Presentation is loading. Please wait.

Presentation is loading. Please wait.

Research Data Management For Researchers

Similar presentations


Presentation on theme: "Research Data Management For Researchers"— Presentation transcript:

1 Research Data Management For Researchers
Dr Joanna Goodger Information Hertfordshire With Bill Worthington, Sara Hajnassiri, and Mohamed Hansraj

2 Research Data Management
an introduction

3 Research Data Management Research Councils
The majority of data is funded by the Government through Research Councils and Universities. There are seven Research Councils, each covering a broad disciplinary area. Research Councils UK (RCUK) is a strategic partnership between the Councils, enabling them to work together and enhance the overall performance and impact of UK research. Each council operates through grant programmes and some run their own research institutes and data centres. The requirements laid down by the research councils cover various aspects of the research life cycle. Planning Research Data Management

4 Planning Research Data Management
This table shows the state of data policies in Included are details regarding the preservation, deposit and sharing of research data. Planning Research Data Management

5 Research Data Management Research Councils
ESRC and BBSRC are leading development of Research Data Management Plans within their funding process as well as in their policies: All RCs fund at least one dedicated data centre Researchers are required to offer to deposit their data in a data centre, to deposit it locally and make it available to others. During funding, researchers need to include a data review and a data sharing plan. Funding can be sought for sharing resources, for buying existing data, and commissioning new data. Time limits are set for deposition and retention periods. Secondary users must acknowledge their data sources. Planning Research Data Management

6 Research Data Management UH Policy
In response to these government policy changes, UH has reviewed its data policy UPR12. The University of Hertfordshire’s research data policy states; The University owns data generated by its research; it expects data to be managed and shared in a robust and professional manner; and it places the responsibility for proper research data management with the Principal Investigator. The University’s data policy also has the following clauses from the main policy; 4.2 The University recognises the value of data as an institutional resource and considers that value to be increased through the widespread and appropriate use of data and by virtue of data quality. 4.3 The University considers the value of data to be diminished through misuse, misinterpretation, or unnecessary access restrictions. While this might imply a proprietary or protectionist tone to the University’s data policy, this is not the case. The University’s data policy also has the following clauses from the main policy section that counter this impression: Planning Research Data Management

7 A data management plan is required as part of the funding application
Research Data Management What this means to Researchers The changes to RCUK and to UH data policies means that we are now required to think about preserving and reusing our data from the funding stages of the project. A data management plan is required as part of the funding application Once published, data should be anonymised and preserved in open access repositories, preferably RCUK data centres. Planning Research Data Management

8 Why you should but maybe can’t share your data?
Research Data Management Activity Why you should but maybe can’t share your data? Spend a couple of minutes thinking about the benefits of sharing your data, having other data available for you, and what you might not be able to share. Then we’ll combine your answers and see if we can resolve the issues. Planning Research Data Management

9 Research Data Management Benefits to Researchers
More data is available for contrast and comparison More opportunities for collaboration as data is discovered Credit awarded on data as well as related publications Data preserved in managed archives Data is not lost when researchers leave research Student project data are managed assisting audit and reuse Planning Research Data Management

10 Research Data Management
Planning your Project

11 https://dmponline.dcc.ac.uk/
Research Data Management Research Data Plan The University of Hertfordshire and many funding bodies want assurance that you have systems and protocols in place to protect your data during the working, sharing, and preserving stages of your project. They require a Research Data Management Plan. Sometimes this is incorporated into the electronic grant application process e.g. Je-system. Others, like UH require you to complete a DMPonline Template. One of the trickiest aspects of research is assuring that your data is BACKED UP, but also that it is SECURE whilst being EASILY SHARED with collaborators. In many research disciplines, data is in the form of CONFIDENTIAL PERSONAL INFORMATION, which may include medical data, proprietary data, or data which is patent pending, all of which requires careful management and high levels of SECURITY. Planning Research Data Management

12 Research Data Management Research Data Plan
To assist in preparation of basic Data Management Plans (DMP) at the funding application stage, the DCC presents DMPonline. These templates are designed to make researchers think about our projects and how to manage the data throughout the whole project life cycle. This is another option for an Overview slide. Planning Research Data Management

13 Research Data Management Research Data Plan
Collection of new and existing data Local storage and analysis Sharing with collaborators Publishing Preservation and reuse The DMP covers the whole project lifecycle. The plan is divided into 6 sections, which cover the lifecycle but are divided into aspects of the project, not chronological steps. Which software to use and what formats to keep your data in; How to organise, store and keep your data safe; What to include in the consent agreements you negotiate. What happens to your data when you’ve published? Planning Research Data Management

14 What happens to your data during a project?
Research Data Management Activity What happens to your data during a project? The where, when, how, what, and why of your data. Spend a couple of minutes thinking about the choices you need to make about your data, throughout your project. Then we’ll combine your ideas and compare them to the DMP. Planning Research Data Management

15 Research Data Management Research Data Plan
Introduction and context Data types, formats, standards, and capture methods Legal and ethical issues Short-term storage and data management Access, data sharing and re-use Deposit and long-term preservation What will the audience be able to do after this training is complete? Briefly describe each objective how the audience will benefit from this presentation. Planning Research Data Management

16 Research Data Management Research Data Plan
Once you have received funding, you will be allocated an R1 number. At this point you should complete the UH Template, 29% of which is contextual information that is not required by you funder as it is part of a larger application export your UH DMP as pdf this document to from your herts account setting the subject as ‘R1 number – PI surname’. Your DMP is stored in the Document Management System (DMS) in a secure area. This DMP can be updated at any point using the same subject. The DMS maintains previous editions automatically. This is another option for an Overview slide. Planning Research Data Management

17 Research Data Management
Project lifecycle

18 Roles and Responsibilities
Research Data Management Introduction and context Thesis Title UH or Research Council? Duration Basic Project Info. UH and STFC policies: open after publication as your research is public funded through UH & RCUK Related Policies Yours and your supervisory team Additional help from IT staff, HelpDesk and other team members Roles and Responsibilities Planning Research Data Management

19 Research Data Management Introduction and context
UH Template Questions Short description of the project’s fundamental aims and purpose Funding body requirements relating to the creation of data Institutional or research group guidelines Other policy-related dependencies Date of creation Aims and purpose of this plan Target audience for this plan Does this version supersede an earlier plan? Contact details and expertise of nominated data managers /named individuals Glossary of terms This document needs to be in context. In cases where the DMP is included in the funding application, much of the contextual information is elsewhere. However, UH requires a stand-alone document so the aims, funding and policy obligations, and contact information are the first section of the UH template. Planning Research Data Management

20 Research Data Management Data types, formats, standards and capture methods
What data will be created? Note the type and volume of data that will be created e.g. transcripts, measurements, imaging etc. Explain how you will capture the data. e.g. in a numbered, dated notebook. What formats do you propose to use and why? e.g. Microsoft Access, Excel or SPSS, as they’re in widespread use. DICE DMP Breakdown Planning Research Data Management

21 What is data? Research Data Management Activity
What does data mean to you? Spend a couple of minutes thinking about what data you will be working with, throughout your project. Then we’ll combine your ideas and compare them to the DMP. Planning Research Data Management

22 Project Desc. and process
Research Data Management Data types, formats, standards and capture methods Basic description for context Define data Software, Documents, Formats Project Desc. and process Archival data, Catalogues, New obs. Proprietary? Project only for 6mth Existing and New Data Headers: table column headings, image information, paper reference, software version. Metadata Planning Research Data Management

23 Research Data Management Data types, formats, standards and capture methods
UH Template Questions Give a short overview description of the data being generated or reused in this research How will you manage integration between the data being gathered during the project and pre-exiting data source? How will you capture or create new data? Which file formats will you use and why? What directory and file naming convention will you use? Are there any tools or software needed to create/process/visualise these data? Are there appropriate computing hardware, facilities, and resources to manage, store, and analyse these data? Are the datasets which you will be capturing/creating self-explanatory, or understandable in isolation? Planning Research Data Management

24 Research Data Management Data types and formats
Images / Photos Code Plots Tables Audio-Visual Transcripts Planning Research Data Management

25 Images Tables Source code Interviews
Research Data Management Data types and formats Formats Uses Considerations Images Raw, Processed, Plotted, Photos, Scans, CAD FITS, JPG, PNG, BMP, PS Reuse, paper, talk, poster, archive, web Use, size, longevity Tables Catalogues, Query results, Calculations, Measurements Text files, FITS, spread sheets Code input, spectra, plot, paper, CDS Use, metadata, accessibility Source code Models, simulations, scripts, inputs, outputs, instructions .c, .pl, .py, .idl, README, Make file, input, output Third party edit, run. paper, web User friendly; functions, size Interviews Audio, Video, Written Transcript .txt, .odt, .doc., mp3, .mp4, .avi Producing transcripts, further analysis Format, longevity, security, metadata Planning Research Data Management

26 Research Data Management Data metadata
How will the data be documented and described? What contextual details are needed? e.g. a description of the capture methods and data analysis. How will you capture this? e.g. in papers, in a database, in a ‘readme’ text file, in file properties/headers. Which standards will you use and why? e.g. refer to data centre recommendations for metadata, controlled vocabularies, documentation. Are there any encoding guidelines you should follow? DICE DMP Breakdown Planning Research Data Management

27 Research Data Management Data metadata
UH Template Questions What contextual details are needed to make the data you capture or collect meaningful? How will you create or capture these metadata? What form will the metadata take? Why have you chosen particular standards and approaches for metadata and contextual documentation? This document needs to be in context. In cases where the DMP is included in the funding application, much of the contextual information is elsewhere. However, UH requires a stand-alone document so the aims, funding and policy obligations, and contact information are the first section of the UH template. Planning Research Data Management

28 Research Data Management Legal and ethical issues
How you will manage ethics and intellectual property? How will you safeguard the privacy of research participants? e.g. by negotiating informed consent. Will there be any restrictions and why? e.g. delays while you seek a patent, embargoes as right of first use. DICE DMP Breakdown Planning Research Data Management

29 Legal Issues Ethics Research Data Management Legal and ethical issues
Do you have copyright issues? Is there a patent pending on your work? Is the data personal? Legal Issues Who owns your data? UH? STFC? Third party company? How will the data be licenced? How will you deal with disputes? Ethics Planning Research Data Management

30 Research Data Management Legal and ethical issues
UH Template Questions Are there ethical and privacy issues that may prohibit sharing some or all of the data? How may they be resolved? Is the data that you capture / create ‘personal data’ in terms of the Data Protection Act (1998) or equivalent legislation if outside the UK? What action have you taken to comply with your obligation under the Data Protection Act (1998) or equivalent legislation if outside the UK? Will the data be covered by copyright or the Database Right? Give details. Who owns the copyright and other intellectual property? How will the database be licensed? This document needs to be in context. In cases where the DMP is included in the funding application, much of the contextual information is elsewhere. However, UH requires a stand-alone document so the aims, funding and policy obligations, and contact information are the first section of the UH template. Planning Research Data Management

31 Research Data Management Legal and ethical issues
How will you manage your data? How will you store and back-up the data?  e.g. University storage with IT back-up, mirror data on partner's server. DICE DMP Breakdown Planning Research Data Management

32 How is your data at risk? Research Data Management Activity
What precautions do you have in place to safeguard your data? Spend a couple of minutes thinking about how your data could be lost, damaged or stolen? Then we’ll combine your ideas and compare them to the DMP. Planning Research Data Management

33 Storage Back-up Security
Research Data Management Short-term storage and data management Where will your data be stored? How will it be transmitted? Storage Where will you back-up? Who will do it? And how often? Back-up Keeping sensitive data private Safe from loss or theft Security Planning Research Data Management

34 Research Data Management Short-term storage and data management
Cluster laptop External HD DVD, Tape UH PC UH server Networked drives U: and X: local drive 5G Planning Research Data Management

35 DMS Research Drives Zend.To Research Data Management Sharing
Access only to UH members Versioning OS independent Set file structure DMS Undefined file structure No versioning Research Drives Send large files using the UH server Web based only Open and Free Zend.To Safeguarding data with Research Data Management

36 Research Data Management Short-term storage and data management
Backing up should be an automatic part of your everyday research activities. In 2005, an electrical fault in the electronics and laser research building at the University of Southampton cost £50-100M including temporary building hire and transfer of work to Holland. Image if a fire or similar disaster happened at UH How much would it cost you‽   Storing your data on the UH network means that it is stored at de Havilland and at college lane. Mountbatten Building, So’ton Uni. Planning Research Data Management

37 Research Data Management Short-term storage and data management
Updates the changes to files between two directories and servers rsync Timed schedule to perform tasks – your rsync for example crontab /usr/bin/rsync -avu /data/jgoodger/ /local/data/ /usr/bin/rsync [options] [src] [dest] SHELL=/bin/tcsh PATH=/sbin:/bin:/usr/sbin:/usr/bin 17 3 * * * /bin//usr/bin/rsync -avu /data/auser/ /local/data/ Planning Research Data Management

38 Mac Time machine Windows Backup and restore
Research Data Management Short-term storage and data management Set an automated backup through control panel Windows Backup and restore Back up your entire content to another disk or to the net. Mac Time machine Planning Research Data Management

39 Research Data Management Short-term storage and data management
Most data needs some level of security: Sensitive Personal Information Proprietary data New discoveries Revolutionary code / software All of it needs to be accessible, but secure during storing, sharing, and publishing. If you lost it, who would be able to access your data? Planning Research Data Management

40 Research Data Management Short-term storage and data management
Keep your data secure in an encrypted folder Bitlocker is available on Windows 7 +, Truecrypt works on any operating system. Open Source Encryption that works with Windows, Mac and Linux Pack your files into an encrypted volume Send by , shared drive, cloud storage, web space Password access Variable encryption algorithms available Planning Research Data Management

41 Research Data Management Short-term storage and data management
UH Template Questions What is the ballpark size of the data being collected / created? Where physically will you store the data during the project’s lifetime? What media will you use for primary storage during the project’s lifetime? What software will be used in storing and processing these data? How will you backup the data during the project’s lifetime? How regularly will backups be made? Who is responsible for backups? How will you manage access restrictions and data security during the project’s lifetime? Planning Research Data Management

42 Research Data Management Data sharing and access
What are the plans for data sharing and access? Who is expected to use the completed dataset(s) and for what purpose? How will the data be developed with future users in mind? e.g. choose appropriate formats. How will you make the data available? e.g. deposit in a data centre, forward copies on request, create website, publish a book. DICE DMP Breakdown Planning Research Data Management

43 What happens when you’re finished?
Research Data Management Activity What happens when you’re finished? After you’ve published, what happens to your data? Spend a couple of minutes thinking about where your data should be stored, who should have access, and what would happen if something happened to you? Then we’ll combine your ideas and compare them to the DMP. Planning Research Data Management

44 Data sharing and Reuse Access to Data Timing
Research Data Management Data sharing and access Who else wants your data? Why might they not have it? Data sharing and Reuse How and when will you release your data. Project timetable Access to Data Limits on pub dates? Special Journal or Conference Publication Embargo or Patent Pending? Timing Planning Research Data Management

45 Research Data Management Data sharing and access
UH Template Questions Which groups or organisations are likely to be interested in the data that you will create / capture? How do you anticipate your new data being reused? Are you under obligation or do you have plans to share all or part of the data that you create / capture? If not, why will you not share you data? If you can, how and when will you make the data available? What is the process for gaining access to the data? Will access be chargeable? Does the original data collector / creator / PI, retain the right to use the data before opening it up to wider use? Give details. Are there any embargo periods for political / commercial / patent reasons? Give details. How will you implement permission, restrictions, and embargoes? Planning Research Data Management

46 Research Data Management Deposit and long-term preservation
What is the strategy for long-term preservation and sustainability? What are the plans for sustainability? e.g. choose open standards, deposit in data centre. Which repository / data centre have you identified as a place to deposit data? Show you've consulted them. How will you prepare data for preservation and sharing? Show time and resource budgeted in. DICE DMP Breakdown Planning Research Data Management

47 Selection Location and Schedule Metadata
Research Data Management Deposit and long-term preservation Which data will be kept / made public? Which tools are independently valuable? How will sensitive data by managed? Selection Where will your data be published? In a national or subject specific archive? At UH? How long should the data be kept? Location and Schedule What metadata and documents will also be archived? How will this data be created? Metadata Planning Research Data Management

48 Research Data Management Deposit and long-term preservation
All Data Paper Journal Archive (ArXiv) UHRA Supporting Data National Archive Working Data Publication Archiving Currently, selection, methods, algorithms, results, plots, and conclusions are in papers, published in journals and open archived in the ArXiv. In the future you’ll need to select supporting data, including material with independent scientific merit for publication online in open access archives; either subject specific or in the UHRA. Planning Research Data Management

49 Research Data Management Deposit and long-term preservation
What is kept depends on the decisions made by the government, RCUK and the journals. Probably supporting material and data that has scientific merit, but could be all of it. Be prepared! Keep clear and useful notes on your work; Annotate your code so others (including your future self) can make sense of it Keep a README of instructions for reduction, analysis or code procedures Clearly name the published results – isolate them in or copy them to a directory Version control your codes, results, plots and drafts so you can compare at least Make a note of results/conclusions of dead ends Planning Research Data Management

50 Research Data Management Deposit and long-term preservation
UH Template Questions What is the long-term strategy for maintaining, curating, and archiving these data? On what basis will data be selected for the long-term preservation? Will or should data be kept beyond the life of the project? How long will or should these data be kept beyond the life of the project? Which archive / repository / central database / data centre have you identified as a place to deposit data? How will you manage sensitive data over the longer term? What metadata / documentation will be submitted alongside the datasets or created on deposit / transformation in order to make the data re-useable? How will this metadata / documentation be created, and by whom? Will you include links to published materials and/or outcomes? Give details. How will you address the issue of persistent citation? Planning Research Data Management


Download ppt "Research Data Management For Researchers"

Similar presentations


Ads by Google