Presentation is loading. Please wait.

Presentation is loading. Please wait.

Fall Technical Conference Regional Haze SIP Development Snowbird, Utah September 17 - 19, 2002.

Similar presentations


Presentation on theme: "Fall Technical Conference Regional Haze SIP Development Snowbird, Utah September 17 - 19, 2002."— Presentation transcript:

1 Fall Technical Conference Regional Haze SIP Development Snowbird, Utah September 17 - 19, 2002

2 PLANNING COMMITTEE Survey to Evaluate Resources Necessary to Develop a Regional Haze Control Plan Bob Habeck Montana DEQ

3 PURPOSE OF SURVEY “To Determine State Resources Needed to Prepare, Review, Approve, and Implement Regional Haze Visibility Control Plans 1.” 1 Source: November 7, 2001 letter to EPA Assistant Administrator Jeff Holmstead. WESTAR committed to preparing a report addressing this topic.

4 SURVEY RATIONALE Results will be used by states in deciding between 308 and 309 strategies. Results will be use when working with EPA on SIP preparation, funding, and implementation issues. Results will be useful to WRAP committees to assist in prioritizing products that states are depending upon for SIP development.

5 SURVEY DESIGN Survey was developed by ad hoc work group. Survey sent to states on 7/2 - returned 8/12. Identified SIP Development into phases: Phase I. – Project Planning Phase II. – SIP Development Phase III. – State/Local Adoption Phase IV. – SIP Approval Phase V. – Implementation

6 SURVEY RESPONSE To date, received responses from 14 states. Preliminary data has been compiled and was distributed to Air Directors on 9-13-02 for initial review. NOTE: Preliminary data has not been through QA/QC procedures and will change.

7 GENERAL TRENDS High variability among states and strategies. High dependence upon WRAP products. State resource demands are greatest during SIP Development - Phase II and lowest during SIP Approval - Phase IV. 308 strategy indicated more resource demands than 309 strategy for SIP Development. 308 and 309 Project Planning - Phase I have comparable resource demands.

8 NEXT STEPS Planning Committee ad hoc workgroup to conduct follow-up QA/QC with states to provide response consistency. Planning Committee to review & discuss draft survey results for adequacy, consistency, and final report format. Produce draft survey report by January 2003. * DISCUSSION OF REPORT CONTENT *

9 POSSIBLE REPORT CONTENT Possible explanation of variability in responses within and between states and strategies. Possible introduction of ‘complexity classes’ to adequately compare states. Possible plots of work week by timelines to illustrate when resources are needed: (1) by state, (2) by EPA Region, and/or by WESTAR states and strategy. SEE EXAMPLE NEXT SLIDE

10 POSSIBLE REPORT CONTENT (continued)

11 DISCUSSION QUESTIONS: What Content Needs to be in the Final Survey Report for Your use? How Best to Present Raw Data in the Final Survey Report for Your use? Other Questions / Comments for a Usable Final Survey Report? * END OF SLIDES *


Download ppt "Fall Technical Conference Regional Haze SIP Development Snowbird, Utah September 17 - 19, 2002."

Similar presentations


Ads by Google