Short-term rehabilitation planning of water distribution networks Tomáš Kučera Ladislav Tuhovčák BRNO UNIVERSITY OF TECHNOLOGY Faculty of Civil Engineering.

Similar presentations


Presentation on theme: "Short-term rehabilitation planning of water distribution networks Tomáš Kučera Ladislav Tuhovčák BRNO UNIVERSITY OF TECHNOLOGY Faculty of Civil Engineering."— Presentation transcript:

1 Short-term rehabilitation planning of water distribution networks Tomáš Kučera Ladislav Tuhovčák BRNO UNIVERSITY OF TECHNOLOGY Faculty of Civil Engineering Institute of Municipal Water Management BRNO, Czech Republic

2 http://water.fce.vutbr.cz2/27 Water pipes in Czech Republic  64.500 km water mains in the CR  about 800 km per year should be rehabilitated  questions What approach to reconstruction is the most suitable? What technology should be used?

3 http://water.fce.vutbr.cz3/27 Rehabilitation Planning  terms long (15-20 years) middle (3-5 years) short (annual)

4 http://water.fce.vutbr.cz4/27 Annual Rehabilitation Planning  main goal propose some pipes for rehabilitation  questions where? when? how? cost?

5 http://water.fce.vutbr.cz5/27 Planning diagram

6 http://water.fce.vutbr.cz6/27 Steps of annual rehab planning 1.Basic elements

7 http://water.fce.vutbr.cz7/27 The basic elements  hydraulic sections not favourable often too short  entities several hydraulic sections with the same parameters:  diameter  material  installation year  system of streets  pattern of development  map of valves

8 http://water.fce.vutbr.cz8/27 Steps of annual rehab planning 2.Obtaining of basis data

9 http://water.fce.vutbr.cz9/27 The basis data  town planning scheme  Water-supply topology, mathematic model  regulations for water supply operation  long and middle term rehab plan  operation documentation failures leakages television inspection survey analysis of water quality  co-ordinations

10 http://water.fce.vutbr.cz10/27 Steps of annual rehab planning 3.Criteria

11 http://water.fce.vutbr.cz11/27 The set of criteria by CARE-W 1. Internal  Annual Repair Cost  Water Losses Index

12 http://water.fce.vutbr.cz12/27 The set of criteria by CARE-W 2. External  Water Interruptions Predicted Water Interruption Predicted Critical Water Interruption Predicted Frequency of Water Interruption  Damage and disruptions Damage due to Flooding in Housing area Damage due to Flooding in Industrial or commercial areas Damages due to Soil Movement Traffic Disruption Damages and/or Disruption on other Infrastructure  Water Quality Deficiencies  Hydraulic Deficiencies

13 http://water.fce.vutbr.cz13/27 The set of criteria by CARE-W 3. Other  Co-ordination with other utilities and roadway rehabilitation programmes with service connection replacement programmes

14 http://water.fce.vutbr.cz14/27 The simple set of criteria

15 http://water.fce.vutbr.cz15/27 Steps of annual rehab planning 4.Selecting of entities

16 http://water.fce.vutbr.cz16/27 Multi-criteria assessment  selecting a set of some elements (pipe- sections, entities) for rehabilitation  sorting procedure the method of average weighting => sort list  ranking procedure the Electre methods => categories CARE-W_ARP (INSA Lyon)

17 http://water.fce.vutbr.cz17/27 Steps of annual rehab planning 5.Rehab technologies

18 http://water.fce.vutbr.cz18/27 Database of the rehab technologies  the selection of the right rehab technology for the sorted elements  rehab technologies for water mains open-trench trenchless  evaluation of every technology by criteria

19 http://water.fce.vutbr.cz19/27 Database of the rehab technologies  applicability  costs  influence on environment pipe material water quality hydraulic properties  supplemental information maximum length of pipe-section realisation time armature removing

20 http://water.fce.vutbr.cz20/27 Decision support for the Annual Planning 1.CARE-W_ARP

21 http://water.fce.vutbr.cz21/27 Priorities of operator „BVK“ Weight of criteria [%] Co-ordination Score3030 Annual Repair Cost2020 Traffic Disruption14 Year of laid1010 Predicted Critical Water Interruption8 Predicted Water Interruption6 Predicted Frequency of Water Interruption6 Damage due to Flooding in Housing area6

22 http://water.fce.vutbr.cz22/27 Annual Rehab Plan for Sub-zone by CARE-W_ARPby BVK (operator)

23 http://water.fce.vutbr.cz23/27 Decision support for the Annual Planning 2.NetPlan_A

24 http://water.fce.vutbr.cz24/27 NetPlan_A  Knowledge basis Data  Input  Criteria Pipe materials Rehab technologies

25 http://water.fce.vutbr.cz25/27 NetPlan_A  Task Data evaluating Sector value Criteria calculation Entities assortment Technology proposition

26 http://water.fce.vutbr.cz26/27 Conclusions  main goal: to create a comprehensive support for annual rehab planning, which will be applicable in the conditions of the Czech Republic

27 Brno University of Technology http://water.fce.vutbr.cz Tomáš Kučera kucera.t@fce.vutbr.cz Thank you for your attention