Presentation is loading. Please wait.

Presentation is loading. Please wait.

Doc.: IEEE 802.15-01/464r0 Submission November, 2001 John Barr, MotorolaSlide 1 Project: IEEE 802.15 Working Group for Wireless Personal Area Networks.

Similar presentations


Presentation on theme: "Doc.: IEEE 802.15-01/464r0 Submission November, 2001 John Barr, MotorolaSlide 1 Project: IEEE 802.15 Working Group for Wireless Personal Area Networks."— Presentation transcript:

1 doc.: IEEE 802.15-01/464r0 Submission November, 2001 John Barr, MotorolaSlide 1 Project: IEEE 802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3 Opening Report 12Nov01] Date Submitted: [12Nov01] Source: [John Barr] Company [Motorola] Address [1303 E. Golf Road, Schuamburg, IL 60196] Voice:[+1 847 576-8706], FAX: [+1 847 576-6758], E-Mail:[John.Barr@Motorola.com] Re: [01453r3P802-15_TG3-November01-Meeting-Objective-and-Agenda.xls] Abstract:[TG3 Chair Report to 802.15 WG] Purpose:[TG3 chair report to WG to update them from the last session on all work items.] Notice:This document has been prepared to assist the IEEE 802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release:The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by 802.15.

2 doc.: IEEE 802.15-01/464r0 Submission November, 2001 John Barr, MotorolaSlide 2 IEEE 802.15 Working Group for Wireless Personal Area Networks TG3 Opening Report November 2001, Austin, TX USA 802.15

3 doc.: IEEE 802.15-01/464r0 Submission November, 2001 John Barr, MotorolaSlide 3 Agenda Goals of November Meeting IEEE 802.15.3 PAR Status and plans for TG3 Key November Sessions

4 doc.: IEEE 802.15-01/464r0 Submission November, 2001 John Barr, MotorolaSlide 4 Goals of the November Meeting Conference call status, including approval of any ad hoc business Review draft (D08) comments Resolve comments and open issues Create amendments document for D08 to D09 Complete drafting update to D09 Prepare WG letter ballot for D09 Prepare for Post-January sponsor ballot Schedule RevCom if necessary

5 doc.: IEEE 802.15-01/464r0 Submission November, 2001 John Barr, MotorolaSlide 5 IEEE 802.15.3 PAR Wireless Medium Access Control (MAC) and Physical Layer (PHY) Specifications for High Rate Wireless Personal Area Networks (WPAN) –… wireless connectivity with fixed, portable and moving devices within or entering a Personal Operating Space (POS) (up to 10 meters in all directions enveloping a person) –… interoperability or coexistence with other 802.15 TG –… coexistence with other wireless devices in conjunction with Coexistence Task Groups such as 802.15.2 –… low complexity, low cost, low power –… >20Mbps to satisfy a set of consumer multi-media industry needs for WPAN communications.

6 doc.: IEEE 802.15-01/464r0 Submission November, 2001 John Barr, MotorolaSlide 6 Status and Plans for TG3 Construction of Initial Draft Goal: MAC/PHY standard of high rate WPAN Schedule Goal: Produce a Standard by 1H 2002 Next Steps Goal: Resolve comments/issues with current task group draft (D08), November, 2001. Working Group draft, November (D09), 2001. Sponsor ballot, January (D10), 2001.

7 doc.: IEEE 802.15-01/464r0 Submission November, 2001 John Barr, MotorolaSlide 7 Recent Work Goal: Release draft (D08) incorporating updates from conference call and ad hoc (2) meeting and identify outstanding issues and work to be completed. Ad Hoc meeting in Schaumburg August 28-29 Ad Hoc meeting Rolling Meadows October 9-11 Twice (+) weekly conference calls to resolve issues captured in 01/374r8

8 doc.: IEEE 802.15-01/464r0 Submission November, 2001 John Barr, MotorolaSlide 8 Key November Sessions (01/453r3) Monday: Vote on approval of D08. UWB Study Group presentation. QoS resolution Monday evening. Tuesday: Outstanding issue resolution. Complete UWB study group proposal. Security clause issue resolution and drafting Tuesday evening. Wednesday: Resolution of issues, drafting, review of proposed amendments, PICS and SDL requirements. Vote on UWB study group at 802.15 working group meeting. Thursday : Vote on Draft amendments, vote on baseline draft. (10:30 AM). Thursday: Complete D09 draft, committee reports, update project plan, November-January work plan, prepare letter ballot, and WG report.


Download ppt "Doc.: IEEE 802.15-01/464r0 Submission November, 2001 John Barr, MotorolaSlide 1 Project: IEEE 802.15 Working Group for Wireless Personal Area Networks."

Similar presentations


Ads by Google