1 TexChem Group International LLC Chemical Control for Paraffin / Asphaltene

2 The Benefits of Using Chemical for Paraffin Control NO LOST PRODUCTION DUE TO HOT OILING Reduce Workover Costs – Eliminate Hot Oil Treatments – Eliminate pulling jobs for Paraffin – Eliminate steaming rods when pulled for pump repair Reduce Power Cost From Rod Drag Maintain Paraffin Free Equipment – Rods, flowlines, separators and tanks Corrosion Treatments More Effective

3 What Chemicals are Available? TexChem Group International PEC PEC 3

4 TexChem Group International PEC Effective Treatment for Paraffin

5 PEC 3 Reduces Viscosity in Asphaltenic Crude with Paraffin Control TexChem Group International LLC

6 Chemical Injection Down Annulus – Pumping or Gas Lift Wells Formation Squeeze or Batch Treatment Pump down Chemical Treatment String Treatment Methods TexChem Group International LLC

7 MORROW WELL BEFORE TREATMENT Production = 180 BOPD HOT OIL = 15 DAYS AFTER TREATMENT Production = 180 BOPD HOT OIL=None (10 Mo) Initial Treatment: 55 gallons PEC down annulus Continuous Treatment: 600 ppm PEC (one quart/10BO)down annulus

8 ECONOMIC SOLUTION Hot Oil vs. Chemical Treatment Well Name: Morrow Well Bbls. of Hot Oil Used per Treatment100 Recovery Rate of Hot Oil Bbls/day 140 Oil Production Rate - Bbls/Day140 Price per Bbl. of Oil$25.00 Frequency of Hot Oil Treatments - Days15 Cost of Hot Oil Treatment$ Price of PEC - Dollars/Gallon19.85 Annual Savings Using Chemical Treatment 74,700

9 MORROW WELL BEFORE TREATMENT Production= 60 BOPD HOT OIL = 7 DAYS AFTER TREATMENT Production = 60 BOPD HOT OIL=None (9 Mo) Initial Treatment: 55 gallons PEC down annulus Continuous Treatment: 600 ppm PEC (one quart/10BO)down annulus

10 ECONOMIC SOLUTION Hot Oil vs. Chemical Treatment Well Name: Morrow Well Bbls. of Hot Oil Used per Treatment60 Recovery Rate of Hot Oil Bbls/day35 Oil Production Rate - Bbls/Day35 Price per Bbl. of Oil$25.00 Frequency of Hot Oil Treatments - Days14 Cost of Hot Oil Treatment$ Price of PEC- Dollars/Gallon19.85 Treatment Volume- ppm850 Annual Savings Using Chemical Treatment $36,570

11 SOUTHWEST KANSAS CHESTER WELL BEFORE TREATMENT Production= 10 BOPD = 10 BWPD HOT OIL = 30 DAYS AFTER TREATMENT Production = 18 BOPD = 10 BWPD HOT OIL= None (6 Mo.) Initial Treatment: 55 gallons PEC down annulus Continuous Treatment: 600 ppm PEC (one quart/10BO)down annulus

12 ECONOMIC SOLUTION Hot Oil vs. Chemical Treatment Well Name: CHESTER WELL Bbls. of Hot Oil Used per Treatment25 Recovery Rate of Hot Oil Bbls/day10 Oil Production Rate - Bbls/Day10 Price per Bbl. of Oil$25.00 Frequency of Hot Oil Treatments - Days7 Cost of Hot Oil Treatment$ Price of PEC - Dollars/Gallon19.85 Treatment Volume- ppm600 Annual Savings Using Chemical Treatment Plus 8 BOPD = $72,000 ADDITIONAL REVENUE $80,820

13 Windham G No. 1 Sprayberry BEFORE TREATMENT Production= 13 BOPD = 9 BWPD HOT OIL = 45 DAYS AFTER TREATMENT Production = 13 BOPD = 9 BWPD HOT OIL= None (3 years) Initial Treatment: 55 gallons PEC down annulus mixed in 70 Bbls Hot Oil Continuous Treatment: 600 ppm PEC (one quart/10BO)down annulus

14 ECONOMIC SOLUTION Hot Oil vs. Chemical Treatment Well Name: Morrow Well Bbls. of Hot Oil Used per Treatment70 Recovery Rate of Hot Oil Bbls/day 13 Oil Production Rate - Bbls/Day 13 Price per Bbl. of Oil $25.00 Frequency of Hot Oil Treatments - Days45 Cost of Hot Oil Treatment $ Price of PEC - Dollars/Gallon$20.35 Treatment Volume- ppm 600 Annual Savings Using Chemical$13, Treatmen t

15 Windham G No. 1 Case History

16 RESULTS OF TREATMENT BEFORE AFTER

17 Guide to Successful Paraffin Elimination Problem: Wells have paraffin deposition in tubing, flow lines, separators and tanks Solution: Chemical Treatment w/ PEC Treat crude before paraffin precipitation and deposition occur. – PEC Injection down hole is the best place for chemical and crude to mix. This should be below the point of paraffin deposition. Treatments can be made down the annulus or batch squeeze into formation. – FLEXOIL FM193 must be injected in an oil stream at a point that achieves good mixing. This injection should be at a temperature above paraffin participation and deposition. (Cloud Point) Use an initial concentration of 1000 ppm (5.375 oz./ Bbl Oil) – Concentrations may need to be increased or can be decreased after experience with the particular crude oil being treated. – At concentrations of 55 gallons of PEC to 25 Bbls of oil injected into the formation could actually act as a stimulation treatment should the well have formation damage because of paraffin deposition in the formation. This treatment is even more effective when used with hot oil. PEC should not be introduced into a system after paraffin deposition has be occurred unless there is considerable time, heat and/or agitation to put the paraffin back into solution.

18 PEC EFFECT ON VISCOSITY