1 Hanford Status Slides

2 Cask/Transportation System Fabrication of Casks complete (5 total) Delivery of 3 (of 5) trailers complete MCO Loading System (MLS) shuttle fabrication complete and delivered for K West and K East MLS factory acceptance testing complete for K West and K East Above: Cask and Trailer Below: MCO Loading System

3 Cask/Transportation System Fabrication of Casks complete (5 total) Delivery of 3 (of 5) trailers complete MCO Loading System (MLS) shuttle fabrication complete and delivered for K West and K East MLS factory acceptance testing complete for K West and K East Above: Cask and Trailer Below: MCO Loading System

4 Canister Storage Building (CSB) Above: Aerial view of the Canister Storage Building in the 200 East Area. Below: Inside the Canister Storage building. Subproject 82% complete Building construction complete Startup testing in progress on 13 of 13 facility systems Completed installation of major MHM components MCO handling machine and storage tube installation resumes in FY99