Presentation is loading. Please wait.

Presentation is loading. Please wait.

University of Montenegro Faculty of Electrical Engineering Work Package 7 Review of the project activities and objectives Fostering innovation based research.

Similar presentations


Presentation on theme: "University of Montenegro Faculty of Electrical Engineering Work Package 7 Review of the project activities and objectives Fostering innovation based research."— Presentation transcript:

1 University of Montenegro Faculty of Electrical Engineering Work Package 7 Review of the project activities and objectives Fostering innovation based research for e-Montenegro

2  WP7 – Panel Expert Review  Start month: 36 – June 2016  End month: 42 – December 2016  Type of activity: Support activities  WP leader: Assoc. Prof. Miloš Daković, PhD Fostering innovation based research for e-Montenegro 2

3  Assess the excellence of University of Montenegro (Faculty of Electrical Engineering)  Validate the Fore-Mont achievements › increase in the research potential › synergy between the three groups  Preserve excellence and after-project life  Explore contribution to the development of Montenegro. Fostering innovation based research for e-Montenegro 3

4  Task 7.1: Sending all relevant data and information to the European Commission  Task 7.2: Evaluation of the strategy  Task 7.3: Presentation of the report to the Advisory Board and Local authorities Fostering innovation based research for e-Montenegro 4

5  D7.1 – Consolidated report on the sustainable research development strategy of UoM (FEE) [month 41 – November 2016]  D7.2 – Draft for the future strategy of UoM (FEE) [month 42 – December 2016]  MS8 – FEE’s current excellence is assessed and future performance anticipated Fostering innovation based research for e-Montenegro 5

6  Gather relevant data about individual groups and FEE › Research (publications)  quantity – number of publications  quality – citations as measure of publication quality  h-index – can be calculated for researcher, group or whole team › Openness (mobility, collaborations...) › Visibility (web site) › Equipment Fostering innovation based research for e-Montenegro 6

7  Data sources › publication databases › individual groups and project web site › web ranking tools  Implementation of relevant data into web portal (developed under WP5, Task 5.1) › publications overview and statistics › collaborative research Fostering innovation based research for e-Montenegro 7

8 Thank you Fostering innovation based research for e-Montenegro 8


Download ppt "University of Montenegro Faculty of Electrical Engineering Work Package 7 Review of the project activities and objectives Fostering innovation based research."

Similar presentations


Ads by Google