HERWG Updates - 03-11-2011 Reporting Status Agencies Registered to date = 44 Update Received for today meeting Agencies = 02 Last update compiled – July.

Similar presentations


Presentation on theme: "HERWG Updates - 03-11-2011 Reporting Status Agencies Registered to date = 44 Update Received for today meeting Agencies = 02 Last update compiled – July."— Presentation transcript:

1 HERWG Updates - 03-11-2011 Reporting Status Agencies Registered to date = 44 Update Received for today meeting Agencies = 02 Last update compiled – July 2011

2 HERWG – National Summary Estimated Damage Houses (Flood 2010) – 670,580 (0.6 millions) – NDMA/PDMA One Room Shelter (committed /Planned) – 181,981 (0.1 Millions) – HERWG Following not included in counting Self Recovery estimation Houses damage - Flood 2011(Sindh/Balochistan) EDH – Estimated Damage Houses ORS = One Room Shelter

3 HERWG – By District ORS Completed = 48,629 (21% of total)

4 HERWG – ORS Overall Status (work In Progress)

5 HERWG – By Organization

6 HERWG – UN-HABITAT

7 Adobe Brick Shelter MATERIAL PRICES IN FLOOD AFFECTED AREAS Compiled by Shelter Cluster Technical Manager Baber Tanveer All prices in PKR % age SR# ITEM DESCRIPTION SIZEQTYUNITSKPKS.SindhN.SindhPunjabBlochistan Remarks 1 Fired Bricks 4.5"x3"x9"3216No.0-19-2608 2 Sun Dried Bricks(Adobe Bricks) 4.5"x3"x9"6636No.00-10000 3 Solid Concrete Blocks 6"x8"x12"0No.70-5000 5 Deformed Steel Bars (40,000 Psi) #20Kg3038 #30Kg3038 #40Kg3038 6 Sand Cuft?20cft5-4625036 7 Crush (Gravel) -12cft32110-2750 8 Portland Cement (Best Way) -5.25bag769147 9 Lime(20 KG) -1bag11632033-4 10 Steel Girders 4"x8" approx. 16 ft long 2 kg/rft2No.011 43 Bamboos 20 ft long with uniform thickness 2" dia0No.740 1325 3" dia10No.1033 020 12 Reeds(Sirki) (10' x 20')0No.041330 Chattai (Bundle of dry grass 10 Pcs) -5No.1512 0-25 14 Door (Wood) 3.5ft x 6ft1No.720 85 Door (Steel) 3.5ft x 6ft0No.00000 16 Window (Wood) 4ft x 3ft1No.251110 12 Window (Steel) 4ft x 3ft0No.00000 17 Lintel Beam. Wooden (3ich thick+5" wide) 5ft long1No.210-3107 18 Plastic Sheet 4mx 5 m1No.202240 19 Nails 2 inch1Kg54490 3 inch1Kg5445-4 20 Skilled Labor per day6MD17000-14 21 Unskilled Labor per day per day10MD170000 169.6215599187.7959418-18.8387774989.56695142154.289686 Note: (-) sign showing that the price is decreasing Material Price Analysis of All Provinces IncreasingDecreasing