1 2009 Bidders Workshop Attachment D August 3, 2009

2 2009 Bidders Workshop Offers are due Monday, August 24 and must be received by 10 AM PDT. Version –Microsoft Word or Excel 2003. If you have Microsoft 2007 please save as "2003“ –Avoids the need to re-send files or convert them Click “Enable Macros” when opening Attachment D. Delete all unrelated information from each tab or column from your offer. Name each file with a unique name to ensure differentiation. –For example, submit a conforming offer with PG&E’s standard collateral requirements (offer A) and, in addition, alternative offers for price and security amounts (offer B).

3 2009 Bidders Workshop D-1: Participant Proposal Project Description and Contact Information 1 6435 2

4 2009 Bidders Workshop D-1: Participant Proposal Project Description and Contact Information Project Information: Full Legal Project Name: Project Location: Street Address: City, State, Zip Project Description Select Offer Type:Select Buyout Option: Choose One $ 1 Select Facility Status: Enter Purchase Price, or Buyout Price if applicable 2009 Bidders Workshop San Francisco area 245 Market Street Auditorium San Francisco 94105CA Attachment D and PPA PPA PPA + Buyout (I) Purchase and Sales Agreement PSA (II) Sites for Development (III) Choose One New Existing $ Joint Development / Ownership Combo of PPA & Joint Development/Ownership

5 2009 Bidders Workshop 2 Contact Information: Company Name: Company Address: City, State, Zip Participants Name: CA Authorized Contact #1: Title of Contact #1: Phone Number #1: Alt. Number (Cell) #1: Fax #1: Email Address #1: Authorized Contact #2: Title of Contact #2: Phone Number #2: Alt. Number (Cell) #2: Fax #2: Email Address #2: D-1: Participant Proposal Project Description and Contact Information 94105 Pacific Gas & Electric San Francisco area San Francisco PG&E

6 2009 Bidders Workshop 3 Guaranteed Milestones and Delivery Term: Guaranteed Construction Start Date: (mm/dd//yyyy) Guaranteed Commercial Operation Date: (mm/dd/yyyy) 45 Delivery Term Months Product:ERR Type and Capacity: Choose One (2) Combination of products: As Available Baseload Peaking Dispatchable Choose One None Peaking + As Available (1) Select one of the following products: Peaking + Other Dispatchable + As Available Choose One Biodiesel Biomass Fuel Digester Gas Fuel Cell using Renewable Fuels Geothermal Landfill Gas Ocean Wave, Ocean Thermal, or Tidal Current Qualifying Municipal Solid Waste Conversion Small Hydroelectric (30 MW or less) Solar Photovoltaic Solar Thermal Wind Contract Capacity MW If filed with the CEC for pre-certification, select the filing date: Date of the Application: Specify Cooling: D-1: Participant Proposal Project Description and Contact Information Scheduling Coordinator Check this box if you want PG&E to be SC. X For Existing Facility Short Term Offer Only Index Pricing Yes X 05/01/2011 No Years 3.75 Index Market: TOD: Yes X No Other Choose One 05/01/2010

7 Short-Term Offers: Any offers with a term less than 10 years Offers up to 5 years in length from existing resources should use Attachments H and N and amend as necessary –Offer price may be fixed or indexed a) If index pricing is selected, TOD factors do not apply. b) If fixed pricing is selected, bidder can opt for TODs factors or not. Offers 5 years or greater from existing resources, and all offers from new resources should use the long-term contract forms (Attachment H) –Price must be fixed –TOD factors apply 2009 Bidders Workshop

8 4 1.Will your plant be supplemented with natural gas or other fossil fuel? 2.If so, what fuel and what percentage of the fuel will this be? 3.Is the Project subject to an RMR Agreement with CAISO? 4.If so, which type of RMR Agreement? % Fuel D-1: Participant Proposal Project Description and Contact Information

9 2009 Bidders Workshop 5 Transmission & Cluster Information

10 2009 Bidders Workshop 5 Transmission & Cluster Information

11 2009 Bidders Workshop 6 D-1: Participant Proposal Project Description and Contact Information

12 2009 Bidders Workshop D-2: Participant Proposal Energy Pricing Sheet 3 1 24

13 2009 Bidders Workshop 1 D-3: Estimated Energy Production Profile 2 Please provide a generation profile forecast of each month's average-day net output energy production, stated in MW by hour, by month and by year.

14 2009 Bidders Workshop Offer Deposit –Due upon shortlisting = $3/KW Project Development Security (PDS): –Due upon contract execution = $15/kW –Due within 30 days from CPUC approval to COD $100/kW (for dispatchable products) $100/kW * greater of (i) Capacity Factor or (2) 0.5 (for all other products). Delivery Term Security (DTS): due at COD –Where x = 6, 9, 12 months minimum expected revenue –Short-term offers: see table on page 54 of the solicitation protocol –Minimum Expected Annual Revenue Post-TOD average price x average Guaranteed Energy Production (GEP) GEP is resource dependent: –Solar: 80% of expected Contract Quantity –Wind: P95 value or 80% of expected Contract Quantity in interim –Other: 90% of expected Contract Quantity For short-term offers with index pricing, indicate on tab D-1 the months of revenue offered for DTS because it can not be calculated if index pricing is chosen on tab D-3.

15 2009 Bidders Workshop D-4: Dispatchable Product Profile 1 2 3

16 2009 Bidders Workshop 21 D-4: Dispatchable Product Profile

17 2009 Bidders Workshop D-4: Dispatchable Product Profile 3

18 Appendix

19 Resources less than 1.5 MW –Standard tariff available to all eligible renewable resources at http://www.pge.com/b2b/energysupply/wholesaleelectricsuppliersolicitation/standardc ontractsforpurchase http://www.pge.com/b2b/energysupply/wholesaleelectricsuppliersolicitation/standardc ontractsforpurchase –Term up to 20 years –Price set at Market Price Referent Based on combined cycle cost Determined by CPUC on an annual basis Levelized price depends on contract term and online date PG&E’s Proposed 500 MW PV Program –Application pending at CPUC –https://www.pge.com/regulation/PV-Program-PGE/Pleadings/PGE/2009/PV-Program- PGE_Plea_PGE_20090224-01.pdfhttps://www.pge.com/regulation/PV-Program-PGE/Pleadings/PGE/2009/PV-Program- PGE_Plea_PGE_20090224-01.pdf