1 Security WG: Report of the Fall 2014 Meeting BSI, London UK 14 November 2014 Howard Weiss NASA/JPL/PARSONS howard.weiss@parsons.com +1-443-430-8089

2 Meeting Agenda 10 November 2014 – 08:45 – 09:45: CCSDS Plenary (room G1) – 09:45 – 10:45: Systems Engineering Area (SEA) Plenary (room 503) – 13:30 – 17:30: Security WG (room 505) – Welcome, introductions, logistics, agenda review – Review results of Spring 2014 (Noordwijkerhout) meeting – Status of documents, action items – Future work areas for CWE Framework – Charter review (if required) – Threat book revision review (Weiss) – ESA Secure Software Development (Fischer) – Working Group Dinner

3 Meeting Agenda (cont) 11 November 2014 (08:45 – 17:30) (room 505) – Network Layer Security » IPsec Testing + Yellow Book Status (Sheehe + others?) » Network layer security for non-IP environments (Fischer/Aguilar- Sanchez) – Key Management Blue Book (Fischer/Aguilar-Sanchez) » KM for SDLS extended procedures (Fisher) » KM for DTN (Burleigh) » KM for EUMETSAT (Texier) – Link Layer Security Update Discussion (Biggerstaff/Weiss/Aguilar- Sanchez) – Physical Layer Security (Aguilar-Sanchez) – Other areas of discussion – Proposed new areas of work – WG dinner? 12 November 2014 – 08:45-17:30: Space Data Link Security WG (room 514) 13 November 2014 – 08:45-17:30: Space Data Link Security WG (room 514) 14 November 2014 – 16:00-17:30: SEA Wrap-up Plenary (room 504)

4 Attendance NameOrganizationEmail Address Howard Weiss (Chair)NASA/JPL/PARSONShoward.weiss@parsons.com Gordon BlackUK Space Agency/Qinetiqdgblack@qinetiq.com Daniel FischerESA/ESOCdaniel.fischer@esa.int Ignacio Aguilar-SanchezESA/ESTECignacio.Aguilar.Sanchez@esa.int Chuck SheeheNASA/GRCcharles.j.sheehe@nasa.gov Dorothea RichterDLRdorothea.richter@dlr.de Julian AiraudCNESjulien.airaud@cnes.fr Guillame TexierEUMETSATguillame.texier@eumetsat.int Brandon BaileyNASA/GSFCbrandon.t.bailey@nasa.gov Tomaso DeColaDLRTomaso.decola@dlr.de Keith ScottNASA/JPL/MITREkscott@mitre.org Scott BurleighNASA/JPLScott.burleigh@jpl.nasa.gov

5 Executive Summary  Attendees from UK Space Agency, ESA/ESTEC, ESA/ESOC, DLR, CNES, EUMETSAT, NASA/GRC, and NASA/JPL. Martin Pilgram (DLR) has retired and will be missed in the SecWG. NASA/JSC did not attend due to funding issues (and was also missed).  No charter or framework changes were required. However, there was a discussion on SecWG future programs per the CESG/CMC request for future work programs.  Reviewed action items from Noordwijerhout. Carrying several forward and all others were completed.  Reviewed revision of Threat GB. A large amount of restructuring and rewrite was provided by Daniel Fisher. The WG will review these changes and discuss them in a telecon on 12 Dec.  Discussed ESA Secure Software Initiative (Fischer)  Reviewed Network Layer Security adaption profile testing. The BB is essentially completed awaiting testing results. NASA/GRC is writing the Yellow Book and will provide feedback into the Blue Book. CNES has established a testing environment and there is a connection between GRC and CNES to accomplish on-line testing.  An overview of the (cancelled) SUMO and its space cyber consortium was provided (Sheehe)  Discussed Network Layer security for non-IP environments (i.e., space packets). This would provide IPSec-like functions directly over space packets when not in an IP environment. It was decided that this will become a new work item.  Discussed and reviewed the SDLS key management “extended procedures” document which will be an SDLS BB  Discussed SDLS interoperability testing at ESOC (Fischer)  Discussed DTN Key Management (Burleigh)  Discussed EUMETSAT key management (Texier)  Discussed DTN Security plans and the streamlined Bundle Security Protocol (Scott)  Discussed physical layer security (Aguilar-Sanchez)  Discussed the need for a cloud-based testing environment to eliminate the need for agency “sandboxes” and hard-to-obtain external connections and firewall changes.

6 Summary of Goals and Deliverables 1. Discussed the long term set of programs that the SecWG would like to tackle over the long term per CESG/CMC requests. 2. KM Magenta Book for symmetric KM is progressing in lock step with the SDLS extended procedures KM Blue Book. Reviewed DTN KM and EUMETSAT KM. 3. Major restructuring proposal for the Threat Green Book that has to be reviewed in depth by the WG and discussed on 12 Dec. 4. NASA/GRC and CNES testing is progressing on Network Layer Security. 5. Decided to request program start for Network Layer over space packets. 6. Discussed Physical Layer Security. 7. Reviewed SDLS progress 8. Discussed DTN security. 9. The Algorithms GB is in CESG polling.

7 SEA Area MID-TERM REPORT SUMMARY TECHNICAL STATUS 1.Security WG Goal: Working Status: Active _X_ Idle ____ Summary progress: documents actively being produced: Key Management MB, Threat GB revision, Network Layer BB. All docs green. Progress since last meeting: threat GB rev, network layer security testing, KM MB progress. Problems and Issues: None status:OKCAUTIONPROBLEM Comment: Working Group is advancing and producing good products. Docs OK.

8 Near-Term Schedule DeliverableMilestoneDate Key Management Blue Book Continue drafting next revision03/15 Network Layer Profile Completed per testing results feedback Threat Document Revision 4 rd revised draft03/15 Network Layer Yellow Book Final03/15 (or earlier)

9 Future Work Areas  Network layer security over Space Packets (priority #1, 2017)  Application layer security (priority #2):  TLS adaptation (2018)  Security services in the application layer (2020)  Physical layer security (spread spectrum, frequency hopping, coding) (priority #3, 2019)  Key Management Yellow Book  Network layer security Green Book  Mission Operations Security Guide (2018)  DTN Security (2018)  Secure Software Development Guide (2019)  Cross Support Security (2024)  Roadmap (2018)  Link layer security for USL (migration of SDLS) (2025)

10 Open Issues  None

11 Action Items Item NumberAction Item:Assigned to:Date Due: SecWG1114:1Review Threat Green Book RestructuringAll12/12/14 SecWG1114:2Adapt non-IP network layer security presentation into a White Book proposal. Daniel Fischer02/15/14 SecWG1114:3Revise KM document for WG reviewDaniel Fischer02/15/14 SecWG1114:4Look at NIST 800-152 for possible inclusion into KM docs (carried from last mtg) Daniel Fischer01/15/15 SecWG1114:5Update KM green book with EUMETSAT inputs. Guillame Texier03/01/15 SecWG1114:6Investigate how we provide assistance to another WG when the SecWG does not produce a document Howard Weiss12/1/15 SecWG1114:7White paper on link layer security (from last meeting). (carried from last mtg) Ignacio Aguilar-Sanchez03/01/15

12 Resource Problems  Resources had been adequate to perform the current tasks although personnel have only limited time percentage to apply to CCSDS tasks.  Loss of JSC member attendance hurts – hopefully this issue will be resolved before the next meeting.

13 Risk Management Update  Must ensure that the current trend of additional resources remains and that resources don’t shrink.

14 Cross Area WG / BOF Issues  Joint meeting with Space Data Link Security WG  SecWG meeting attended by DTN WG members (including chair)

15 Resolutions to be Sent to CESG and Then to CMC  Resolution: The SecWG will be actively engaged in the review of all Red Books:  Levels of involvement range from cursory examination of the Red Books under development, to active involvement in the development of the books.  Resolution: All CCSDS document editors will reach out, early in the development of the book to the SecWG to reduce downstream security issues.  Resolution: Security shall be addressed in all new project initiations. All new projects should consider the extent to which security is relevant. Considerations will be documented in the project initiation request. STATUS???

16 New Working Items, New BOFs, etc.  Network Layer Security for non-IP Environments.

17


Download ppt "Security WG: Report of the Fall 2014 Meeting BSI, London UK 14 November 2014 Howard Weiss NASA/JPL/PARSONS +1-443-430-8089."

Similar presentations


Ads by Google