Team Members: Thong Truong Paul Lucas Khoi Nguyen Asgedom Grehiwot Mircea Bec Meshari Ebrahim Faculty Advisor: Dr. Faryar Etesami Industrial Adviosr :

Similar presentations


Presentation on theme: "Team Members: Thong Truong Paul Lucas Khoi Nguyen Asgedom Grehiwot Mircea Bec Meshari Ebrahim Faculty Advisor: Dr. Faryar Etesami Industrial Adviosr :"— Presentation transcript:

1 Team Members: Thong Truong Paul Lucas Khoi Nguyen Asgedom Grehiwot Mircea Bec Meshari Ebrahim Faculty Advisor: Dr. Faryar Etesami Industrial Adviosr : Rory Olson

2 Background Information Mission Statement Project Plan Customer Identification Product Design Specification House of Quality Technical Risk Management Q&A

3  Most of Boeing design aircrafts are affected by corrosion.  How do they prevent corrosion?  Process of preventing corrosion- sealing and curing.  The two current approaches of sealant are known as “traditional” and “lean” methods.  Advantages and disadvantages of each method.

4 Advantages: ― Hold many parts. ― Has humidity control. Disadvantages: ― Large Size, costly to move. ― Hardwired/Plumbed. ― Inefficient flow control

5 Advantages: ― Proper size and flow. ― Not hardwired. ― Apply 120v AC Disadvantages: ― No humidity control. ― Plumbed.

6 Design a device which can embrace the advantages of the two current methods together to produce a highly efficient curing oven. Equip the current oven with a non-corrosive, humidity control and maintain a lightweight design. Design oven will have on board water supply.

7 Project Milestones Task Start DateFinish DateDue Date Initial Brainstorming Jan 9Jan 28- PDS Report Jan 9Jan 28Jan 30 External Search Jan 20Feb 1Feb 27 PDS Report Presentation Jan 30Feb 13 Initial Design Feb 3Feb 20- Design Feb 20March 10- Design Evaluation March 10March 12- Progress Report Jan 30March 10March 12 Progress Report Presentation Feb 20Feb 25Feb 27 Prototype & Test April 2May 2- Redesign May 2May 10- Repeat Prototype & Test May 10May 17- Manufacture May 17Jun 1- Assemble/Install/Test Jun 1Jun 10-

8 Internal: PSU Capstone Program. Dr. Etesami, Capstone Instructor. Capstone Team Members. External: Boeing Company. Rory Olson, Boeing Research and Development Engineer

9 Performance: Quality and Reliability: Priority Maintain 135 ± 5 o F Humidity of 50% ± 5% RH 1 out of 1000 part failure. High

10 Life in Service: At least 5 years with little maintenance. Materials: No silicone products can be used in the fabrication or assembly of the oven. Use corrosion resistant materials. Dimensions: for this project we would be using 3’ wide x 3’ tall x 4’ deep oven. Ergonomics: Weight light of water tank(<35 lbs. and 4’ height) Priority High Medium Low

11 Parameter Importance Customer Engineering Criteria Competition Temperature ( o F) Humidity (% RH) Cost ($) Power Source (Volts AC) Weight (lbs) Flow Control Water Supply Current Designs Performance 10 Boeing ***** ---***-** Mobility 6 --****** ****** Testing 9 ***** ---**-- Maintenance 7 --****----- Ergonomics 2 ----***-****** Installation Project Team --*******-*****- Current Design _135N/A 120200NoN/A - Target _13550%2000120300YesPortable -

12 Scope Definition: A “scope control process” will be maintained throughout the lifetime of the project. Performance: Performance of each team member will influence directly to the success of the product. Reliability: The product must be reliable since it utilizes on a daily basics. Identify the design’s weaknesses and eliminate or minimize their effects.

13 Background Information Mission Statement Project Plan Customer Identification Product Design Specification House of Quality Technical Risk Management

14


Download ppt "Team Members: Thong Truong Paul Lucas Khoi Nguyen Asgedom Grehiwot Mircea Bec Meshari Ebrahim Faculty Advisor: Dr. Faryar Etesami Industrial Adviosr :"