade: G. Darbo Additional persons invited for special discussions. Some permanent members still missing. (Tile, Muons, Trigger) Note (GD): Pixel is poorly represented Ref.: David Lissauer / Project Office Review

18 Recent Activities in Pixel Upgrade C. Darbo INFN / Genova Pixel Plenary, 13 Dec 2006 18 Project Office (PO) organization The Organization of the ATLAS Upgrade is given in: https://edms.cern.ch/file/690177/1/Upgrade_Org_PO.doc https://edms.cern.ch/file/690177/1/Upgrade_Org_PO.doc Upgrade web page: http://atlas.web.cern.ch/Atlas/GROUPS/UPGRADES/ The project office is part of TCn. The PO reports to TC/TMB and the Upgrade Steering Group. (EB when needed) The ATLAS management/Upgrade Steering Group will define the concept of R&D resources, deliverables, Upgrade common funds etc. in the overall ATLAS concept. The ATLAS resource coordinator, TC and ATLAS Spokesperson (s) with the Upgrade PO will develop the MOU for the deliverables of the Upgrade. PO composed of a small core helps coordinate the effort relying on existing TC staff and functions. (i.e. No duplications) A large fraction expected to come from the from major (outside) labs and universities. Ref.: David Lissauer / Project Office Review

19 Recent Activities in Pixel Upgrade C. Darbo INFN / Genova Pixel Plenary, 13 Dec 2006 19 Mechanical Structure / Engineering Partial list of potential Engineering effort: (NOT FINAL – NO Firm commitments yet – but expression of interest expect that additional Eng. groups will be in contact in the coming month) CERN:Andrea Catinaccio BNL : Mechanical Structure Anatoli Gordeev / Margareta Rehak LBNL: Stave Design Bill Miller RAL: Justin Greenhalgh /Andy Nichols GENEVA: Barrel StructureErik Perin KEK: Barrel/Module integrationTakashi NIKEHF: End Cap Patrick Werneke Valencia: End CapJose Vicente Civera LBNL: b-layer/PixelE. Anderson, N. Hartman Milano: b-layer/PixelD. Giugni Regular Engineering meetings will start only after the EC - ID installation Ref.: David Lissauer / Project Office Review

20 Recent Activities in Pixel Upgrade C. Darbo INFN / Genova Pixel Plenary, 13 Dec 2006 20 ID Layout Layout Advisory Committee has been set up  Tasks:  Develop list of performance goals, "Straw man" layout with list of options, and evolve it to "Baseline layout"  Advise USG and PO on layout matters  Membership  Sasha and Norbert added to the initial Pixel membership Layout Group  Anyone working on layout matters  Simulation etc. Developed a document on performance goals, definition of straw man, and options  Straw-man is now 4 pixel layers, 3 SS (Stereo) layers, 2 LS layers  Option: double b-layer Advisory Committee: Phil Allport Allan Clark Mogens Dam Giovanni Darbo Juan Fuster Verdu Mauricio Garcia-Sciveres Nigel Hessey David Lissauer Marzio Nessi Pavel Nevski Richard Nisius Ulrich Parzefall Leonardo Rossi Steinar Stapnes Jeffrey Tseng Mike Tyndel Yoshinobu Unno Dirk Zerwas Alexander Rozanov Abe Seiden Norbert Wermes Ref.: Nigel Hessey / Steering Group Report

21 Recent Activities in Pixel Upgrade C. Darbo INFN / Genova Pixel Plenary, 13 Dec 2006 21 Conclusions Pixel community is becoming active in Upgrade (better represented in the Committee) and at the Liverpool workshop 3D Sensors - Lot of interest a groups joining - real ATLAS R&D New ideas coming for FE Chips, Modules and Stave designs. Who will drive the Upgrade and Replacement of B-layer: Pixel Collaboration or PO? 2005 Genova  2006 Liverpool  2007 ???