Cultural Heritage in REGional NETworks REGNET Report on Content Group Meeting Extended Project Management Group Meeting 2002-06-26.

Similar presentations


Presentation on theme: "Cultural Heritage in REGional NETworks REGNET Report on Content Group Meeting Extended Project Management Group Meeting 2002-06-26."— Presentation transcript:

1 Cultural Heritage in REGional NETworks REGNET Report on Content Group Meeting Extended Project Management Group Meeting 2002-06-26

2 June 2002REGNET Status of work in WP 2 /3 (IMAC) 2 Working plan for the meeting Validation: Introduction of tools for testing (forms, questionnaires, software tools), agreement on test criteria, task assignment and scheduling. Definition of next steps. Preparation of data: Discussing and solving open issues regarding the data entry and data preparation for the REGNET demonstrator. Updated view of the data available (status reporting). (Further) Content Collection Discussion the necessity of further content (for the portal), responsibilities and content collection plan. Internationalization aspects. Discussion & working groups (Tuesday) Finalising concept and tools. Starting point for the validation. First tests? Feedback? Presentations & discussion (Monday) Preparation of Review Meeting and next report (2)

3 June 2002REGNET Status of work in WP 2 /3 (IMAC) 3 Report on Content Group Meeting 1. Available Content (quantitative dimensions) Object.. Themes.. Shop Items.. Status reporting could not be finished in Sofia. All presentations will be uploaded to the server in order to give each partner the possibility to inform about the status and data available!

4 June 2002REGNET Status of work in WP 2 /3 (IMAC) 4 2. Data Entry Issues Report on Content Group Meeting Content production should be stopped [Minimum standard: not only in native language, but in english also - this must be done and delivered] Available data will be processed in the way already started [Export, mapping, conversion] => All partners will get their own databases for testing (Content integrity and quality check) and usage (Start at the end of June!)

5 June 2002REGNET Status of work in WP 2 /3 (IMAC) 5 2. Data Entry Issues Report on Content Group Meeting Future scenarios: Solutions for online and offline data entry will be offered by the CSCs (parallel) to support different scenarios: - upload - edit records - local management (offline templates, maybe also databases, e. g. MySQL) This is a task not yet fully completed, tools must be refined in order to find a convenient solution.

6 June 2002REGNET Status of work in WP 2 /3 (IMAC) 6 3. Feedback to the tools (demonstrated during 1st/2nd day) Report on Content Group Meeting Data Entry Intensive discussion mainly about individual features (how it functions, is it possible?,...) and consequently a kind of further requirement definition. First requirements could be fixed (validation procedures etc.) but 1. Functionality must be tested intensively [CPs] 2. Usability must be tested intensively [CP expert group] 3. Synchronization is needed especially for the themes template (which is not an individual application, but a tool by used by each partner in the same way) [TARX, AIT,...]

7 June 2002REGNET Status of work in WP 2 /3 (IMAC) 7 3. Feedback to the tools (demonstrated during 1st/2nd day) Report on Content Group Meeting Search & Retrieval (Multi-Site-Search) Further testing necessary for detailed feedback E-Publishing Most of the comments were related to the interface & output: - The use for content providers became not transparent (How could products look like? Different outputs are necessary, e. g. virtual galleries, print products, presentations) - Interface (& speed) must be improved - Editing facilities must be enhanced: actually the publisher has no control Proposal/Agreement: Further effort to develop an interface for the integration of external applications (optional for CPs)

8 June 2002REGNET Status of work in WP 2 /3 (IMAC) 8 Report on Content Group Meeting 4. Validation schedule: Start on 1st of July 2002 ! Step-by-Step approach Sofia Meeting Test finalising Functional tests Usability tests (heuristic, scenarios) 06/28/0207/05/0207/19/0215/08/2002 Which functionality is available ? Content (integrity and quality) tests Red light: external solution Orange light:improvements necessary/possible before carrying out further tests Green light: go for usability tests

9 June 2002REGNET Status of work in WP 2 /3 (IMAC) 9 Strategy for pragmactic testing High-level testing - functionality available or not? [Could be done in Sofia?] If yes, using test cases already available? If no test cases available, they must be modelled 4. Validation approach Discussion about procedure is still needed (VALT, IMAC, MOT). Report on Content Group Meeting

10 June 2002REGNET Status of work in WP 2 /3 (IMAC) 10 Report on Content Group Meeting Already assigned tasks: E-Shop/Catalogue Management/Auction System MUS, NRM, LMG, GRAN Topic Map Generator, Viewer MECH, CC, ALI, GRAN Data Generation (Entry) SUL, ONB, KVA Search & Retrieval ICCS, ONB, MECH, CC Portal ICCS, KVA, ALI Multilinguality TARX, MUS, IAT For functional tests, scenario definition, translation, card sorting experiments

11 June 2002REGNET Status of work in WP 2 /3 (IMAC) 11 Report on Content Group Meeting Already assigned tasks: Heuristic Tests ALI, CC, KVA Language Check (English) IAT, ONB, TARX, MUS Expert Groups Validation PM Methodology Coordination Reporting IMAC Responsibilities for generating new content must be assigned.

12 June 2002REGNET Status of work in WP 2 /3 (IMAC) 12 4. Validation - What is needed! Report on Content Group Meeting Stop & Go- decision 2002-06-30 Stop of technical development and also of content production! Available content must be processed firstly! Definitive access information [URL, Login, Password] Documentation ! In order to get familar with the tools

13 June 2002REGNET Status of work in WP 2 /3 (IMAC) 13 5. To answer occured questions... Report on Content Group Meeting Language check Could be added to the content quality assurance sheet Should be carried out for the portal (structure) by an expert group (not only the individual partners for their languages) Check the language(s) in context! Content collection plan Procedures to assure the gathering and integration of new content for the portal: gathering could be done with the help of the content tracking sheet. Integrating - is a technical problem.

14 June 2002REGNET Status of work in WP 2 /3 (IMAC) 14 8. Other Issues Report on Content Group Meeting Next Meeting Content Provider Meeting 2.-3. September 2002 Mechelen (Belgium) Carry out missing tests (offline) End of validation phase (?)- Reporting and critical review

15 June 2002REGNET Status of work in WP 2 /3 (IMAC) 15 6. Reporting: D7 Validation of the REGNET System operation & Preparation of the demonstration phase Report on Content Group Meeting Part 1: Validation 1. Validation process 2. Description of user groups 3. Methodology of the validation process 4. Results of the validation process Due until 2002-06-30 Part 2: Preparation of Demonstration Phase 1. Set up of legal framework 2. Set up of the technical infrastructure 3. Set up of databases, services, products 4. Test of relevant business processes 5. Training of core user groups 6. Marketing efforts IMAC WP 3.1 VALT WP 3.2 First version possible until 2002-28-06 ?

16 June 2002REGNET Status of work in WP 2 /3 (IMAC) 16 7. Review Meeting 2002-07-04 Planning: Content related issues WP 2.1 Presentation of content cases (30 minutes) 1. Introduction - Tasks, work done, status (IMAC) 10 minutes 2. Tools for (offline) data entry (TARX) 5 minutes 3. Topic map structuring (TARX) 5 minutes 4. Content Cases 1 - SUL 5. Content Cases 2 - TARX (MECH/GRAN) 6. Content Cases 3 - ICCS Technical partners should prepare demos using real data. Already fixed for E-Shop (NRM, LMG, GRAN) [ZEUS] Final preparation (after lunch) Report on Content Group Meeting


Download ppt "Cultural Heritage in REGional NETworks REGNET Report on Content Group Meeting Extended Project Management Group Meeting 2002-06-26."