INTRODUCTION Mr. Benjamin W. Lawless NGB/A7O Chief, Operations Division Installations and Mission Support Directorate.

Similar presentations


Presentation on theme: "INTRODUCTION Mr. Benjamin W. Lawless NGB/A7O Chief, Operations Division Installations and Mission Support Directorate."— Presentation transcript:

1 INTRODUCTION Mr. Benjamin W. Lawless NGB/A7O Chief, Operations Division Installations and Mission Support Directorate

2 Guarding America - Defending Freedom 2 Air National Guard Installation Locations

3 ANG PHYSICAL PLANT Guarding America - Defending Freedom 3 ANG Size and Composition 1,144 Aircraft 107,724+ People $13.1B Inventory Plant Value 88 Flying Locations 4 Combat Readiness Training Centers 1,604 Support Units 2 ANG Bases 65 Civilian Airports 12 AF Bases 1 Naval Air Station 5 Air Reserve Bases 1 NASA Facility 2 ANG Stations Footnotes: Located in all 50 states, 3 territories and District of Columbia 177 locations total Most land leased to the AF and licensed to the State People excludes Federally funded State employees

4 Guarding America - Defending Freedom 4 ANG MILCON – FY2010 POM As enacted FY10 POM FYDP - $550M

5 Guarding America - Defending Freedom 5 Sustainment, Restoration & Modernization Program

6 Guarding America - Defending Freedom 6 FY09 – SRM $325M ($25M Stimulus) – MILCON PB $21.8M (4 Projects) – MILCON ADDS $221M (29 Projects) – BRAC $131M (30 Projects) – FY 09 Stimulus $50M (10 projects) MILCON TOTAL $423.8M FY10 – SRM~$300M – MILCON ~$380M ANG Milcon and SRM Programs

7 Guarding America - Defending Freedom 7 Methods of Design Execution – Base/State level IDIQ A-E Contracts Most SRM projects Some Milcon projects – NGB National A-E IDIQ Contracts Some Large / Technical SRM projects Most Milcon projects – Other Contracts (COE, AFCESE, etc.) ANG Design Execution

8 Guarding America - Defending Freedom 8 Methods of Construction Execution – United States Property and Fiscal Officer by State SB Set Aside Contracts State MATOC IFB RFP (Source Selection) – Other Contracts (COE, AFCEEE, etc.) ANG Milcon and SRM Execution

9 Sustainable Design and Construction Guarding America - Defending Freedom 9 ANG MILCON and Major SRM projects USGBC registration required LEED Silver recognition goal

10 Sustainable Design and Construction Guarding America - Defending Freedom 10

11 Energy Conservation Guarding America - Defending Freedom 11 Energy Policy Act of 2005 (EPAct 05) – 30% consumption improvement over baseline – as LCC effective – Requires advanced building energy modeling Energy Independence and Security Act (EISA 07) – 30% minimum domestic hot water generated by solar systems – as LCC effective

12 Energy Conservation Guarding America - Defending Freedom 12 Examples of new facilities which will exceed 30% reduction in consumption over baseline

13 Renewable Energy Guarding America - Defending Freedom 13

14 Flexible and Open Floor Plans Guarding America - Defending Freedom 14

15 Martinsburg WVa C-5 Bed Down Guarding America - Defending Freedom 15

16 Memphis TN C-5 Bed Down Guarding America - Defending Freedom 16

17 Air Force Design Awards Guarding America - Defending Freedom 17

18 Air Force Design Awards Guarding America - Defending Freedom 18

19 Questions ? 19