Presentation is loading. Please wait.

Presentation is loading. Please wait.

BUILDING STRONG SM Society of American Military Engineers and U.S. Army Corps of Engineers, Little Rock District 2009 SAME Symposium Little Rock District’s.

Similar presentations


Presentation on theme: "BUILDING STRONG SM Society of American Military Engineers and U.S. Army Corps of Engineers, Little Rock District 2009 SAME Symposium Little Rock District’s."— Presentation transcript:

1 BUILDING STRONG SM Society of American Military Engineers and U.S. Army Corps of Engineers, Little Rock District 2009 SAME Symposium Little Rock District’s FY09 Workload Mark Milholland Chief, Programs and Project Management Div April 28 – 29, 2009

2 BUILDING STRONG SM Agenda (Overview of Little Rock District Projected Work)  FY09 Stimulus Types of Work  FY09 Supplemental Funded Projects  FY09 MILCON Projects  FY09 Support for Others Projects (VA)  FY09 Civil Works Projects (GI and CAP)  FY09 O&M Projects (CW)  Questions and Answers

3 BUILDING STRONG SM

4 FY09 Economic Stimulus Dept of Defense (Civil) Dept of the Army Corps of Engineers  $4.6B will be provided to USACE  Specific criteria in allocation of funds  Usage of funds Investigations Construction MS River and Tributaries O&M Regulatory Remedial Action Program Flood Control/Costal Emergencies

5 BUILDING STRONG SM  SWL is assessing the entire program to identify projects that could qualify for the stimulus:  Projects to be obligated/executed quickly  Projects that can be executed with little schedule risk  Projects that will result in high/immediate employment  Projects that will complete either a project phase or the project FY09 Economic Stimulus

6 BUILDING STRONG SM FY09 Supplemental Funded Projects Project (and Location) Advertise Cost Date Range Park Repairs @ Various Locations 3 rd /4 th Qtr cost varies Trash Rack @ Nimrod Lake 4 th Qtr $100k - $250k Trash Rack – Debris Removal @ Ozark 3 rd Qtr up to $100k Emergency Pump Station @ Dardanelle 3 rd Qtr $250k - $500k Repairs of Office Building, Table Rock 3 rd Qtr up to $100k AR-White/Jim Smith Repairs 3 rd Qtr $1M - $5M

7 BUILDING STRONG SM Project Location Advertise Date Cost Range AD/AL Fitness Center Goodfellow AFB 3 rd Qtr $5M-$10M Student Activity Ctr/Lib Laughlin AFB 3 rd Qtr $5M-$10M MATOC Ft. Polk 3 rd Qtr up to $125M Education Center LRAFB 3 rd Qtr over $10M (Bomb Storage Infra Pine Bluff Arsenal 1st Qtr of FY10 over $10M) (Flight Simulator Add LRAFB 1st Qtr of FY10 $5M-$10M) FY09 MILCON Projects

8 BUILDING STRONG SM FY09 Civil Works and Support for Others Civil Works: Project Location Advertise Cost Date Range Grassy Lake Ecosystem (A-E)4 th Qtr up to $50k Highway 58, Guion, AR4 th Qtr $500k - $1M Support for Others: Project Location Advertise Cost Date Range VA MATCO (Design-Build) AR, TX, OK & MS 4 th Qtr up to $350M

9 BUILDING STRONG SM Project Location Advertise Cost DateRange Hardin Void Investigation (Core Drilling) 3 rd Qtr up to $500k MCC Panels Locks #4, #5 and #6 3 rd Qtr up to $500k Paint/Rehab Tainter Gates @ Murray Lock #7 2 nd Qtr $1M - $5M Replacement of Bulkhead Structure, Greers Ferry 2 nd Qtr $1M - $5M Rehab/Paint Bridge Superstructure, Bull Shoals 3 rd Qtr $1M - $5M Stop Logs and Lifting Beams, MKARNS3 rd Qtr $100k-$250k Construct Intake System, Clearwater Lake3 rd Qtr $100k-$250k MCC Panels Lock #12 (Ozark-Jeta Taylor) 3 rd Qtr $100k-$250k Various Mowing and Landscape Service3 rd /4 th Qtr $250k -$1M Various Park Cleanup and Attendant Services 3rd/4th Qtr $250k -$1M Various Janitorial Services3rd/4th Qtr $250k -$1M Emergency Generator, Ozark4 th Qtr $5M - $10M FY09 O&M Projects

10 BUILDING STRONG SM Questions ???


Download ppt "BUILDING STRONG SM Society of American Military Engineers and U.S. Army Corps of Engineers, Little Rock District 2009 SAME Symposium Little Rock District’s."

Similar presentations


Ads by Google