Presentation is loading. Please wait.

Presentation is loading. Please wait.

CTUIR Grande Ronde Subbasin Restoration Project Project 199608300 Confederated Tribes Umatilla Indian Reservation Presented by: Carl Scheeler, CTUIR Wildlife.

Similar presentations


Presentation on theme: "CTUIR Grande Ronde Subbasin Restoration Project Project 199608300 Confederated Tribes Umatilla Indian Reservation Presented by: Carl Scheeler, CTUIR Wildlife."— Presentation transcript:

1 CTUIR Grande Ronde Subbasin Restoration Project Project 199608300 Confederated Tribes Umatilla Indian Reservation Presented by: Carl Scheeler, CTUIR Wildlife Program Manager

2

3

4 PROJECT PARTNERSHIPS

5 PROJECT ACTIVITIES n Project Planning, Design, & Implementation n Interagency/Landowner Coordination n Coordination with GRMWP & Project Proposal Development n Environmental Compliance (ESA, NEPA, Cultural Resources, 404 Permits) n Subcontracting & Contract Administration/Inspection n Project Maintenance n Monitoring & Evaluation

6 PROJECT ACCOMPLISHMENTS (2002-2004) n Completed phase 3 McCoy Meadows Restoration Project: --450 acre WRP easement --1 mile restoration channel --4 miles livestock fence --2,000 trees/shrubs planted n Completed Longley Meadows Restoration Project & Mainstem Grande Ronde River Habitat Enhancement Project: --284 acre BPA/CREP easement (4 stream miles) --7 miles livestock fence --Water development (well, 9 troughs) --25,000 trees/shrubs planted)

7 PROJECT ACCOMPLISHMENTS Cont (2002-2004) n Partnership with ODFW, GRMWP, and Wallowa Resources to plan and implement Phase 1 Wallowa River Restoration Project (completed Sept 2004) n Initiated planning/design/permitting/funding acquisition on NK West Restoration Project and Meadow Creek Habitat Enhancement Project scheduled for construction in 2004-05

8

9

10

11

12 McCoy Meadows Upper Meadow September 2002

13

14

15

16

17 McCoy Meadows Restoration Project Phase 2 Meadow Creek Phase 1 Project Area

18 McCoy Meadows Lower Meadow September 2002

19

20

21

22

23

24

25 Channelized Bear Creek Reach 1999

26

27

28 Bear Creek (before & after) Oct 2002 to May 2003

29

30 November 2002 July 2003


Download ppt "CTUIR Grande Ronde Subbasin Restoration Project Project 199608300 Confederated Tribes Umatilla Indian Reservation Presented by: Carl Scheeler, CTUIR Wildlife."

Similar presentations


Ads by Google