1 New Solid Waste Management System in Lahore (Technical Aspects)

2 Contents of Presentation
Vision Behind New SWM System in Lahore Formation of Lahore Waste Management Company (LWMC) Why was Company needed? Transition from old to new SWM System Other Initiatives & Way Forward

3 Vision Behind New SWM System
To modernize the SWM system in Lahore To transform Lahore into one of the cleanest cities of the world

4 Impediments Lack of institutional capacity Faulty outsourcing model
Financial constraints

5 Reasons for the Change

6 Formation of Company CM Punjab envisaged establishment of a company on the basis of Turkish model. LWMC established on March 19, under section 42 of the Companies Ordinance 1984.

7 Signing of the Services and Asset Management Agreement
Services And Asset Management Agreement (SAAMA) signed on June 25, 2011 Assets, resources and functions were transferred to LWMC Residual functions like; Enforcement, regulation and levy of tax

8 Strategic Direction of LWMC

9 Agreement with M/s. ISTAC
Agreement signed on 27th December for technical support; Waste characterization study Capacity building of professionals Identification and designing of integrated waste disposal facility Designing of new waste management system

10 Design of New System Turkish experts of ISTAC identified the gaps in the existing system New system was designed to outsource SWM services to international companies

11 International Bidding
Competitive and transparent bidding process adopted Tenders floated in Financial Times and Gulf News Contractors selected after detailed technical and financial evaluations

12 Turkish Companies The contract was signed on 3rd November, 2011 for a duration of 07 years with two Turkish companies namely; M/s Al-Bayark in Zone I. M/s OzPak in Zone II.

13 Zoning of Lahore

14 Transition from Old to Modern Solid Waste Management System

15 Current System – Street Sweeping
Poor quality of sweeping Inadequate & obsolete equipments No health & safety gadgets

16 New System – Street Sweeping
Improved quality of sweeping Improved design of tools and equipments Proper health & safety gadgets and uniforms for workers

17 Current System – Mechanical Sweeping
Obsolete & inefficient technology High emissions of dust Inadequate coverage Poor quality of sweeping

18 New System – Mechanical Sweeping
Modern, efficient technology Less / no dust emissions Coverage of all main roads of Lahore Better sweeping quality

19 Current System – Waste Storage
Littering & open heaps in the absence of door to door collection Inadequate and improper storage equipments Open storage of waste

20 New System – Waste Storage
Introduction of door to door collection through bags Installation of adequate number of new type of containers & waste bins

21 Current System – Waste Transportation
Open waste transportation More than 20 years old machinery Inefficient waste transportation fleet Lack of fleet monitoring

22 New System – Waste Transportation
No littering during transportation New, modern & efficient vehicles Fleet monitoring through advanced technologies

23 Current System – Washing
No specialized vehicles for washing Manual drainage after washing Rare washing of squares/ walkways

24 New System – Washing Specialized washing vehicles with high pressure
Very less drainage effort Regular washing of major squares / walkways

25 Role of Citizens in New SWM System
Follow the waste schedules / timings Do not throw unwanted materials (acid, cigarettes etc) in containers Volunteer for protection of containers of your area from fire and stealing

26 Other Initiatives & Way Forward

27 Sale of Waste to Private Sector
Agreement of sale of waste to private sector; DG Khan Cement PNO Waste Management Expected Technologies include : Segregation, composting or energy from landfill Gas, anaerobic digestion or RDF

28 Development of Model Areas
Local Area Office for complaint redressal Waste collection in commercial areas Special arrangements after rains and storms

29 Integrated Landfill Facility
Establishment of integrated landfill facility Site identified Geo technical investigations conducted NOC from EPD issued Land procurement in process

30 Removal of Waste from Open Plots
Removal of waste from over open plots Resolution of complaints from ECRS (1318), Dengue surveillance committee (200) Special Branch

31 Establishment of waste transfer stations at suitable locations
Establishment and outsourcing of integrated waste disposal facility

32 Development of systems in consultation with ISTAC for :
Hospital Industrial Construction & Demolition waste

33 Development of a proper legal framework for SWM System
Integration of DHAs and Cantonments Revenue generation through waste streams

34 DOCUMENTRY ON NEW SOLID WASTE MANAGEMENT SYSTEM IN LAHORE
Video

35 THANK YOU