Training on “CMMI for Development – ver 1.2”

Similar presentations


Presentation on theme: "Training on “CMMI for Development – ver 1.2”"— Presentation transcript:

1 Training on “CMMI for Development – ver 1.2”
Effective: November 01, 2007

2 Training Overview Title of the training program
Training on CMMI for Development – ver 1.2 Training material Available in Web Qualify Duration 04:00 Hours Type of training Instructor led class room training Question & answer session at the end of the session Feedback by participants at the end of the session

3 Course Content What is CMMI? CMMI process area components
Integrated Product and Process Development (IPPD) Addition Maturity levels – staged representation Process areas – staged representation Process area categories Process areas – category wise Engineering PAs Project management PAs Support PAs Process PAs CMMI assessment roadmap Role of project teams Process implementation indicator document

4 C M Capability Maturity Model Integration M I What is CMMI?
CMMI for Development is a reference model that covers the development and maintenance activities applied to both products and services. The CMMI for Development constellation consists of two models: CMMI for Development +IPPD and CMMI for Development (without IPPD).

5 CMMI Process Area Components

6 Integrated Product and Process Development (IPPD) Addition
Model provides option for implementing CMMI for development with or without IPPD addition. IPPD is a systematic approach that achieves a timely collaboration of relevant stakeholders throughout the life of the product to better satisfy customer needs, expectations, and requirements. Stakeholders represent not just the technical expertise for product and process development, but also the business implications of product and process development. Mahindra Satyam is implementing CMMI with IPPD addition

7 Maturity Levels Levels Optimizing Quantitatively Managed
Focus on continuous improvement 5 Optimizing Process measured and controlled 4 Quantitatively Managed Process characterized for the Organization and is proactive 3 Defined Process Characterized for projects and is often reactive 2 Managed Process unpredictable, poorly controlled and reactive Initial 1

8 Process Areas - Maturity Level Wise
Requirements Management Project Planning Project Monitoring and Control Measurement and Analysis Configuration Management Process and Product Quality Assurance Supplier Agreement Management Requirements Development Technical Solution Product Integration Validation Verification Risk Management Integrated Project Management +IPPD Decision Analysis and Resolution Organizational Process Definition +IPPD Organizational Process Focus Organizational Training Quantitative Project Management Organizational Process Performance Organizational Innovation and Deployment Causal Analysis and Resolution

9 Process Area Categories
Engineering Project Management Support Process

10 Process Areas – Category Wise
Engineering Project Management Requirements Management Requirements Development Technical Solution Product Integration Verification Validation Project Planning Risk Management Integrated Project Management +IPPD Project Monitoring and Control Quantitative Project Management Supplier Agreement Management Support Process Configuration Management Measurement and Analysis Process and Product Quality Assurance Decision Analysis and Resolution Causal Analysis and Resolution Organizational Process Definition +IPPD Organizational Process Focus Organizational Training Organizational Process Performance Organizational Innovation and Deployment

11 Engineering PAs Requirements Management Requirements Development
Technical Solution Product Integration Verification Validation

12 Requirements Management
Requirements Management, a Level 2 Process Area, addresses the process needs for obtaining the project requirements and executing the project based on them. The requirements form the basis for project planning and project monitoring activities and Acceptance criteria as well.

13 Requirements Development
Requirements Development, a Level 3 Process Area, addresses the process needs for deriving functional and non-functional requirements and forms the basis for the Design.

14 Technical Solution Technical Solution is a Level 3 Process Area is to design, develop, and implement solutions to requirements. Solutions, designs, and implementations encompass products, product components, and product-related lifecycle processes.

15 Product Integration Product Integration, a level 3 process areas, is to assemble the product from the product components, ensure that the product, as integrated, functions properly, and deliver the product.

16 Verification Verification, a level 3 process area, is to ensure that selected work products meet their specified requirements. Verification encompasses the reviews of artifacts at various phases of the project lifecycle, involves the following: verification preparation, verification performance, and identification of corrective action

17 Validation Validation, level 3 process area, is to demonstrate that a product or product component fulfills its intended use when placed in its intended environment. Validation confirms the implementation of the requirements as stated in Functional / Technical Specification Document

18 Understanding Verification & Validation
Verification addresses whether the work product properly reflects the specified requirements Validation demonstrates that the product, as provided, will fulfill its intended use Verification ensures that “you built it right” Validation ensures that “you built the right thing” Often, the end users and other relevant stakeholders are involved in the validation activities. Both verification and validation activities use similar approaches (e.g., test, analysis, inspection, demonstration, or simulation). Both validation and verification activities often run concurrently and may use portions of the same environment.

19 Project Management PAs
Project Planning Risk Management Integrated Project Management +IPPD Project Monitoring and Control Quantitative Project Management Supplier Agreement Management

20 Project Planning Project Planning, level 2 process area, is to establish and maintain plans that define project activities. Involves the following: Developing the project plan Interacting with stakeholders appropriately Getting commitment to the plan Maintaining the plan Planning involves scoping, estimation, defining project lifecycle, budgeting, scheduling, identifying risks, resources required, knowledge & skills needed, identifying & involving stakeholders

21 Project Planning …contd.
At the commencement of the project, a detailed project plan encompassing other related plans viz., Quality Plan, Configuration Plan, Metrics Plan, Training Plan etc. is prepared, reviewed and base-lined with commitments from relevant stakeholders. This forms the basis for the project monitoring and control activities.

22 Risk Management Risk Management, a level 3 process area, is to identify potential problems before they occur so that risk-handling activities can be planned and invoked as needed across the life of the product or project to mitigate adverse impacts on achieving objectives Risks are potential problems that may occur during the project execution. Their occurrence may have adverse effect on the project. Risk management process area addresses identification, monitoring, mitigation and handling of the risk-prone areas in the project.

23 Risk Management …contd.
Based on probability and severity of impact and of the identified risks, risk criticality is calculated for each risk. Overall project risk rating (on a 1-5 scale) is calculated for each project. Risk responses are planned and implemented Risks are monitored throughout the execution of the project.

24 Integrated Project Management + IPPD
Integrated Project Management, a level 3 process area, is to establish and manage the project and the involvement of the relevant stakeholders according to an integrated and defined process that is tailored from the organization’s set of standard processes. Tailoring the standard web qualify process to meet project specific requirements Implementing the project as per the defined processes Contributing lessons learnt, best practices, sample documents, risks, etc to the project knowledge base Proactively managing stakeholder (customers, customer facing units, collaborating units, HR, CS, N&S, etc) needs, commitments, concerns and resolving coordination issues

25 Integrated Project Management + IPPD
…contd. The Project Knowledge Base (PKB) comprises of Best Practices, Lessons Learnt, Risks and Sample Artifacts obtained from previous projects. This PKB is managed by the Process Management Group (PMG) and is available in eSupport. Project teams upload the artifacts in PKB and PMG reviews them. The specific process for each project is derived from the QMS, with inputs from the tailoring guidelines and the Project Knowledge Base. The project specific process is documented in the Project Plan and the Project Tailoring Record. This forms the basis for the execution of the project by the project team.

26 Project Monitoring & Control
Project Monitoring and Control, a level 2 process area, is to provide an understanding of the project’s progress so that appropriate corrective actions can be taken when the project’s performance deviates significantly from the plan. Project Plan forms the basis for the project monitoring and controlling activities. The project’s progress is monitored against the plan. The analysis of planned vs actual facilitates early detection of slippages and implementation of corrective actions. Periodic reviews and metrics analysis provide inputs for taking appropriate actions in a timely manner.

27 Quantitative Project Management
Quantitative Project Management, a level 4 process area, is to manage the project with metrics to achieve the project’s established quality and process-performance objectives. Identifying goal metrics (refer to contract, MSA, SLA, PMI for identifying applicable metrics) and target, lower limit and upper limit values Identifying control metrics for each goal metric to monitor & control during the execution of the project Determine target, lower limit and upper limit values for control metrics from the BU / Organization level baselines Statistically analyzing the control metrics data to identify and understand process variation Predict the performance of goal metrics based on control metric performance Implementing corrective actions in case control metrics are operating outside the established limits Six sigma projects executed at project level can be demonstrated

28 Supplier Agreement Management
Supplier Agreement Management, a level 2 process area, is to manage the acquisition of products from suppliers. Implementation of SAM will be demonstrated at the organization level Selecting suppliers, Establishing and maintaining agreements with suppliers, Executing the supplier agreement, Accepting delivery of acquired products, and Transitioning acquired products to the project teams will be covered

29 Support PAs Configuration Management Measurement and Analysis
Process and Product Quality Assurance Decision Analysis and Resolution Causal Analysis and Resolution

30 Configuration Management
Configuration Management, a Level 2 Process Area, addresses configuration identification, configuration control, configuration status accounting, and configuration audits. The SCIs are identified at the project planning stage. These are documented along with their naming convention in the Software Configuration Management Plan (SCMP) section of the Project Plan. The typical SCIs are requirements document, Software Requirements Specifications, Design, test cases, source code, etc. Microsoft Visual Source Safe (VSS) is the default Configuration Management tool that is being used n Mahindra Satyam. However, based on customer or project requirement, a different tool may be used. This shall be documented in the project plan. Changes are controlled as per the defined process. The Traceability Matrix plays a major role during this. The frequency and timelines for configuration status reporting and configuration audits are planned at the project planning stage and documented in the SCMP section of the project plan.

31 Measurement & Analysis
Measurement and Analysis, a level 2 process area, is to develop and sustain a measurement capability that is used to support management information needs. Involves the following: Specifying the measures, Analysis techniques Mechanism for data collection, data storage, reporting, and feedback Providing objective results that can be used in making informed decisions, and taking appropriate corrective actions Metrics section in project plan, DCF, MAR, data is various tools are the artifacts related to this process area

32 Process & Product Quality Assurance
PPQA, a level 2 process area, ensures that defined processes are implemented in projects, while the practices in the Verification process area ensure that the products meet the specified requirements. These two process areas may on occasion address the same artifact, but from different perspectives.

33 Decision Analysis and Resolution
Decision Analysis and Resolution, a level 3 process area, is to analyze possible decisions using a formal evaluation process that evaluates identified alternatives against established criteria. DAR can be invoked for making critical decisions that have an impact on the project effort, schedule, quality and scope. Typical scenarios where DAR is applicable are: Evaluating multiple design alternatives Evaluating decisions for make / buy / reuse of software components Evaluating technology and process improvement proposals Taking critical decisions during project planning and execution Deciding on Risk Management strategies

34 Causal Analysis and Resolution
Causal Analysis and Resolution, a level 5 process area, is to identify causes of defects and other problems and take action to prevent them from occurring in the future. Defect data is gathered from Reviews, Inspections and Testing. A subset of this data is subjected to causal analysis and resolution to identify the potential causes for the same. Pareto chart is used for prioritizing Root cause analysis (using fish-bone diagram) is done for identifying the root causes Corrective & preventive actions are initiated and tracked to closure

35 Process PAs Organizational Process Definition +IPPD
Organizational Process Focus Organizational Training Organizational Process Performance Organizational Innovation and Deployment

36 Organization Process Definition + IPPD
Organizational Process Definition, a level 3 process area, is to establish and maintain a usable set of organizational process assets and work environment standards. Web Qualify (Mahindra Satyam’s QMS) comprises various lifecycle methodologies, procedures, guidelines, work-products, sample documents, process database (baselines), training materials, etc Web Qualify is maintained by PMG. PKB (in eSupport) is repository for best practices, lessons learnt, risks, etc.

37 Organization Process Focus
Organizational Process Focus, a level 3 process area, is to plan, implement, and deploy organizational process improvements. PMG continuously identifies the potential areas that require process improvements. The inputs for this are the industry standard global quality models, requirements from the customers, process implementation, project process monitoring and internal quality audits. PMG draws and implements plans to define the project / organization level process improvements.

38 Organization Training
Organizational Training, a level 3 process area, is to develop the skills and knowledge of people so they can perform their roles effectively and efficiently. Addresses imparting training to associates at both Project Level and Organization Level The training needs for the associates are identified at project planning stage and also during the performance appraisals. These training needs are collated by SLC in order to arrive at the training calendar. Project specific training can also be arranged and conducted by BU. The training may also cover QMS and software engineering topics as well. SLC release training calendar that cover technical, management, soft skill disciplines

39 Organization Process Performance
OPP, a level 4 process area, is to establish and maintain a quantitative understanding of the performance of the organization’s set of standard processes in support of quality and process-performance objectives, and to provide the process-performance data, baselines, and models to quantitatively manage the organization’s projects. Relationship between goal metrics and control metrics are identified and established Business unit / organization level metrics baselines are established Defect prediction model is used to predict delivered defect density based on defect injection rate, defect detection efficiencies

40 Organization Innovation & Deployment
OID, a level 5 process area, is to select and deploy incremental and innovative improvements that measurably improve the organization’s processes and technologies. At Mahindra Satyam, improvements are identified via the following means: Process improvements identified by PMG based on process performance data QMS Feedback given by associates Idea junction Best practices and project innovations from projects Initiatives identified by Senior Management Technology improvements identified by IIS From an external industry practice

41 CMMI Assessment Roadmap
# Milestones 1 CMMI Overview training 2 Process Adequacy Review 3 High Maturity Practice Review 4 Implementation Review - 1 5 Implementation Review - 2 6 Implementation Review - 3 7 Implementation Review - 4 8 Preparation of PIID 9 CMMI Intro Training 10 ATM Team 11 SCAMPI Class B Assessment 12 SCAMPI Class A Assessment

42 Role of Project Teams Understand the model and the quality management system Execute the projects as per the defined processes. Ensure completeness and correctness of all the work-products / quality records / metrics data & reports / etc Ensure integrity of data between various tools and templates Prepare the PIID (Process Implementation Indicator Document ) document for your project Participate in reviews and assessments: Implementation Reviews SCAMPI Class B assessment SCAMPI Class A assessment SCAMPI Class B / Class A assessment comprising of two activities: Presentation on the project (1 ½ hour) Interview by the assessment team (1 ½ hour)

43 Process Implementation Indicator Document (PIID)
PIID template list all the process areas category wise – Engineering, Project Management, Process and Support process areas Site practices, applicable procedures, guidelines and templates for each goal is identified Project teams need to update the PIID template with the relevant project documents for each of the applicable process areas

44 Question & Answer Session
For any suggestions, please mail to:


Download ppt "Training on “CMMI for Development – ver 1.2”"

Similar presentations